Resource Type
Serial/Series Title
9 Matching Results
Results open in a new window/tab.
Results:
1 - 9 of
9
Federal/State Regulatory Permitting Actions in Selected Nuclear Power Station Licensing Cases
Abstract: This report documents the Federal/State regulatory permitting actions in 12 case histories of nuclear power station licensing in nine different states. General observations regarding Federal/State siting roles in the siting process include: new regulations, with the exceptions of those imposed by NEPA, were not found to be the source of significant delay; interventions were the sources of significant delay in only two cases; in only two cases was a local agency a source of delay; no one factor was found to be a source of delay, rather several factors often combined to cause delay; it is still too early to assess the influence of State power plant siting laws on the licensing process; clarification of the word "delay" is needed; water related issues predominate in State permitting requirements associated with delay; generalizations on the sources and nature of delay in the licensing process are difficult to make because of site specific characteristics; and frequently problems outside the Federal/State realm have had, or can have, a delaying effect on the process. Eleven of the case histories are illustrated with a logic network that gives the actions of the utilities in addition to the Federal/State permits.
Date:
June 1977
Creator:
U.S. Nuclear Regulatory Commission. Office of State Programs.
System:
The UNT Digital Library
Fuel Rod Material Behavior During Test PCM-1
This report presents the analysis of the fuel rod materials behavior based on the postirradiation examination of the Test PCM-1 fuel rod from the Power-Cooling-Mismatch Test Series.
Date:
June 1979
Creator:
Cook, Beverly A.
System:
The UNT Digital Library
Appendix G. U0β Oxidation Calculation
Appendix to report presenting detailed data from the postirradiation examination and pretest characterization for Test PCM-1, including the U0β oxidation calculation.
Date:
June 1979
Creator:
Cook, Beverly A.
System:
The UNT Digital Library
Appendix F. Cladding Thermal Conductivity Changes
Appendix to report presenting detailed data from the postirradiation examination and pretest characterization for Test PCM-1, including changes in cladding thermal conductivity with oxidation to ZrOβ.
Date:
June 1979
Creator:
Cook, Beverly A.
System:
The UNT Digital Library
Appendix C. Metallographic Examination
Appendix to report presenting detailed data from the postirradiation examination and pretest characterization for Test PCM-1, including additional metallography illustrating the physical and chemical changes in the cladding and fuel.
Date:
June 1979
Creator:
Cook, Beverly A.
System:
The UNT Digital Library
Appendix D. Particle Size Analysis
Appendix to report presenting detailed data from the postirradiation examination and pretest characterization for Test PCM-1, including tabulated data from the particle size analysis of the broke fuel rod pieces.
Date:
June 1979
Creator:
Cook, Beverly A.
System:
The UNT Digital Library
Appendix B. Test Rod Power Profile
Appendix to report presenting detailed data from the postirradiation examination and pretest characterization for Test PCM-1, including a description of the axial power profile.
Date:
June 1979
Creator:
Cook, Beverly A.
System:
The UNT Digital Library
Appendix A. Pretest Fuel Rod and Shroud Characteristics and Instrumentation
Report presenting the pretest physical characteristics and instrumentation of the Test PCM-1 (Power-Cooling Mismatch Test Series) fuel rod and shroud components.
Date:
June 1979
Creator:
Cook, Beverly A.
System:
The UNT Digital Library
Appendix E. Microprobe Examination
Appendix to report presenting detailed data from the postirradiation examination and pretest characterization for Test PCM-1, including details of the microprobe examination.
Date:
June 1979
Creator:
Cook, Beverly A.
System:
The UNT Digital Library