Solar heating and hot water system installed at Cherry Hill, New Jersey. [Hotels] (open access)

Solar heating and hot water system installed at Cherry Hill, New Jersey. [Hotels]

The solar heating and hot water system installed in existing buildings at the Cherry Hill Inn in Cherry Hill, New Jersey is described in detail. The system went into operation November 8, 1978 and is expected to furnish 31.5% of the overall heating load and 29.8% of the hot water load. The collectors are General Electric Company liquid evacuated tube type. The storage system is an above ground insulated steel water tank with a capacity of 7,500 gallons.
Date: May 16, 1979
Creator: unknown
System: The UNT Digital Library
Assessment of the state of the art of pressurized fluidized bed combustion systems (open access)

Assessment of the state of the art of pressurized fluidized bed combustion systems

This report was prepared at the request of the Tennessee Valley Authority (TVA) to clarify the development status of the pressurized fluidized bed combustor (PFBC) and to place in perspective the problems which are yet to be solved before commercialization of the concept is practical. The report is viewed as preliminary to a more complete and comprehensive work to be carried out during FY 1979. An evaluation of the PFBC concept cites potential advantages over atmospheric pressure fluidized bed combustors (AFBC) in the areas of combustion efficiency, sulfur retention, furnace design, power plant efficiency, and others. The key disadvantage of unproven hot gas cleanup and associated gas turbine technology is discussed in considerable detail. A survey of existing and developing PFBC experimental facilities is presented plus some results from the experimental programs. Recent design studies for full-sized PFBC power plants are reviewed with emphasis on key design parameters. Results for similar AFBC design studies are presented in contrast. The general conclusion drawn from this preliminary survey is that the potential advantages of the PRBC used in conjunction with a high-temperature (850/sup 0/C (1560/sup 0/F)) gas turbine will be difficult to realize due primarily to the formidable task of developing adequate …
Date: May 16, 1979
Creator: Fraas, A. P.; Graves, R. L. & Lackey, M. E.
System: The UNT Digital Library
Dynamic Isotope Power System: technology verification phase. Component test specification for the ground demonstration system alternator stator. 79-DIPS-41 (open access)

Dynamic Isotope Power System: technology verification phase. Component test specification for the ground demonstration system alternator stator. 79-DIPS-41

Test procedures are formulated to ensure that the alternator stator, P/N 719134, satisfies the requirements set forth within the KIPS Technology Verification Plan.
Date: May 16, 1979
Creator: unknown
System: The UNT Digital Library
Water Resources Development: Cost-Sharing Options for Federal Projects Issue Brief Number IB79055 (open access)

Water Resources Development: Cost-Sharing Options for Federal Projects Issue Brief Number IB79055

This report is about the cost-sharing options for federal projects for water resources development.
Date: May 16, 1979
Creator: Viessman, Warren Jr.
System: The UNT Digital Library