[Letter from Mike Woiwode to Anthony J. Principi - June 23, 2005] (open access)

[Letter from Mike Woiwode to Anthony J. Principi - June 23, 2005]

Letter from Mike Woiwode to Anthony Principi regarding the Marine Corps Recruit Depot in San Diego, California. Woiwode argues that the MCRD is vital and should remain at its present location.
Date: June 23, 2005
Creator: Woiwode, Michael (Mike)
Object Type: Letter
System: The UNT Digital Library
[Memorandum of Meeting: Naval Air Depot North Island, California, June 7, 2005] (open access)

[Memorandum of Meeting: Naval Air Depot North Island, California, June 7, 2005]

Memorandum of Meeting with Naval Air Depot (NADEP) North Island staff to discuss financial data provided by NADEP North Island.
Date: June 7, 2005
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
[Memorandum of Meeting: Naval Air Depot North Island, California, June 7, 2005] (open access)

[Memorandum of Meeting: Naval Air Depot North Island, California, June 7, 2005]

Memorandum of Meeting with Naval Air Depot (NADEP) North Island staff to discuss financial data provided by NADEP North Island.
Date: June 7, 2005
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
[Memorandum of Meeting: Naval Air Depot North Island, California, June 6, 2005] (open access)

[Memorandum of Meeting: Naval Air Depot North Island, California, June 6, 2005]

Memorandum of Meeting with Naval Air Depot North Island staff regarding a briefing and tour of the Naval Air Depot.
Date: June 5, 2005
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
Mission Bay Harbor, California, Design for Wave and Surge Protection and Flood Control: Hydraulic Model Investigation (open access)

Mission Bay Harbor, California, Design for Wave and Surge Protection and Flood Control: Hydraulic Model Investigation

Partial abstract: A 1:100-scale (undistorted) hydraulic model, reproducing Mission Bay Harbor, approximately 3 miles of shoreline, and sufficient offshore area to permit generation of the required test waves, was used to investigate the arrangement and design of proposed structures for (a) improving hazardous entrance conditions, (b) reducing surge inside the harbor, and (c) eliminating potential flood hazards. The original proposal for harbor improvement consisted of a 2,200-ft-long offshore breakwater. The proposed structures for river flood control consisted of (a) a 1,200-ft-long weir in the middle jetty, (b) various south jetty extensions, and (c) diversion dikes on the middle jetty.
Date: June 1983
Creator: Curren, Charles R.
Object Type: Report
System: The UNT Digital Library