Collection
Serial/Series Title
States
49 Matching Results
Results open in a new window/tab.
prev
Results:
49 - 49 of
49
Ocean thermal energy. Quarterly report, April-June 1982
This quarterly report includes summaries of the following tasks: (1) OTEC pilot plant conceptual design review; (2) OTEC methanol; (3) management decision requirements for OTEC construction; (4) hybrid geothermal - OTEC (GEOTEC) power plant performance estimates; and (5) supervision of testing of pneumatic wave energy conversion system.
Date:
June 30, 1982
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library