Energy related studies utilizing microcline thermochronology: Progress report, May 1, 1987-April 30, 1988 (open access)

Energy related studies utilizing microcline thermochronology: Progress report, May 1, 1987-April 30, 1988

Rock samples from the Salton Sea Geothermal Field (sandstone, tuff, granite) and from accretionary prism sediments along the convergent margins in southeast Alaska and southwest Japan have been dated by the /sup 40/Ar/sup 39/Ar method. Paleotemperatures have been calculated. (ACR
Date: April 30, 1988
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Preconstruction of the Honey Lake Hybrid Power Plant (open access)

Preconstruction of the Honey Lake Hybrid Power Plant

The work undertaken under this Contract is the prosecution of the preconstruction activities, including preliminary engineering design, well field development, completion of environmental review and prosecution of permits, and the economic and financial analysis of the facility. The proposed power plant is located in northeastern California in Lassen County, approximately 25 miles east of the town of Susanville. The power plant will use a combination of wood residue and geothermal fluids for power generation. The plant, when fully constructed, will generate a combined net output of approximately 33 megawatts which will be sold to Pacific Gas and Electric Company (PG E) under existing long-term power sales contracts. Transfer of electricity to the PG E grid will require construction of a 22-mile transmission line from the power plant to Susanville. 11 refs., 12 figs., 7 tabs.
Date: April 30, 1988
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Preconstruction of the Honey Lake Hybrid Power Plant: Final report (open access)

Preconstruction of the Honey Lake Hybrid Power Plant: Final report

The work undertaken under this Contract is the prosecution of the preconstruction activities, including preliminary engineering design, well field development, completion of environmental review and prosecution of permits, and the economic and financial analysis of the facility. The proposed power plant is located in northeastern California in Lassen County, approximately 25 miles east of the town of Susanville. The power plant will use a combination of wood residue and geothermal fluids for power generation. The plant, when fully constructed, will generate a combined net output of approximately 33 megawatts which will be sold to Pacific Gas and Electric Company (PGandE) under existing long-term power sales contracts. Transfer of electricity to the PGandE grid will require construction of a 22-mile transmission line from the power plant to Susanville. 11 refs., 12 figs., 4 tabs.
Date: April 30, 1988
Creator: unknown
Object Type: Report
System: The UNT Digital Library

[Thunderbirds Decal]

Round decal in the center of a square sheet, featuring an image of a USAF thunderbird jet, viewed from slightly below, in front of a feathered bird surrounded by a storm cloud with lightning. The bottom of the jet is decorated to look like a dark-colored bird and there are red, white, and blue stripes around the nose and wings. Red text curved around the top of the image says "A Legend Reborn" with "Thunderbirds" written in white script along the bottom.
Date: April 30, 1988
Creator: United States. Air Force.
Object Type: Image
System: The UNT Digital Library
Texas Preventable Disease News, Volume 48, Number 17, April 30, 1988 (open access)

Texas Preventable Disease News, Volume 48, Number 17, April 30, 1988

Newsletter of the Texas Bureau of Disease Control and Epidemiology discussing the news, activities, and events of the organization and other information related to health in Texas.
Date: April 30, 1988
Creator: Texas. Bureau of Disease Control and Epidemiology.
Object Type: Journal/Magazine/Newsletter
System: The Portal to Texas History