Homogeneous Reactor Project Quarterly Progress Report: November 1959-January 1960 (open access)

Homogeneous Reactor Project Quarterly Progress Report: November 1959-January 1960

From Summary: "The major objective of the run was the investigation of fuel stability. The reactor operated for long periods at the design power of 5 Mw with none of the usual indications of instability while the system pressure was kept at 1250 psig. Run 21 ended on January 22, so that the reason for an abrupt change in the mixing rate of fuel between the core and blanket could be investigated and a reactor steam-system valve could be repaired."
Date: April 29, 1960
Creator: Briggs, R. B.
System: The UNT Digital Library
Homogeneous Reactor Project Quarterly Progress Report: November 1958-January 1959 (open access)

Homogeneous Reactor Project Quarterly Progress Report: November 1958-January 1959

Report documenting the ongoing research and developments of the Oak Ridge National Laboratory's Homogeneous Reactor Project.
Date: April 16, 1959
Creator: Oak Ridge National Laboratory
System: The UNT Digital Library
Homogeneous Reactor Project Quarterly Progress Report: November 1956-January 1957 (open access)

Homogeneous Reactor Project Quarterly Progress Report: November 1956-January 1957

Report issued by the Oak Ridge National Laboratory discussing quarterly progress of the Homogeneous Reactor Project. Progress of operations, design, development, and analysis is presented. This report includes tables, illustrations, and photographs.
Date: April 22, 1957
Creator: Briggs, R. B.; Winters, C. E.; Beall, S. E.; Lane, J. A.; Bohlmann, E. G.; Bruce, F. R. et al.
System: The UNT Digital Library
Homogeneous Reactor Project Quarterly Progress Report: November 15, 1951 (open access)

Homogeneous Reactor Project Quarterly Progress Report: November 15, 1951

From summary: "Construction of the HRE facility was essentially complete on November 15, 1951 except for minor revisions and final testing. A program of engineering and nuclear tests of the system hasbeen drawn up, and the tests will be started early in the next quarter. The only major HRE items for which design is not complete are the samplers for the fuel, [gas], and reflector systems. These will be completed in time to be installed before critical experiments begin; meanwhile, temporary sampling devices have been installed for use during the testing program."
Date: April 1, 1952
Creator: Swartout, J. A.; Secoy, C. H.; Welton, T. A.; Winters, C. E. & Thompson, W. E.
System: The UNT Digital Library