Resource Type

INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT (open access)

INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT

INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT, MIAMISBURG, OHIO DCN: 0468-SR-02-0
Date: May 24, 2010
Creator: Adams, W. C.
System: The UNT Digital Library
Trade and the Americas (open access)

Trade and the Americas

None
Date: May 24, 2002
Creator: Ahearn, Raymond J.
System: The UNT Digital Library
Laboratory Directed Research and Development FY 2000 Annual Report (open access)

Laboratory Directed Research and Development FY 2000 Annual Report

This Annual Report provides an overview of the FY2000 Laboratory Directed Research and Development (LDRD) Program at Lawrence Livermore National Laboratory (LLNL) and presents a summary of the results achieved by each project during the year.
Date: May 24, 2001
Creator: Al-Ayat, R
System: The UNT Digital Library
THORIUM BREEDER REACTOR EVALUATION. PART 1. FUEL YIELD AND FUEL CYCLE COSTS IN FIVE THERMAL BREEDERS (open access)

THORIUM BREEDER REACTOR EVALUATION. PART 1. FUEL YIELD AND FUEL CYCLE COSTS IN FIVE THERMAL BREEDERS

The performances of aqueous-homogeneous (AHBR), molten-salt (MSBR), liquid-bismuth (LBBR), gas-cooled graphite-moderated (GGBR), and deuterium- moderated gas-cooled (DGBR) breeder reactors were evaluated in respect to fuel yield, fuel cycle costs, and development status. A net electrical plant capability of 1000 Mwe was selected, and the fuel and fertile streams were processed continuously on-site. The maximum annual fuel yields were 1.5 mills/ kwhr. The minimum estimated fuel cycle costs were 0.9, 0.6, 1.0, 1.2, and 1.3 mills/kwhr at fuel yields of were 0.9, 0.9, 1.5, 1.5, and 1.3 mills/kwhr. Only the AHBR and the MSBR are capable of achieving fuel yields substantially in excess of 4%/yr, and therefore, in view of the uncertainties in nuclear data and efficiencies of processing methods, only these two can be listed with confidence as being able to satisfy the main criterion of the AEC longrange thorium breeder program, viz. a doubling time of 25 years or less. The development effort required to bring the various concepts to the stage where a prototype station could be designed was estimated to be least for the AHBR, somewhat more for the MSBR, and several times as much for the other systems. The AHBR was judged to rank first in …
Date: May 24, 1961
Creator: Alexander, L. G.; Carter, W. L.; Chapman, R. H.; Kinyon, B. W.; Miller, J. W. & Van Winkle, R.
System: The UNT Digital Library
Thorium Breeder Reactor Evaluation. Part I. Fuel Yield and Fuel Cycle Costs in Five Thermal Breeders (open access)

Thorium Breeder Reactor Evaluation. Part I. Fuel Yield and Fuel Cycle Costs in Five Thermal Breeders

The performances of aqueous-homogeneous (AHBR), molten-salt (MSBR), liquid-bismuth (LBBR), gas cooled graphite-moderated (GGBR), and deuterium-moderated gas-cooled (DGBR) breeder reactors were evaluated in respect to fuel yield, fuel cycle costs, and development status. A net electrical plant capability of 1000 Mwe was selected, and the fuel and fertile streams were processed continuously on-site.
Date: May 24, 1961
Creator: Alexander, L. G.; Carter, W. L.; Chapman, R. H.; Kinyon, B. W.; Miller, J. W. & Van Winkle, R.
System: The UNT Digital Library
THORIUM BREEDER REACTOR EVALUATION. PART I. FUEL YIELD AND FUEL CYCLE COSTS IN FIVE THERMAL BREEDERS. APPENDICES (open access)

THORIUM BREEDER REACTOR EVALUATION. PART I. FUEL YIELD AND FUEL CYCLE COSTS IN FIVE THERMAL BREEDERS. APPENDICES

The performances of aqueous-homogeneous (AHBR), molten-salt (MSBR), liquid-bismuth (LBBR), gas-cooled graphite-moderated (GCBR), and deuterium- moderated gascooled (DGBR) breeder reactors were evaluated in respect to fuel yield, fuel cycle costs, and development status. A net electrical plant capability of 1000 Mwe was selected with continuous processing of fuel and fertile streams. The maximum annual fuel yields were 16, 7, 4, 4, and 4.5%/yr, respectively at a fuel cycle cost of 1.5 mills/kwhr. The minimum estimated fuel cycle costs were 0.9, 0.6, 1.0, 1.2, and 1.3 mills/kwhr at fuel yields of 7, 1, 1, 2, and 3%/yr. At a fuel yield of 4%/yr, the costs were 0.9, 0.9, 1.5, 1.5, and 1.3 mills/kwhr. Only the AHBR and the MSBR are capable of achieving fuel yields substantially in excess of 4%/yr, and therefore only these two can be listed with confidence as being able to satisfy the mdin criterion of the AEC long-range thorium breeder program i.e., a doubling time of 25 years or less. The development effort required to bring the various concepts to the stage where a prototype station could be designed was estimated to be least for the AHBR, somewhat more for the MSBR, and several times as much for …
Date: May 24, 1961
Creator: Alexander, L. G.; Carter, W. L.; Chapman, R. H.; Kinyon, B. W.; Miller, J. W. & Van Winkle, R.
System: The UNT Digital Library
Thorium Breeder Reactor Evaluation. Part I. Fuel Yield and Fuel Cycle Costs in Five Thermal Breeders. Appendices (open access)

Thorium Breeder Reactor Evaluation. Part I. Fuel Yield and Fuel Cycle Costs in Five Thermal Breeders. Appendices

The performances of aqueous-homogeneous (AHBR), molten-salt (MSBR), liquid-bismuth (LBBR), gas-cooled graphite-moderated (GCBR), and deuterium-moderated gas-cooled (DGBR) breeder reactors were evaluated in respect to fuel yield, fuel cycle costs, and development status. A net electrical plant capability of 1000 Mwe was selected, and the fuel and fertile streams were processed continuously on-site.
Date: May 24, 1961
Creator: Alexander, L. G.; Carter, W. L.; Chapman, R. H.; Kinyon, B. W.; Miller, J. W. & Van Winkle, R.
System: The UNT Digital Library
Magnesis specifications and estimated quantity of magnesia in the 234-5 Building Crucible Shop (open access)

Magnesis specifications and estimated quantity of magnesia in the 234-5 Building Crucible Shop

None
Date: May 24, 1951
Creator: Anicetti, R. J.
System: The UNT Digital Library
Thorex Thorium Nitrate Product Specifications (open access)

Thorex Thorium Nitrate Product Specifications

Activity and ionic impurity specifications are presented for Thorex thorium nitrate products. Two sets of specifications are given, one set for direct handling during refabrication of production reactor thorium metal slugs and the second for refabrication of future power reactor thorium metal elements by semi-remote technics. Consideration was given to the health hazard problems associated with each process step between the Thorex process and final refabricated source material in order to arrive at these specifications.
Date: May 24, 1956
Creator: Arnold, E. D. & Wischow, R. P.
System: The UNT Digital Library
Opportunities for Drell-Yan Physics at RHIC (open access)

Opportunities for Drell-Yan Physics at RHIC

Drell-Yan (DY) physics gives the unique opportunity to study the parton structure of nucleons in an experimentally and theoretically clean way. With the availability of polarized proton-proton collisions and asymmetric d+Au collisions at the Relativistic Heavy Ion Collider (RHIC), we have the basic (and unique in the world) tools to address several fundamental questions in QCD, including the expected gluon saturation at low partonic momenta and the universality of transverse momentum dependent parton distribution functions. A Drell-Yan program at RHIC is tied closely to the core physics questions of a possible future electron-ion collider, eRHIC. The more than 80 participants of this workshop focused on recent progress in these areas by both theory and experiment, trying to address imminent questions for the near and mid-term future.
Date: May 24, 2011
Creator: Aschenauer, E.; Bland, L.; Crawford, H.; Goto, Y.; Eyser, O.; Kang, Z. et al.
System: The UNT Digital Library
Dalitz Plot Analysis of the Decay B+ -> K+K+K- (open access)

Dalitz Plot Analysis of the Decay B+ -> K+K+K-

None
Date: May 24, 2006
Creator: Aubert, B.
System: The UNT Digital Library
Search for Doubly Charmed Baryons Xi_cc^+ and Xi_cc^++in BABAR (open access)

Search for Doubly Charmed Baryons Xi_cc^+ and Xi_cc^++in BABAR

None
Date: May 24, 2006
Creator: Aubert, B.
System: The UNT Digital Library
Search for B+ ->phi pi+ and B0->phi pi0 Decays (open access)

Search for B+ ->phi pi+ and B0->phi pi0 Decays

A search has been made for the decays B{sup +} {yields} {psi}{pi}{sup +} and B{sup 0} in a data sample of approximately 232 x 10{sup 6} B{bar B} pairs recorded at the {Upsilon}(4S) resonance with the BABAR detector at the PEP-II B-meson Factory at SLAC. No significant signals have been observed, and therefore upper limits have been set on the branching fractions: {Beta}(B{sup +} {yields} {psi}{pi}{sup +}) < 2.4 x 10{sup -7} and {Beta}(B{sup 0} {yields} {psi}{pi}{sup 0}) < 2.8 x 10{sup -7} at 90% probability.
Date: May 24, 2006
Creator: Aubert, B.; Barate, R.; Bona, M.; Boutigny, D.; Couderc, F.; Karyotakis, Y. et al.
System: The UNT Digital Library
Estimation of Particle Flux and Remineralization Rate from Radioactive Disequilibrium (open access)

Estimation of Particle Flux and Remineralization Rate from Radioactive Disequilibrium

Reactive radionuclides, such as the thorium isotopes, show measurable deficiencies in the oceanic water column because of their removal by chemical scavenging due to the particle flux. Measurement of the deficiency, coupled with measurement of the radionuclide concentration in particles, allows a determination of the effective particle sinking velocity. Results to date suggest that the effective particle sinking velocity is remarkably invariant with depth. This leads to the tentative suggestion that POC concentration profiles may, to a good approximation, be used directly to determine length scales for the remineralization of sinking organic matter. Further measurements are in progress to test this idea and to evaluate its limitations. Knowledge of the remineralization length scale is essential to an evaluation of the efficiency of the biological pump as a means for deep sequestering of carbon in the ocean.
Date: May 24, 2004
Creator: Bacon, Michael P. & Francois, Roger
System: The UNT Digital Library
A Comparison of the Effects of Radiant Thermal Energy on Bare, Blackened and Whitened Pig Skin (open access)

A Comparison of the Effects of Radiant Thermal Energy on Bare, Blackened and Whitened Pig Skin

None
Date: May 24, 1956
Creator: Bales, H. W.; Hinshaw, J. R. & Pearse, H. E.
System: The UNT Digital Library
DESIGN CRITERIA FOR HIGH TEMPERATURE LATTICE TEST REACTOR PROJECT CAH-100 (open access)

DESIGN CRITERIA FOR HIGH TEMPERATURE LATTICE TEST REACTOR PROJECT CAH-100

Design and construction specifications to be followed in the development of the reactor, its associated systems and experimental facilities, and the housing and required services for the facility are presented. The testing procedures to be used are outlined. (D.C.W.)
Date: May 24, 1963
Creator: Ballard, D. L.; Brown, W. W.; Harrison, C. W.; Heineman, R. E.; Henry, H. L.; Jeffs, T. W. et al.
System: The UNT Digital Library
Applications of advanced petroleum production technology and water alternating gas injection for enhanced oil recovery -- Mattoon Oil Field, Illinois. First quarterly technical progress report, 1993 (open access)

Applications of advanced petroleum production technology and water alternating gas injection for enhanced oil recovery -- Mattoon Oil Field, Illinois. First quarterly technical progress report, 1993

For work during the first quarter of 1993, American Oil Recovery, Inc. targeted completion of the following specific objectives: Convene meetings of Mattoon Project subcontractors in order to plan and coordinate Project activities. Confirm organizational arrangements and plans for implementation of Mattoon Project. Complete most work on detailed analysis of reservoir geology of productive leases in the Mattoon Project. Identify first Facies Defined Subunit for initial injectivity testing to be commenced near the beginning of the second quarter. Identify additional Facies Defined Subunits for injectivity testing and characterization during the second and third quarters. Award subcontract to the Illinois State Geological Survey and commence work on preparation of a geostatistical model (STRATAMODEL) of more than 100 wells on 1,000 acres within the Mattoon Project Area. Obtain oil samples from wells in the identified Facies Subunit for reservoir rock, fluid, and CO{sub 2} compatibility testing by the Illinois State Geological Survey. Design CO{sub 2} injection pumps and injection monitoring equipment configuration. Obtain bids for required pumps and diesel motor. Accomplishments for this quarter are reported.
Date: May 24, 1993
Creator: Baroni, M. R.
System: The UNT Digital Library
Preliminary Results of British Nene II Engine Altitude-Chamber Performance Investigation. I - Altitude Performance Using Standard 18.75-Inch-Diameter Jet Nozzle, 1, Altitude Performance Using Standard 18.75-Inch-Diameter Jet Nozzle (open access)

Preliminary Results of British Nene II Engine Altitude-Chamber Performance Investigation. I - Altitude Performance Using Standard 18.75-Inch-Diameter Jet Nozzle, 1, Altitude Performance Using Standard 18.75-Inch-Diameter Jet Nozzle

An investigation is being conducted to determine the altitude performance characteristics of the British Nene II engine and its components. The present paper presents the preliminary results obtained using a standard jet nozzle. The test results presented are for conditions simulating altitudes from sea level to 60,000 feet and ram pressure ratios from 1.0 to 2.3. These ram pressure ratios correspond to flight Mach numbers between zero and 1.16 assuming a 100 percent ram recovery.
Date: May 24, 1948
Creator: Barson, Zelmar & Wilsted, H. D.
System: The UNT Digital Library
Interim report on tests simulating the transient response of individual process tubes to inadvertent plugging (open access)

Interim report on tests simulating the transient response of individual process tubes to inadvertent plugging

Current Panellit protection procedures, termed instability limits, come from calculations based on steady state experiments. However, the actual conditions in a process tube following a plugging occurrence sufficient to cause unstable flow are transient rather than steady state, and cannot be determined with great precision except by transient state experimentation. As a result, a program was initiated by the thermal Hydraulics Operation of HLO to perform a series of transient heat transfer experiments which would define the process tube response to (1) rapid plugging in the process tube assembly, (2) slow plugging in the process tube assembly, and (3) power excursions above normal of varying amounts. Transient heat transfer experimentation on a large scale is not common and many difficulties have been encountered. After preliminary runs were made and reported, a further series of runs were planned and run which would include K as well as BDF type data and would define more closely the upper limit of the panellit protection. During the test runs, data from these transient experiments are recorded on high speed recording instruments, each of which has a calibration which is subject to change regardless of the efforts expended by the experimenters. This means that checking …
Date: May 24, 1957
Creator: Batch, J. M.; Hesson, G. M.; Thorne, W. L. & Toyoda, K. G.
System: The UNT Digital Library
Ground Source Integrated Heat Pump (GS-IHP) Development (open access)

Ground Source Integrated Heat Pump (GS-IHP) Development

Between October 2008 and May 2013 ORNL and ClimateMaster, Inc. (CM) engaged in a Cooperative Research and Development Agreement (CRADA) to develop a groundsource integrated heat pump (GS-IHP) system for the US residential market. A initial prototype was designed and fabricated, lab-tested, and modeled in TRNSYS (SOLAR Energy Laboratory, et al, 2010) to predict annual performance relative to 1) a baseline suite of equipment meeting minimum efficiency standards in effect in 2006 (combination of air-source heat pump (ASHP) and resistance water heater) and 2) a state-of-the-art (SOA) two-capacity ground-source heat pump with desuperheater water heater (WH) option (GSHPwDS). Predicted total annual energy savings, while providing space conditioning and water heating for a 2600 ft{sup 2} (242 m{sup 2}) house at 5 U.S. locations, ranged from 52 to 59%, averaging 55%, relative to the minimum efficiency suite. Predicted energy use for water heating was reduced 68 to 78% relative to resistance WH. Predicted total annual savings for the GSHPwDS relative to the same baseline averaged 22.6% with water heating energy use reduced by 10 to 30% from desuperheater contributions. The 1st generation (or alpha) prototype design for the GS-IHP was finalized in 2010 and field test samples were fabricated for testing …
Date: May 24, 2013
Creator: Baxter, V. D.; Rice, K.; Murphy, R.; Munk, J.; Ally, Moonis; Shen, Bo et al.
System: The UNT Digital Library
U.S. Disposal of Chemical Weapons in the Ocean: Background and Issues for Congress (open access)

U.S. Disposal of Chemical Weapons in the Ocean: Background and Issues for Congress

None
Date: May 24, 2006
Creator: Bearden, David M.
System: The UNT Digital Library
U.S. Disposal of Chemical Weapons in the Ocean: Background and Issues for Congress (open access)

U.S. Disposal of Chemical Weapons in the Ocean: Background and Issues for Congress

None
Date: May 24, 2006
Creator: Bearden, David M.
System: The UNT Digital Library
Federal Farm Promotion (“Check-Off”) Programs (open access)

Federal Farm Promotion (“Check-Off”) Programs

None
Date: May 24, 2005
Creator: Becker, Geoffrey S.
System: The UNT Digital Library
Federal Farm Promotion ("Check-Off") Programs (open access)

Federal Farm Promotion ("Check-Off") Programs

This report discusses the so-called beef check-off program, one of a number of generic promotion programs for beef and other agricultural products that Congress has authorized in recent decades. Supporters view check-offs as economically beneficial self-help activities that need minimal government involvement or taxpayer funding. Producers, handlers, and/or importers are required to pay an assessment, usually deducted from revenue at time of sale — thus the name check-off. However, some farmers contend they are being “taxed” for advertising and related activities they would not underwrite voluntarily.
Date: May 24, 2005
Creator: Becker, Geoffrey S.
System: The UNT Digital Library