The Low-NO{sub x} Cell{trademark} Burner operates on the principle of staged combustion. The lower burner of each two-nozzle cell is modified to accommodate all the fuel input previously handled by two nozzles. Secondary air, less than theoretically required for complete combustion, is introduced to the lower burner. The remainder of secondary air is directed to the upper port'' of each cell to complete the combustion process. B W/EPRI have thoroughly tested the LNCB{trademark} at two pilot scales (6 million Btu per hour and 100 million Btu per hour), and tested a single full-scale burner in a utility boiler. Combustion tests at two scales have confirmed NO{sub x} reduction with the low-NO{sub x} cell on the order of 50% relative to the standard cell burner at optimum operating conditions. The technology is now ready for full unit, full-scale demonstration.
Date: April 6, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Full-Scale Demonstration Low-NO{sub x} Cell{trademark} Burner retrofit. Quarterly report No. 5, October 1, 1991--December 31, 1991 (open access)

Full-Scale Demonstration Low-NO{sub x} Cell{trademark} Burner retrofit. Quarterly report No. 5, October 1, 1991--December 31, 1991

The Low-NO{sub x} Cell{trademark} Burner operates on the principle of staged combustion. The lower burner of each two-nozzle cell is modified to accommodate all the fuel input previously handled by two nozzles. Secondary air, less than theoretically required for complete combustion, is introduced to the lower burner. The remainder of secondary air is directed to the upper ``port`` of each cell to complete the combustion process. B&W/EPRI have thoroughly tested the LNCB{trademark} at two pilot scales (6 million Btu per hour and 100 million Btu per hour), and tested a single full-scale burner in a utility boiler. Combustion tests at two scales have confirmed NO{sub x} reduction with the low-NO{sub x} cell on the order of 50% relative to the standard cell burner at optimum operating conditions. The technology is now ready for full unit, full-scale demonstration.
Date: April 6, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Measured leak rates of the temporary seals in DWPF canistered waste forms after three years of on site storage (open access)

Measured leak rates of the temporary seals in DWPF canistered waste forms after three years of on site storage

In the summer of 1990 a study was carried out to determine the-internal pressure, relative humidity, and chemical composition of the gas within the free volume of four canistered waste forms produced at TNX in May of 1988. Three of these canistered waste forms were sealed only by temporary seals and subsequently stored in the TNX boneyard' with no protection. The fourth canister was sealed by upset resistance welding. All three canisters with temporary seals were decontaminated by aqueous frit blasting. It was important to remeasure the leak rates of these seals to ensure that leaktightness had not deteriorated during canister handling and storage prior to the time the experiment were performed. This paper details the results of two separate measurements of the leak rates of these seals.
Date: April 6, 1992
Creator: Harbour, J. R. & Miller, T. J.
Object Type: Report
System: The UNT Digital Library
Measured leak rates of the temporary seals in DWPF canistered waste forms after three years of on site storage (open access)

Measured leak rates of the temporary seals in DWPF canistered waste forms after three years of on site storage

In the summer of 1990 a study was carried out to determine the-internal pressure, relative humidity, and chemical composition of the gas within the free volume of four canistered waste forms produced at TNX in May of 1988. Three of these canistered waste forms were sealed only by temporary seals and subsequently stored in the TNX `boneyard` with no protection. The fourth canister was sealed by upset resistance welding. All three canisters with temporary seals were decontaminated by aqueous frit blasting. It was important to remeasure the leak rates of these seals to ensure that leaktightness had not deteriorated during canister handling and storage prior to the time the experiment were performed. This paper details the results of two separate measurements of the leak rates of these seals.
Date: April 6, 1992
Creator: Harbour, J. R. & Miller, T. J.
Object Type: Report
System: The UNT Digital Library
Simulation of U-5 prototype undulator effects on the beam dynamics (open access)

Simulation of U-5 prototype undulator effects on the beam dynamics

The APS prototype undulator U-5 has been installed at NSLS VUV ring. Its effects on the beam behaviour have been simulated with tracking codes TEAPOT and RACETRACK. The tune shift, the distortion of betatron function, the chromaticity, the transverse coupling, and some of the amplitude-dependent effects on the VUV ring have been compared and are presented in this paper.
Date: April 6, 1992
Creator: Qian, Y. L. & Turner, L. R.
Object Type: Article
System: The UNT Digital Library
Simulation of U-5 Prototype Undulator Effects on the Beam Dynamics (open access)

Simulation of U-5 Prototype Undulator Effects on the Beam Dynamics

The APS prototype undulator U-5 has been installed at NSLS VUV ring. Its effects on the beam behaviour have been simulated with tracking codes TEAPOT and RACETRACK. The tune shift, the distortion of betatron function, the chromaticity, the transverse coupling, and some of the amplitude-dependent effects on the VUV ring have been compared and are presented in this paper.
Date: April 6, 1992
Creator: Qian, Y. L. & Turner, L. R.
Object Type: Article
System: The UNT Digital Library