Applications of Micellar Enzymology to Clean Coal Technology. Tenth Quarterly Report (open access)

Applications of Micellar Enzymology to Clean Coal Technology. Tenth Quarterly Report

Full implementation of coal fuel sources will require more effective methods of providing ``clean coal`` as a fuel source. Methods must be developed to reduce the sulfur content of coal which significantly contributes to environmental pollution. This project is designed to develop methods for pre-combustion coal remediation by implementing recent advances in enzyme biochemistry. The novel approach of this study is incorporation of hydrophilic oxidative enzymes in reverse micelles in an organic solvent. Enzymes from commercial sources or microbial extracts are being investigated for their capacity to remove organic sulfur from coal by oxidation of the sulfur groups, splitting of C-S bonds and loss of sulfur as sulfuric acid. Dibenzothiophene (DBT) and ethylphenylsulfide (EPS) are serving as models of organic sulfur-containing components of coal in initial studies.
Date: April 29, 1992
Creator: Walsh, C. T.
System: The UNT Digital Library
Conflict in Moldova (Chronology) (open access)

Conflict in Moldova (Chronology)

This report is about Conflict in Moldova
Date: April 29, 1992
Creator: Verona, Sergiu
System: The UNT Digital Library
Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program (open access)

Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program

This report presents the findings of the Interagency Requirements Review of the Department of Energy (DOE) Environmental Restoration and Waste Management (ERWM) Program. The review was requested by Admiral Watkins to help determine the FY 1993 funding levels necessary to meet all legal requirements. The review was undertaken by analysts from the Office of Management and Budget (OMB) and Army Corps of Engineers, reporting to an Interagency Group (IAG) of senior Administration officials concerned with environmental cleanup issues. The purpose of the study was to determine the level of finding needed in FY 1993 for each ERWM Field Office to comply with all Federal, State, and local government legal requirements; all DOE Orders that establish standards for environment, safety and health (ES and H) management; and for prudent investments in other discretionary and management activities such as upgrading administrative buildings, information systems, etc. The study also reviewed the cost estimates supporting the ERWM proposed budget, including direct costs (labor, equipment) and indirect costs (administrative, landlord services, contractor overhead). The study did not analyze whether the Federal/State legal requirements and DOE Orders were necessary or whether the proposed clean-up remedies represent the most cost effective alternatives available.
Date: April 29, 1992
Creator: unknown
System: The UNT Digital Library
Life cycle cost analysis for replacement of fluorescent light fixtures containing polychlorinated biphenyls (open access)

Life cycle cost analysis for replacement of fluorescent light fixtures containing polychlorinated biphenyls

This report describes the remedial action to achieve compliance with 29 CFR 1910 Occupational Safety and Health Administration (OSHA) requirements of fluorescent light fixtures containing PCBs at K-25 site. This remedial action is called the Remediation Plan for Fluorescent Light Fixtures Containing PCBs at the K-25 Site (The Plan). The Plan specifically discusses (1) conditions of non-compliance, (2) alternative solutions, (3) recommended solution, (4) remediation plan costs, (5) corrective action, (6) disposal of PCB waste, (7) training, and (8) plan conclusions. The results from inspections by Energy Systems personnel in 2 buildings at K-25 site and statistical extension of this data to 91 selected buildings at the K-25 site indicates that there are approximately 28,000 fluorescent light fixtures containing 47,036 ballasts. Approximately 38,531 contain PCBs and 2,799 of the 38,531 ballasts are leaking PCBs. Review of reportable occurrences at K-25 for the 12 month period of September 1990 through August 1991 shows that Energy Systems personnel reported 69 ballasts leaking PCBs. Each leaking ballast is in non-compliance with 29 CFR 1910 - Table Z-1-A. The age of the K-25 facilities indicate a continued and potential increase in ballasts leaking PCBs. This report considers 4 alternative solutions for dealing with the …
Date: April 29, 1992
Creator: unknown
System: The UNT Digital Library
Quasi-electric neutron scattering studies of protein dynamics. Progress report, November 1, 1991--April 29, 1992 (open access)

Quasi-electric neutron scattering studies of protein dynamics. Progress report, November 1, 1991--April 29, 1992

None
Date: April 29, 1992
Creator: Rorschach, H. E.
System: The UNT Digital Library
Supplemental report on cost estimates' (open access)

Supplemental report on cost estimates'

The Office of Management and Budget (OMB) and the U.S. Army Corps of Engineers have completed an analysis of the Department of Energy's (DOE) Fiscal Year (FY) 1993 budget request for its Environmental Restoration and Waste Management (ERWM) program. The results were presented to an interagency review group (IAG) of senior-Administration officials for their consideration in the budget process. This analysis included evaluations of the underlying legal requirements and cost estimates on which the ERWM budget request was based. The major conclusions are contained in a separate report entitled, ''Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program.'' This Corps supplemental report provides greater detail on the cost analysis.
Date: April 29, 1992
Creator: unknown
System: The UNT Digital Library