A Program of Two-Phase Flow Investigation Quarterly Report: First Quarterly Report, March-June, 1963 (open access)

A Program of Two-Phase Flow Investigation Quarterly Report: First Quarterly Report, March-June, 1963

Task A: Modification and Preparation of Experimental Facility. Facility engineering and layout is about seventy-five percent complete. Task B: Design and Construction of Test Sections. The major dimensions and characteristics of the metal and glass test sections have been calculated. One feasibility test of the electrically conducting coating on samples of glass tubing has been completed. Task C: Design and Construction of Test Stand, Task E: Pressure and Temperature Instrumentation for Test Section and Task F: Power Supply for Test Section. Preliminary engineering has been initiated on these tasks. The planned approach has been defined in each case. For Task E the transducer specifications have been defined and quotations on and/or sample units of the transducers have been requested. Tasks C and F can proceed with detailing as soon as drafting on Task B is about 50 percent complete. This point is scheduled to be reached during the first part of July. Task D: Void Fraction Instrumentation. The requirements for the x-ray instrumentation have been considered in the course of Task B and the x-ray power supply is presently on hand. The detailed engineering effort on this task is not scheduled to begin before July.
Date: June 24, 1963
Creator: Staub, F. W. & Zuber, N.
System: The UNT Digital Library