Interim Report of Nuclear Analysis Performed on SM-2 Core and Vessel : September 1, 1958 to December 31, 1959. (open access)

Interim Report of Nuclear Analysis Performed on SM-2 Core and Vessel : September 1, 1958 to December 31, 1959.

Abstract: This technical report contains a description of the nuclear analysis performed upon the SM-2 core and vessel for the period September 1, 1958 to December 31, 1959. Calculations are given for core reactivity, power distributions, lifetime, reactor control, kinetics, radiation problems, fuel and poison burn-ups, and the nuclear effects of poisons, temperature, and geometry. Wherever possible, experimental data is included in order to test the validity of the analytical models. The SM-2 nuclear analysis was performed by Alco Products, in. under Tasks 1, 8, and 10 of Contract No. AT(30-2)-326 for the Atomic Energy Commission.
Date: May 27, 1960
Creator: Bobe, P. E.; Birken, S. H.; Byrne, B. J.; Clancy, E. F. & Fried, B. E.
System: The UNT Digital Library
Army PWR Support and Development Program Six Months Summary Report : October 1, 1961 - March 31, 1962 (open access)

Army PWR Support and Development Program Six Months Summary Report : October 1, 1961 - March 31, 1962

Abstract: Progress is reported on research and development tasks under the Program Plan for Engineering Support and Development of Army Pressurized Water Reactor Power Plants, Contract AT(30-1)-2639, during the six months' period October 1, 1061 to March 31, 1962.
Date: May 25, 1962
Creator: Dixon, M. H.
System: The UNT Digital Library