Correlated Forward-Backward Coulomb Dissociation and Luminosity Monitoring at Heavy Ion Colliders (open access)

Correlated Forward-Backward Coulomb Dissociation and Luminosity Monitoring at Heavy Ion Colliders

We present an expression for the rate of correlated Coulomb dissociation of both colliding nuclei at a heavy-ion collider. For the case of Au + Au at RHIC, the cross section for mutual correlated dissociation is about 3 barns. This process should be cleanly measured with very forward (zero degree) calorimeters proposed for RHIC. We also discuss prospects for luminosity monitoring using this process.
Date: May 13, 1996
Creator: Baltz, A. J. & White, S. N.
System: The UNT Digital Library
Ferrous scrap preheating system: Phase 3, Final report (open access)

Ferrous scrap preheating system: Phase 3, Final report

Utilizing electric arc smelters for making steel has allowed many smaller manufacturers to compete with large integrated mills. The electric arc furnace melts scrap to produce steel. The subject of this report is a Scrap Preheater that heats and cleans the arc furnace scrap using its own low cost natural gas energy supply. Scrap preheating can increase the capacity of a given arc furnace and reduce the operating costs. In addition it reduces the air emissions and allows utilization of lower cost scrap. The program was divided into three phases and was to culminate with an operating prototype at a demonstration host site steel mill. A host site agreement was executed and critical components were tested. The prototype scrap preheater was completely designed. It was sized to preheat 30 tons of scrap in a scrap bucket in 30 minutes. Energy is supplied by a rich fume reactor that completely oxidizes organics from the scrap and auxiliary natural gas. There were several delays and changes in the project that resulted in the host site requesting to withdraw from the program. Extensive efforts were made to secure a replacement host site. However, when another host could not be found, the project was …
Date: May 13, 1996
Creator: unknown
System: The UNT Digital Library
Identification and summary characterization of materials potentially requiring vitrification: Background information (open access)

Identification and summary characterization of materials potentially requiring vitrification: Background information

This document contains background information for the Workshop in general and the presentation entitled `Identification and Summary Characterization of Materials Potentially Requiring Vitrification` that was given during the first morning of the workshop. summary characteristics of 9 categories of US materials having some potential to be vitrified are given. This is followed by a 1-2 page elaborations for each of these 9 categories. References to more detailed information are included.
Date: May 13, 1996
Creator: Croff, A. G.
System: The UNT Digital Library
Increased oil production and reserves from improved completion techniques in the Bluebell field, Uinta Basin, Utah. Tenth quarterly technical progress report, January 1, 1996--March 31, 1996. Revised (open access)

Increased oil production and reserves from improved completion techniques in the Bluebell field, Uinta Basin, Utah. Tenth quarterly technical progress report, January 1, 1996--March 31, 1996. Revised

The objective of this project is to increase oil production and reserves in the Uinta Basin by demonstrating improved completion techniques. Low productivity of Uinta Basin will is caused by gross production intervals of several thousand feet that contain perforated thief zones, water-bearing zones, and unperforated oil- bearing intervals. Geologic and engineering characterization and computer simulation of the Green River and Wasatch Formations in the Bluefell field will determine reservoir heterogeneities related to fractures and depositional trends. This will be followed by techniques based on the reservoir characterization. Transfer of the project results will be an ongoing component of the project. Data (net pay thickness, porosity, and water saturation) of more than 100 individuals beds in he lower Green River and Wasatch Formations were used to generate geostatistical realization (numerical- representation) of the reservoir properties. The data set was derived from the Michelle Ute and Malnar Pike demonstration wells and 22 other wells in a 20 (52 km{sup 2}) square-mile area. Beds were studied independently of each other. Principles of sequential Gaussian simulations were used to generate geostatistical realizations of the beds.
Date: May 13, 1996
Creator: Allison, M. L.
System: The UNT Digital Library
Micromachined chemical jet dispenser (open access)

Micromachined chemical jet dispenser

Goal is to develop a multi-channel micromachined chemical fluid jet dispenser that is applicable to prototype tests with biological samples that demonstrate its utility for molecular biology experiments. Objective is to demonstrate a new device capable of ultrasonically ejecting droplets from 10-200 {mu}m diameter capillaries that are arranged in an array that is linear or focused. The device is based on several common fabrication procedures used in MEMS (micro electro mechanical systems) technology: piezoelectric actuators, silicon, etc.
Date: May 13, 1996
Creator: Swierkowski, S. & Ciarlo, D.
System: The UNT Digital Library
WRAP Module 1 data management system (DMS) software design description (SDD) (open access)

WRAP Module 1 data management system (DMS) software design description (SDD)

Revision 2 of the Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS) Preliminary Software Design Description (PSDD) provides a high-level design description of the system. The WRAP 1 DMS is required to collect, store, and report data related to certification, tracking, packaging, repackaging, processing, and shipment of waste processed or stored at the WRAP 1 facility. The WRAP 1 DMS SDD is used as the primary medium for communication software design information. This release provides design descriptions for the following process modules produced under Phase 1 of the development effort: Receiving Drum or Box Containers Process Routing and Picklists; Waste Inventory by Location and/or Container Relationships; LLW Process Glovebox Facility Radiologic Material Inventory Check (partial); Shipping (partial production); Drum or Box NDE Operations; and Drum or Box NDA Operations Data Review (partial production). In addition, design descriptions are included for the following process modules scheduled for development under Phases 2 and 3: Activity Comment; LLW RWM Glovebox Sample Management; TRU Process Glovebox; TRU RWM Glovebox; and TRUPACT Processing. Detailed design descriptions for Reports and Facility Metrics have also been provided for in Revision 2 of this document.
Date: May 13, 1996
Creator: Weidert, J.R.