EGCR Lattice Radial and Angular Power Distribution 2.6 w/o Enrichment (open access)

EGCR Lattice Radial and Angular Power Distribution 2.6 w/o Enrichment

The measurements reported here are companion measurements to those reported earlier in HW-63585. The only significant difference between the measurements is that 1.8 w/o enrichment UO2 fuel was used for the first set, and 2.6 w/o enrichment UO2 fuel was used for the measurements described in this report. The new results will be presented graphically, and for completeness, the details of the measurement will be included here as well as in HW-63585.
Date: May 10, 1960
Creator: Nichols, P. F.
System: The UNT Digital Library
Quarterly Report- January, February, March 1959 Plutonium Fuels Development Plutonium Metallurgy Operation (open access)

Quarterly Report- January, February, March 1959 Plutonium Fuels Development Plutonium Metallurgy Operation

Four capsules containing Al-1.65 w/o Pu and Al-12 w/o Si-1.65 w/o Pu were charged into the MTR. These capsules will be irradiated to a burnup of 80-100% of the plutonium atoms to determine the stability of the material at high exposures. An additional sixteen capsules containing 5 to 20 w/o Pu in Al and Al-Si have been prepared. Eight are awaiting reactor space and should be charged soon. The remaining eight are being recanned to increase the end gap between the core and the can. Also four capsules containing high density UO2-PuO2 pellets canned in Zircaloy are awaiting assignment of reactor space.
Date: May 10, 1960
Creator: Wick, O. J.; Thomas, I. D.; Stewart, R. W.; Stewart, R. W. & Nelson, T. C.
System: The UNT Digital Library
Unclassified Research and Development Programs Executed for the Division of Reactor Development and the Division of Research April 1960 (open access)

Unclassified Research and Development Programs Executed for the Division of Reactor Development and the Division of Research April 1960

A 19-rod Zircaloy-clad half-length PRTR spike element successfully irradiated to high plutonium burnout at full power in the ETR shoved partial bonding of the core and cladding. Unsatisfactory autoclave films on the Zircaloy cladding of the PRTR Al-Pu fuel elements are delaying final assembly of the first 30 clusters. Further conditioning of the autoclaves and the availability of permanent etching facilities are expected to correct the present difficulties.
Date: May 10, 1960
Creator: Hanford Laboratories Operation Irradiation Procesing Department
System: The UNT Digital Library