Federal/State Regulatory Permitting Actions in Selected Nuclear Power Station Licensing Cases
Abstract: This report documents the Federal/State regulatory permitting actions in 12 case histories of nuclear power station licensing in nine different states. General observations regarding Federal/State siting roles in the siting process include: new regulations, with the exceptions of those imposed by NEPA, were not found to be the source of significant delay; interventions were the sources of significant delay in only two cases; in only two cases was a local agency a source of delay; no one factor was found to be a source of delay, rather several factors often combined to cause delay; it is still too early to assess the influence of State power plant siting laws on the licensing process; clarification of the word "delay" is needed; water related issues predominate in State permitting requirements associated with delay; generalizations on the sources and nature of delay in the licensing process are difficult to make because of site specific characteristics; and frequently problems outside the Federal/State realm have had, or can have, a delaying effect on the process. Eleven of the case histories are illustrated with a logic network that gives the actions of the utilities in addition to the Federal/State permits.
Date:
June 1977
Creator:
U.S. Nuclear Regulatory Commission. Office of State Programs.
Object Type:
Report
System:
The UNT Digital Library
Fuel Rod Material Behavior During Test PCM-1
This report presents the analysis of the fuel rod materials behavior based on the postirradiation examination of the Test PCM-1 fuel rod from the Power-Cooling-Mismatch Test Series.
Date:
June 1979
Creator:
Cook, Beverly A.
Object Type:
Report
System:
The UNT Digital Library
Appendix G. U0₂ Oxidation Calculation
Appendix to report presenting detailed data from the postirradiation examination and pretest characterization for Test PCM-1, including the U0₂ oxidation calculation.
Date:
June 1979
Creator:
Cook, Beverly A.
Object Type:
Report
System:
The UNT Digital Library
Appendix F. Cladding Thermal Conductivity Changes
Appendix to report presenting detailed data from the postirradiation examination and pretest characterization for Test PCM-1, including changes in cladding thermal conductivity with oxidation to ZrO₂.
Date:
June 1979
Creator:
Cook, Beverly A.
Object Type:
Report
System:
The UNT Digital Library
Appendix C. Metallographic Examination
Appendix to report presenting detailed data from the postirradiation examination and pretest characterization for Test PCM-1, including additional metallography illustrating the physical and chemical changes in the cladding and fuel.
Date:
June 1979
Creator:
Cook, Beverly A.
Object Type:
Report
System:
The UNT Digital Library
Appendix D. Particle Size Analysis
Appendix to report presenting detailed data from the postirradiation examination and pretest characterization for Test PCM-1, including tabulated data from the particle size analysis of the broke fuel rod pieces.
Date:
June 1979
Creator:
Cook, Beverly A.
Object Type:
Report
System:
The UNT Digital Library
Appendix B. Test Rod Power Profile
Appendix to report presenting detailed data from the postirradiation examination and pretest characterization for Test PCM-1, including a description of the axial power profile.
Date:
June 1979
Creator:
Cook, Beverly A.
Object Type:
Report
System:
The UNT Digital Library
Appendix A. Pretest Fuel Rod and Shroud Characteristics and Instrumentation
Report presenting the pretest physical characteristics and instrumentation of the Test PCM-1 (Power-Cooling Mismatch Test Series) fuel rod and shroud components.
Date:
June 1979
Creator:
Cook, Beverly A.
Object Type:
Report
System:
The UNT Digital Library
Appendix E. Microprobe Examination
Appendix to report presenting detailed data from the postirradiation examination and pretest characterization for Test PCM-1, including details of the microprobe examination.
Date:
June 1979
Creator:
Cook, Beverly A.
Object Type:
Report
System:
The UNT Digital Library
[Power Calibration and Preconditioning Data Measurements for Reactivity Initiated Accident (RIA) Test Series 1, Test RIA 1-2]
Graphs showing power calibration and preconditioning data for the second of six planned tests in the Reactivity Initiated Accident (RIA) Test Series 1, Test RIA 1-2. Results are presented for the time after the start of power calibration in hours for each variable (see pages ix - xi of report).
Date:
June 1979
Creator:
EG & G Idaho
Object Type:
Dataset
System:
The UNT Digital Library
[MRBT Bundle B-6 Transient Test and Posttest Deformation Data]
Computer-generated graphical and tabular presentations of transient test and posttest deformation data for Multirod Burst Test (MRBT) Bundle B-6 (see pages 131-141 of report). "The primary objective of this 8 x 8 multirod burst test was to investigate cladding de-formation in the alpha-plus-beta-Zircaloy temperature range under simulated light-water-reactor (LWR) loss-of-coolant accident (LOCA) conditions. B-6 test conditions simulated the adiabatic heatup (reheat) phase of an LOCA and produced very uniform temperature distributions." - from Abstract
Date:
June 11, 1984
Creator:
Oak Ridge National Laboratory. Engineering Technology Division.
Object Type:
Dataset
System:
The UNT Digital Library
[Appendix E. Extended Analysis Microfiche]
Graphical presentations of data from the 1/5-scale Mark I BWR Pressure Suppression Experiment (PSE) air transient tests, including HVLF Characterization Data, Impulse Characterization, Computed Load Cell Response Histories and Frequency Analyses, and Enthalpy Flux Evaluation (see Table E-1. Summary of microfiche descriptions)
Date:
June 1980
Creator:
Lawrence Livermore National Laboratory
Object Type:
Dataset
System:
The UNT Digital Library