Braze Alloys v.s. Atmospheres : Final Report Project 1325 (open access)

Braze Alloys v.s. Atmospheres : Final Report Project 1325

Summary. At the time this project was initiated, all brazing had been confined to small retorts of ten cubic feet capacity or less. Larger assemblies were scheduled which required retorts of over 100 cubic feet capacity. Hydrogen atmospheres had given the best results, however, there was considerable reluctance to use hydrogen in these large retorts from a safety standpoint. It was thought that thru the use of PMC 2252, an argon - 2 1/2% hydrogen gas atmosphere which in non-explosive, sufficient cleaning action might be attoined without the inherent hazards encountered with hydrogen. An investigation of the argon - 2 1/2% hydrogen gas as a brazing atomosphoer
Date: May 21, 1959
Creator: Rogers, S. L.
System: The UNT Digital Library
Chemical Processing Department monthly report, April 1959 (open access)

Chemical Processing Department monthly report, April 1959

Production of Pu from separations plants was only 58% of April commitment because of Purex difficulties. UO{sub 3} production, shipments met schedules. Pu shape production and shipments exceeded forecast by 14%. Purex HS column, repaired Oct 1958, developed another leak and was bypassed April 18, resulting in Pu and U that required reprocessing. A Palm recovery run at Purex with all- reducing flowsheet, resulted in 87% recovery and excellent decontamination of product. The prototype dual-pass silver reactor in Purex C-cell plugged with offgases. Processing of unclarified feed through Purex solvent extraction continued. Redox dissolver batch sizes for E-metal processing were increased from 1.75 to 2.0 tons. Testing of first extraction cycle acidic flowsheet at Redox continued, with Np losses to HAW being below detection limit. Ru in 1AFS stream increased 10-fold F.P. activity but was removed in acid deficient U cycles. A sulfamic acid process is being explored for dissolving Pu metal. Scope design of Redox dissolver and RMA line replacement at Z plant was completed. Shielding effectiveness of medium and high density x-ray lead glass was compared.
Date: May 21, 1959
Creator: unknown
System: The UNT Digital Library
Irradiation Processing Department Monthly Record Report: April 1959 (open access)

Irradiation Processing Department Monthly Record Report: April 1959

This document details activities of the irradiation processing department during the month of April, 1959. A general summary is included at the start of the report, after which the report is divided into the following sections: Research and engineering operations; production and reactor operations; facilities engineering operation; employee relations operation; and financial operation.
Date: May 21, 1959
Creator: unknown
System: The UNT Digital Library
Project LOTSWIFE meeting of May 18, 1959 (open access)

Project LOTSWIFE meeting of May 18, 1959

None
Date: May 21, 1959
Creator: Denton, V.
System: The UNT Digital Library
Reactivity--Lifetime Comparison of U{sup235} and 10,000 MWD/Ton Pu as Fuel for the APPR (open access)

Reactivity--Lifetime Comparison of U{sup235} and 10,000 MWD/Ton Pu as Fuel for the APPR

None
Date: May 21, 1959
Creator: Gross, E. E.
System: The UNT Digital Library