Molten salt processing of mixed wastes with offgas condensation (open access)

Molten salt processing of mixed wastes with offgas condensation

We are developing an advanced process for treatment of mixed wastes in molten salt media at temperatures of 700--1000{degrees}C. Waste destruction has been demonstrated in a single stage oxidation process, with destruction efficiencies above 99.9999% for many waste categories. The molten salt provides a heat transfer medium, prevents thermal surges, and functions as an in situ scrubber to transform the acid-gas forming components of the waste into neutral salts and immobilizes potentially fugitive materials by a combination of particle wetting, encapsulation and chemical dissolution and solvation. Because the offgas is collected and assayed before release, and wastes containing toxic and radioactive materials are treated while immobilized in a condensed phase, the process avoids the problems sometimes associated with incineration processes. We are studying a potentially improved modification of this process, which treats oxidizable wastes in two stages: pyrolysis followed by catalyzed molten salt oxidation of the pyrolysis gases at ca. 700{degrees}C. 15 refs., 5 figs., 1 tab.
Date: May 13, 1991
Creator: Cooper, J.F.; Brummond, W.; Celeste, J.; Farmer, J.; Hoenig, C.; Krikorian, O.H. et al.
Object Type: Article
System: The UNT Digital Library
[Wing 1 radiation survey and contamination report]. Final report (open access)

[Wing 1 radiation survey and contamination report]. Final report

We have completed the 5480.11 survey for Wing 1. All area(s)/item(s) requested by the 5480.11 committee have been thoroughly surveyed and documented. Decontamination/disposal of contaminated items has been accomplished. The wing 1 survey was started on 8/13/90 and completed 9/18/90. However, the follow-up surveys were not completed until 2/18/91. We received the final set of smear samples for wing 1 on 1/13/91. A total of 5,495 smears were taken from wing 1 and total of 465 smears were taken during the follow-up surveys. There were a total 122 items found to have fixed contamination and 4 items with smearable contamination in excess of the limits specified in DOE ORDER 5480.11 (AR 3-7). The following area(s)/item(s) were not included in the 5480.11 survey: Hallways, Access panels, Men`s and women`s change rooms, Janitor closets, Wall lockers and item(s) stored in wing 1 hallways and room 1116. If our contract is renewed, we will include those areas in our survey according to your request of April 15, 1991.
Date: May 13, 1991
Creator: Olsen, K.
Object Type: Report
System: The UNT Digital Library
EC Hydraulic Drive Cylinder Load Test (open access)

EC Hydraulic Drive Cylinder Load Test

This engineering note documents the testing of the EC hydraulic drive cylinder. The test was done to insure that the cylinder could operate at the desired compression. The purpose of the test was to determine the deflection of the cylinder rod at a pressure of 7000 psi. This note includes an explanation of the procedure used and a summary of the result of the testing done on May 1, 1991 by Gary Trotter. The purpose for load testing the cylinder was to insure that it could operate at the pressures required. These pressures were calculated in EN 254, with the appropriate safety factors included. Another engineering note to refer to is note 3740.510-EN-298, which explains the testing of the cylinder relief valve, and the effect of the difference in cross-sectional areas on the forces involved. The general result of this load test was that the cylinder could operate safely at the design pressures. Since the rod was tested in compression, calculations were required in order to determine the buckling force of the rod. The maximum cylinder test pressure was based on the allowable force on the rod for elastic buckling. This force was calculated using two methods, a simple Euler …
Date: May 13, 1991
Creator: Wu, J.
Object Type: Report
System: The UNT Digital Library
Stanford Geothermal Program [quarterly technical report, January--March 1991] (open access)

Stanford Geothermal Program [quarterly technical report, January--March 1991]

Progress was reported on adsorption work in experimental, theoretical and field projects. The reinjection task is now nearing completion of the work on optimizing injection into the Palinpinon geothermal field in the Philippines. Well test analysis research has been expanded with the initiation of a new project on multiwell interference test interpretation.
Date: May 13, 1991
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Stanford Geothermal Program (quarterly technical report, January--March 1991) (open access)

Stanford Geothermal Program (quarterly technical report, January--March 1991)

Progress was reported on adsorption work in experimental, theoretical and field projects. The reinjection task is now nearing completion of the work on optimizing injection into the Palinpinon geothermal field in the Philippines. Well test analysis research has been expanded with the initiation of a new project on multiwell interference test interpretation.
Date: May 13, 1991
Creator: unknown
Object Type: Report
System: The UNT Digital Library