Army Gas-Cooled Reactor Systems Program Monthly Progress Report: April 1959 (open access)

Army Gas-Cooled Reactor Systems Program Monthly Progress Report: April 1959

Abstract: This monthly progress report covers the activities of the Army Gas-Cooled Reactor System Program for April 1959. The program includes a water-moderated heterogeneous reactor (Gas-Cooled Reactor Experiment I), a graphite-moderated homogeneous reactor (Gas-Cooled Reactor Experiment II), a mobile gas-cooled reactor (ML-1), and the coordination of the Gas Turbine Test Facility. [It reports] the progress of each project, the associated tests and data evaluation, the applicable design criteria, and the fabrication of reactor components" (p. 1).
Date: May 25, 1959
Creator: Aerojet-General Corporation
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program. Monthly Progress Report for April 1959 (open access)

Army Gas-Cooled Reactor Systems Program. Monthly Progress Report for April 1959

The Army Gas Cooled Reactor System Program includes water moderated heterogeneous reactor (Gas Cooled Reactor Experiment I), a graphite moderated homogeneous reactor (Gas Cooled Reactor Experiment II), a mobile gas cooled reactor (ML-1), and the co ordination of thc Gas Turbine Test Facility. The progress of each project, the associated tests and data evaluation, the applicabie design criteria, and the fabrication of reactor components are briefly summarized. (For preceding period see IDO-28538.) (W.D.M.)
Date: May 25, 1959
Creator: unknown
System: The UNT Digital Library
Artificial cooling of the Columbia River by dam regulation: Part 1 (open access)

Artificial cooling of the Columbia River by dam regulation: Part 1

In early July 1958, it appeared that Columbia River temperatures at HAPO would be near 24--50{degree}C by the end of August. River temperatures were averaging 40 to 50{degree}C above 1957 figures and were 3{degree} to 4{degree} above the ten year highs. It seemed desirable to examine the problem to determine if any corrective measure could be taken, since it was apparent that production losses were imminent. The large storage of cold water behind Grand Coulee Dam, normally untapped, was a source of possible relief. A plan for use was proposed for the peak high temperature period and agreed to by the Bureau of Reclamation.
Date: May 25, 1959
Creator: Kramer, H. A.
System: The UNT Digital Library
Artificial Cooling of the Columbia River By Dam Regulation Part 1 (open access)

Artificial Cooling of the Columbia River By Dam Regulation Part 1

In early July, 1958, it appeared that Columbia River temperature at HAPO would be near 24.5ºC by the end of August. River temperature were averaging 4º to 5º above 1957 figures and were 3º to 4º above the ten year highs. It seemed desirable to examine the problem to determine if any corrective measure could be taken, since it was apparent that production losses were imminent.
Date: May 25, 1959
Creator: Kramer, H. A.
System: The UNT Digital Library
Artificial cooling of the Columbia River by dam regulation. Part 3 (open access)

Artificial cooling of the Columbia River by dam regulation. Part 3

The temperatures of the Columbia River was reduced 1 to 30 Centigrade with beneficial effects at HAPO. It is reasonable to expect that future benefits may be possible. It is desirable that the temperature of the river be controlled each year to the maximum extent possible. Instrumentation improvements requested to effect optimum savings. Records of river temperatures and flows should continue to be maintained by IPD as a necessary part of temperature optimization. Where possible, the coincident use of the river cooling technique should be made for the benefit of anadromous fish.
Date: May 25, 1959
Creator: Kramer, H. A.
System: The UNT Digital Library
Brief Review of Heat Transfer Problems Encountered in the Production of Magnetic Fields (open access)

Brief Review of Heat Transfer Problems Encountered in the Production of Magnetic Fields

The design of internally cooled electrical coils for the production of high intensity magnetic fields presents many new aspects and combinations of the familiar modes of heat transfer. However, the customary methodology appears to be sufficient for preliminary analysis and understanding of those problems. This methodology comprises the derivation of a qualitative, approximate equation expressing the relative performance of the various parts of a system, followed by an examination of this equation in order to locate the limiting features of the system. These features are then investigated by more powerful methods, which in turn provide guidance for development research in the laboratory. (auth)
Date: May 25, 1959
Creator: Alexander, L G
System: The UNT Digital Library
Brief Review of Heat Transfer Problems Encountered in the Production of Magnetic Fields (open access)

Brief Review of Heat Transfer Problems Encountered in the Production of Magnetic Fields

The design of internally cooled electrical coils for the production of high frequency intensity magnetic fields presents many new aspects and combinations of the familiar modes of heat transfer. However, the customary methodology appears to be sufficient for preliminary analysis and understanding of those problems. This methodology comprises the derivation of a qualitative, approximate equation expressing the relative performance of the various parts of a system, followed by an examination of this equation in order to locate the limiting features of the system. These features are then investigated by more powerful methods, which in turn provide guidance for development research in the laboratory.
Date: May 25, 1959
Creator: Alexander, L. G.
System: The UNT Digital Library
Design Criteria for a Pile Oscillator (open access)

Design Criteria for a Pile Oscillator

An elementary discussion is given of the reactor parameters which determine the signal-to-noise ratio obtainable with a pile oscillator. (auth)
Date: May 25, 1959
Creator: Dresner, L.
System: The UNT Digital Library
Design Criteria for a Pile Oscillator (open access)

Design Criteria for a Pile Oscillator

In the use of a reactor as a device to measure neutron cross sections, the pile oscillator is often employed because of its much higher sensitivity compared to that available in static reactivity measurements. The factor limiting the available in static reactivity measurements. The factor limiting the available sensitivity is the generation of random noise, which originates in the statistical nature of the chain reaction. In other words, the nuclear reactions which maintain the chain reaction do not proceed uniformly, but rather at rates which fluctuate in time around some average values. These fluctuations limit the accuracy of measurements in the reactor.
Date: May 25, 1959
Creator: Dresner, Lawrence
System: The UNT Digital Library
Fuels Preparation Department monthly report for April, 1959 (open access)

Fuels Preparation Department monthly report for April, 1959

This document details activities of the Fuels Preparation Department during the month of April 1959. (FI)
Date: May 25, 1959
Creator: unknown
System: The UNT Digital Library
Hastelloy F Dissolver Installation in 321 Building (open access)

Hastelloy F Dissolver Installation in 321 Building

Hastelloy F is a prime contender as a material of construction for plant dissolvers in the power fuel reprocessing program. Consequently, the fabrication and installation of dissolver was undertaken to delineate any unknown problems associated with the use of Hastelloy F; and, at the same time, to provide a vessel for development studies on the Niflex or the Sulfex processes. The purpose of this report is to describe the actual basis for design as well as to present the problems encountered during the fabrication of the vessels.
Date: May 25, 1959
Creator: Cooley, C. R.
System: The UNT Digital Library
Measurement of the Nuclear Materials Content of Non-Production Fuels (open access)

Measurement of the Nuclear Materials Content of Non-Production Fuels

In considering the problems associated with the measurement of SSNM content of Non-Production Fuels, two distinct problems are apparent. The first is the technical problem of obtaining highly accurate measurements in a complicated chemical and physical system. The second is the administrative problem of choosing a measurement system which provides a basic of financial settlement acceptable to both the seller (reactor operator) and the buyer (Commission).
Date: May 25, 1959
Creator: Schneider, R. A.
System: The UNT Digital Library
Radial Thermal Flux Traverses in Natural Uranium - Graphite Lattices (open access)

Radial Thermal Flux Traverses in Natural Uranium - Graphite Lattices

The spatial distribution of thermal neutrons in a reactor lattices cell is of fundamental importance for many reasons. First of all, this information allows the determination of the relative absorption rates in each component of the cell which in turn enables a determination of the thermal utilization, and the diffusion length of the lattice. In addition, the observed spatial distributions of thermal neutrons in the lattice cell is of major interest in testing various approximations to the solution of the transport equation such as the P1 and P3 solutions.
Date: May 25, 1959
Creator: Nilson, R. & Oakes, T. J.
System: The UNT Digital Library
Scram transient tests PT-IP-249-C (open access)

Scram transient tests PT-IP-249-C

The purpose of this production test is to provide a standard method of obtaining scram transient reactivity information at the eight reactors, under conditions conducive to valid data. These conditions include the bypassing of the Panellit system at a low power level for a short, controlled period of time during May 1959.
Date: May 25, 1959
Creator: Bowers, C.E.
System: The UNT Digital Library