Critical mass control: Continuous neptunium (open access)

Critical mass control: Continuous neptunium

During April 1962, equipment in both the main Redox Building (202-S) and the Plutonium Concentration Building (233-S) vas rearranged to allow the accumulation and recovery of neptunium without interference with the production of uranium and plutonium. In order to do this, the former rework column (1S) was put into continuous service as a neptunium recovery column, the Third Plutonium Cycle was converted to a neptunium decontamination cycle, and ion-exchange equipment was installed in the 233-S Building to replace the Third Plutonium Cycle. The neptunium, once decontaminated, will be concentrated and loaded out via its own system in the 233-S Building. To check the critical mass safety of the new arrangement, a formal hazards review was made, the results of which are reported in this document.
Date: May 9, 1962
Creator: Barnes, R. G.
System: The UNT Digital Library
Design of Reflectometers for Coaxial Lines Used at AGS LINAC (open access)

Design of Reflectometers for Coaxial Lines Used at AGS LINAC

This report describes the design procedure for a reflectometer or directional coupler to replace the probe part of the D07-1020 assembly used at the Brookhaven Alternating Gradient Synchrotron linac. Mathematical treatment and diagrams of various reflectometers are included.
Date: May 9, 1962
Creator: Walters, J. L.
System: The UNT Digital Library
Some Properties of Stub Tuners Which Can Be Displayed On Smith Charts (open access)

Some Properties of Stub Tuners Which Can Be Displayed On Smith Charts

Use of the Smith chart in studying stub tuners is demonstrated. Several properties of the tuners are shown, and charts for various wave length spacings, tuning trajectories, and admittances are included.
Date: May 9, 1962
Creator: Walters, J. L.
System: The UNT Digital Library