Habitat Development Field Investigations, Windmill Point Marsh Development Site, James River, Virginia: Appendix B (open access)

Habitat Development Field Investigations, Windmill Point Marsh Development Site, James River, Virginia: Appendix B

Appendix containing supplementary data on the occurrence of taxa in macrobenthos samples organized by stratum and season. It accompanies a report on the environmental impacts of marsh development with dredged material as part of a study on the feasibility of marsh development using dredged material at the Windmill Point Marsh Development Site, James River, Virginia.
Date: June 1978
Creator: Virginia Institute of Marine Science
Object Type: Report
System: The UNT Digital Library
Habitat Development Field Investigations, Windmill Point Marsh Development Site, James River, Virginia: Appendix L (open access)

Habitat Development Field Investigations, Windmill Point Marsh Development Site, James River, Virginia: Appendix L

Appendix containing a statistical analysis of catch data from Nekton observed to accompany a report on the environmental impacts of marsh development with dredged material as part of a study on the feasibility of marsh development using dredged material at the Windmill Point Marsh Development Site, James River, Virginia.
Date: June 1978
Creator: Virginia Institute of Marine Science
Object Type: Report
System: The UNT Digital Library
Habitat Development Field Investigations, Windmill Point Marsh Development Site, James River, Virginia: Appendix P (open access)

Habitat Development Field Investigations, Windmill Point Marsh Development Site, James River, Virginia: Appendix P

Appendix containing statistical data taken on the Ictalurus Punctatus (channel catfish) to accompany a report on the environmental impacts of marsh development with dredged material as part of a study on the feasibility of marsh development using dredged material at the Windmill Point Marsh Development Site, James River, Virginia.
Date: June 1978
Creator: Virginia Institute of Marine Science
Object Type: Report
System: The UNT Digital Library
Habitat Development Field Investigations, Windmill Point Marsh Development Site, James River, Virginia: Appendix G (open access)

Habitat Development Field Investigations, Windmill Point Marsh Development Site, James River, Virginia: Appendix G

Appendix containing abundance and diversity measures for meiobenthos in each 3.8 CM^2 sample to accompany a report on the environmental impacts of marsh development with dredged material as part of a study on the feasibility of marsh development using dredged material at the Windmill Point Marsh Development Site, James River, Virginia.
Date: June 1978
Creator: Virginia Institute of Marine Science
Object Type: Report
System: The UNT Digital Library

BRAC 2005 Report to the Base Closure and Realignment Commission: Air Force Justification Book

COBRA Program - Langley Air Force Base, VA
Date: June 17, 2005
Creator: United States. Department of Defense.
Object Type: Dataset
System: The UNT Digital Library
An analytical investigation of airplane spin-recovery motion by use of rotary-balance aerodynamic data (open access)

An analytical investigation of airplane spin-recovery motion by use of rotary-balance aerodynamic data

From Introduction: "Many investigations have been made in the Langley 20-foot free-spinning tunnel in which the natures of airplane spins and recoveries have been determined experimentally with dynamically scaled-down models. The results of some of these investigations are presented in references 1 to 5."
Date: June 1954
Creator: Scher, Stanley H.
Object Type: Report
System: The UNT Digital Library
An Analysis of the Variation With Altitude of Effective Gust Velocity in Convective-Type Clouds (open access)

An Analysis of the Variation With Altitude of Effective Gust Velocity in Convective-Type Clouds

From Introduction: "In the present paper, the variation of effective gust velocity in convective-type clouds with altitude is investigated. Data obtained during 1941 and 1942 at altitudes up to 34,000 feet and data obtained more recently from the Thunderstorm Project (reference 5) at altitudes up to 26,000 feet are utilized for this purpose. Consideration is given in analyzing the results both to data for the range
Date: June 1948
Creator: Tolefson, H. B.
Object Type: Report
System: The UNT Digital Library

National Uranium Resource Evaluation: Greensboro Quadrangle, North Carolina and Virginia, Appendix A-F

Appendices containing data on uranium availability in Greensboro Quadrangle to accompany a report on U.S. uranium resources in North Carolina and Virginia.
Date: June 1982
Creator: Dribus, J. R.; Hurley, B. W.; Lawton, David E. & Lee, C. H.
Object Type: Dataset
System: The UNT Digital Library
Habitat Development Field Investigations, Windmill Point Marsh Development Site, James River, Virginia: Appendix D (open access)

Habitat Development Field Investigations, Windmill Point Marsh Development Site, James River, Virginia: Appendix D

This report follows the Windmill Point marsh habitat development project. The marsh was constructed in the James River between November 1974 and February 1975, then studied for benthic invertebrates, fish, wildlife, plants and soil characteristics from the summer of 1976 to fall of 1977.
Date: June 1978
Creator: Virginia Institute of Marine Science
Object Type: Report
System: The UNT Digital Library
National Uranium Resource Evaluation: Greensboro Quadrangle, North Carolina and Virginia (open access)

National Uranium Resource Evaluation: Greensboro Quadrangle, North Carolina and Virginia

From Introduction: "The Greensboro Quadrangle is in North Carolina and Virginia between lat. 36ºN. and 37ºN. and long. 78ºW. and 80ºW. (Fig. 1). The quadrangle was evaluated to identify and delineate areas favorable for the occurrence of uranium deposits."
Date: June 1982
Creator: Dribus, J. R.; Hurley, B. W.; Lawton, David E. & Lee, C. H.
Object Type: Report
System: The UNT Digital Library
Corrosion and Protection of Steel Piles in a Natural Seawater Environment (open access)

Corrosion and Protection of Steel Piles in a Natural Seawater Environment

From Introduction: "This paper describes some results of the first eight years of a fifteen year program in which a variety of coating and catholic protection systems are evaluated on their ability to protect steel piles in offshore conditions at Dam Neck, Virginia. It includes a description of the methods used in the evaluation and the results found on these systems."
Date: June 1977
Creator: Escalante, E.; Iverson, W. P.; Gerhold, W. F.; Sanderson, B. T. & Alumbaugh, R. L.
Object Type: Report
System: The UNT Digital Library
BRAC 2005 Report to the Bases Realignment and Closure Commission; Industrial JCSG Justification Book (open access)

BRAC 2005 Report to the Bases Realignment and Closure Commission; Industrial JCSG Justification Book

Ship Intermediate Maintenance Activity, Norfolk Justification Book
Date: June 10, 2005
Creator: United States. Department of Defense.
Object Type: Book
System: The UNT Digital Library
BRAC 2005 Report to the Base Closure and Realignment Commission: Army Justification Book (open access)

BRAC 2005 Report to the Base Closure and Realignment Commission: Army Justification Book

Disregard Restriction Header and Footer - Fort Monroe, VA - Impacted Sites: FORT MONROE, VA; FORT EUSTIS, VA; FORT KNOX, KY
Date: June 10, 2005
Creator: United States. Department of Defense.
Object Type: Book
System: The UNT Digital Library
Summary of Cummulative Environmental Impacts -National Naval Medical Center Bethesda, MD (open access)

Summary of Cummulative Environmental Impacts -National Naval Medical Center Bethesda, MD

Disregard restriction header and footer - Summary of Environmental Impacts and Costs for National Naval Medical Center, Bethesda MD
Date: June 23, 2005
Creator: United States. Department of Defense.
Object Type: Text
System: The UNT Digital Library
Summary of Cummulative Environmental Impacts Naval Surface Warfare Center, Dahlgren VA (open access)

Summary of Cummulative Environmental Impacts Naval Surface Warfare Center, Dahlgren VA

Disregard restriction header and footer - Summary of Environmental Impacts and Costs for Naval Surface Warfare Center, Dahlgren
Date: June 23, 2005
Creator: United States. Department of Defense.
Object Type: Text
System: The UNT Digital Library
Summary of Cummulative Environmental Impacts for Navy -Norfolk/Philadelphia (open access)

Summary of Cummulative Environmental Impacts for Navy -Norfolk/Philadelphia

Disregard restriction header and footer - Summary of Environmental Impacts and Costs for Naval Air Station Oceana Virginia, Naval Support Activity Norfolk, Naval Station, NOrfolk, Naval Shipyard-Norfolk, Naval Amphibious Base-Little Creek VA, and NSA Philadelphia PA
Date: June 23, 2005
Creator: United States. Department of Defense.
Object Type: Text
System: The UNT Digital Library
Summary of Cummulative Environmental Impacts -Arlington Service Center, Virginia (open access)

Summary of Cummulative Environmental Impacts -Arlington Service Center, Virginia

Disregard restriction header and footer - Summary of Environmental Impacts and Costs for (Naval)Arlington Service Center, Virginia
Date: June 23, 2005
Creator: United States. Department of Defense.
Object Type: Text
System: The UNT Digital Library
Summary of Cummulative Environmental Impacts -Defense Distribution Depot Richmond Virginia (open access)

Summary of Cummulative Environmental Impacts -Defense Distribution Depot Richmond Virginia

Realign Defense Supply Center Richmond (DSCR), VA by relocating the storage and distribution functions and associated inventories of the Defense Distribution Depot Richmond, VA, to the Susquehanna Strategic Distribution Platform
Date: June 23, 2005
Creator: United States. Department of Defense.
Object Type: Text
System: The UNT Digital Library
Base Input from BRAC Commission Visit to NAS Oceana, VA dtd 24MAY05 (open access)

Base Input from BRAC Commission Visit to NAS Oceana, VA dtd 24MAY05

Base Input from BRAC Commission Visit to NAS Oceana, VA, regarding encroachment issues. This is a briefing that was presented by Capt. Tom Keeley, USN, Commanding Office, NAS Oceana.
Date: June 23, 2005
Creator: unknown
Object Type: Text
System: The UNT Digital Library
Base Visit Book from BRAC Commission Visit to Naval Station Norfolk, VA dtd 24 May 2005 (open access)

Base Visit Book from BRAC Commission Visit to Naval Station Norfolk, VA dtd 24 May 2005

Base Visit Book from BRAC Commission Visit to Naval Station Norfolk, VA dtd 24 May 2005. Book includes itinerary, base summary sheet, SECDEF recommendations, installation review, and additional information.
Date: June 23, 2005
Creator: unknown
Object Type: Book
System: The UNT Digital Library
Department of Defense Input on Fort Monroe, VA dtd 1 June 2005 (open access)

Department of Defense Input on Fort Monroe, VA dtd 1 June 2005

103-06A-A1 Department of Defense Input on Fort Monroe, VA dtd 1 June 2005. Includes briefing on environmental remediation costs, disposal of historic structures, and the administrative capabilities of Fort Monroe.
Date: June 23, 2005
Creator: United States. Department of Defense.
Object Type: Text
System: The UNT Digital Library
Base Input from BRAC Commission Visit to Fort Eustis, VA dtd 25 May 05 (open access)

Base Input from BRAC Commission Visit to Fort Eustis, VA dtd 25 May 05

103-06A-A2 Base Input from BRAC Commission Visit to Fort Eustis, VA dtd 25 May 05. Presentation includes BRAC report recommendations, transportation school impacts, U.S. Army Aviation School impacts, and Ft Eustis and Ft Story installation impacts.
Date: June 23, 2005
Creator: unknown
Object Type: Text
System: The UNT Digital Library
Letter from Joe S. Frank to Chariman Principi dtd 16 JUNE 2005 (open access)

Letter from Joe S. Frank to Chariman Principi dtd 16 JUNE 2005

Executive Correspondence - Letter from Joe S. Frank, Mayor of the City of Newport News, Virginia, to Chairman Principi regarding BRAC recommendation for Fort Eustis.
Date: June 24, 2005
Creator: unknown
Object Type: Letter
System: The UNT Digital Library
Summary of Cummulative Environmental Impacts -Marine Corps Base Quantico (open access)

Summary of Cummulative Environmental Impacts -Marine Corps Base Quantico

Disregard restriction header and footer - Summary of Environmental Impacts and Costs for Marine Corps Base Camp Quantico
Date: June 23, 2005
Creator: United States. Department of Defense.
Object Type: Text
System: The UNT Digital Library