Collection
Serial/Series Title
2 Matching Results
Results open in a new window/tab.
Results:
1 - 2 of
2
HAPO Plant and capital equipment budget for FY 1966 and revision of budget for FY 1965 equipment not related to construction projects
This document is divided into: byproduct horizontal control rod system (5 reactors); high-speed scanning-effluent temperature monitoring system (KE reactor); improved reactor gas system (100-KE & KW); safety circuit system modifications (5 reactors); alternate process hot die sizing, 313 Building 300 Area; button line equipment (234-5 Building); in-tank waste solidification (3rd unit); and misc. minor equipment projects.
Date:
May 12, 1964
Creator:
McDonald, J. E.
System:
The UNT Digital Library
Piqua Nuclear Power Facility Operations Analysis Program Progress Report Number 9: 1966
The following progress report describes the examination of elements removed in comparison to a previous study on the power facility reactor operations.
Date:
May 1969
Creator:
North American Aviation. Atomics International Division.
System:
The UNT Digital Library