Project C-187-D design requirements for redox production plants (open access)

Project C-187-D design requirements for redox production plants

The following outline of the requirements for the Redox Production Plant design is transmitted to the Kellex Corporation by the General Electric Company to be used in carrying out the assignment directed by Work Authority C-187-C. This outline briefly describes the critical features of design and emphasizes the General Electric desires for certain types of process and engineering design. The purpose of this transmittal is to outline the minimum requirements as to process flow sheet and design criteria to initiate the carrying out of this assignment by Kellex Corporation. This document was originally produced on May 22, 1948 and was declassified on July 28, 1994.
Date: May 22, 1948
Creator: Beaton, R. H.
System: The UNT Digital Library