Equipment Checkout Prior to Are Processing, Volatility Pilot Plant Run B-1 (open access)

Equipment Checkout Prior to Are Processing, Volatility Pilot Plant Run B-1

The head-end system for the ARE salt was tested with barren salt and shown to be operable. Transfer of the final batch of salt by gravity flow from the bold tank was shown to be feasible with a redesigned feed salt freeze valve. The CRP trap was also redesigned but the remote dumping mechanism did not function properly. (auth)
Date: May 29, 1958
Creator: Whitmarsh, C. L.
System: The UNT Digital Library
Li⁶ and Li⁷ (n. 2n) Cross Sections at 14.1 Mev (open access)

Li⁶ and Li⁷ (n. 2n) Cross Sections at 14.1 Mev

Abstract: "An absolute measurement of the 14.1-Mev (n, 2n) cross sections of Li-6 and Li-7 has been made using the large scintillator technique, resulting in cross sections in barns of 0.070 +/- 0.006 and 0.056 +/- 0.005 for Li-6 and Li-7, respectively."
Date: May 29, 1958
Creator: Ashby, V. J.; Catron, H. C.; Newkirk, Lester L.; Taylor, C. J. & Williamson, M. A.
System: The UNT Digital Library
PHYSICS DIVISION SEMIANNUAL REPORT FOR NOVEMBER 1957 THROUGH APRIL 1958 (open access)

PHYSICS DIVISION SEMIANNUAL REPORT FOR NOVEMBER 1957 THROUGH APRIL 1958

None
Date: May 29, 1958
Creator: unknown
System: The UNT Digital Library