Serial/Series Title

Month

Quarterly environmental radiological survey summary - first quarter 1997 100, 200, 300, and 600 areas (open access)

Quarterly environmental radiological survey summary - first quarter 1997 100, 200, 300, and 600 areas

This report provides a summary of the radiological surveys performed in support of near-facility environmental monitoring at the Hanford Site. The First Quarter 1997 survey results and the status of actions required are summarized below: (1) All of the routine environmental radiological surveys scheduled during January, February, and March 1997, were performed as planned. (2) One hundred four environmental radiological surveys were performed during the first quarter 1997, twenty-nine at the active waste sites and seventy-five at the inactive waste sites. Contamination above background levels was found at eight of the active waste sites and seven of the inactive waste sites. Contamination levels as high as >1,000,000 disintegrations per minute (dpm) were reported. Of these contaminated surveys twelve were in Underground Radioactive Material (URM) areas and three were in contamination areas. The contamination found within ten of the URM areas was immediately cleaned up and no further action was required. In the remaining five sites the areas were posted and will require decontamination. Radiological Problem Reports (RPR's) were issued and the sites were turned over to the landlord for further action if required. (3) During the first quarter of 1997, 5.6 hectares (13.8 acres) were stabilized and radiologically down posted …
Date: April 23, 1997
Creator: McKinney, S. M.
System: The UNT Digital Library
Tank 241-AP-103, grab sample 3AP-97-1 analytical results for the final report (open access)

Tank 241-AP-103, grab sample 3AP-97-1 analytical results for the final report

This document is the final analytical laboratory report for the tank 241-AP-103 grab sample. One grab sample was collected from Riser 1{at}90{sup o} on March 19, 1997. Analyses were performed to verify compliance status with corrosion control criteria in accordance with the Letter of Instruction for Tank 241-AP-103 Grab Sample Analyses (LOI) (Field, 1997), the Compatibility Grab Sampling and Analysis Plan (TSAP) (Sasakid, 1997) and the Data Quality Objectives for Tank Farms Waste Compatibility Program (DQO) (Fowler, 1995). The sample results for pH were less than 12 indicating that the tank contents were caustic deficient. A notification for low hydroxide (< 0.01 M) was made to East Tank Farms Operations based on the pH result.
Date: April 23, 1997
Creator: Esch, R.A.
System: The UNT Digital Library
Permitting plan for the high-level waste interim storage (open access)

Permitting plan for the high-level waste interim storage

This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist.
Date: April 23, 1997
Creator: Deffenbaugh, M.L.
System: The UNT Digital Library
FY 97 Hanford telecommunication and information system userprofile - milestone IRM-097-003 (open access)

FY 97 Hanford telecommunication and information system userprofile - milestone IRM-097-003

The purpose of this report is to provide the results of the first annual self-assessment to confirm readiness to replace the mixer pump (pump No.1) in Tank 241-SY-101, should the mixer pump fail or need to be replaced for some other reason.
Date: April 23, 1997
Creator: Witherspoon, T.T.
System: The UNT Digital Library
Report on ignitability testing of ''no-flow'' push bit (open access)

Report on ignitability testing of ''no-flow'' push bit

Testing was done to determine if an ignition occurs during a sixty foot drop of a Universal Sampler onto a push-mode bit in a flammable gas environment. Ten drops each of the sampler using both a push-mode and rotary mode insert onto a push-mode bit were completed. No ignition occurred during any of the drops.
Date: April 23, 1997
Creator: Witwer, K.S.
System: The UNT Digital Library
Basis document for PFP plutonium nitrate ion exchange process in Room 228A (open access)

Basis document for PFP plutonium nitrate ion exchange process in Room 228A

The PFP facility currently has approximately 4300 liters of plutonium nitrate solution in storage. This material will be calcined by the Vertical Denigration Calciner (VDC) located in room 230C. However, part of the material needs to be purified to remove constituents that will interfere with the calcination process. An Ion Exchange process using Reillex{trademark} HPQ anion exchange resin was tested by the Plutonium Process Support Laboratories (PPSL) (I). The Ion exchange process is to be installed in glovebox HC-7 in room 228A/234-5Z. The plutonium separated from the interfering constituents will be in a concentrated condition ready to be calcined by the VDC in room 230C. The oxide product of the VDC will be placed into the 2736-Z vaults for long term storage.
Date: April 23, 1997
Creator: Risenmay, H.R.
System: The UNT Digital Library
High SO2 Removal Efficiency Testing (open access)

High SO2 Removal Efficiency Testing

This document provides a discussion of the technical progress on DOE/PETC project number DE-AC22-92PC91338, "High Efficiency SO2 Removal Testing", for the time period 1 January through 31 March 1997. The project involves testing at six full-scale utility flue gas desulfurization (FGD) systems, to evaluate low capital cost upgrades that may allow these systems to achieve up to 98% SO2 removal efficiency. The upgrades being evaluated mostly involve using performance additives in the FGD systems. The "base" project involved testing at the Tampa Electric Company�s Big Bend Station. All five potential options to the base program have been exercised by DOE, involving testing at Hoosier Energy�s Merom Station (Option I), Southwestern Electric Power Company�s Pirkey Station (Option II), PSI Energy�s Gibson Station (Option III), Duquesne Light�s Elrama Station (Option IV), and New York State Electric and Gas Corporation�s (NYSEG) Kintigh Station (Option V). The originally planned testing has been completed for all six sites. However, additional testing is planned at the Big Bend Station. The remainder of this document is divided into four sections. Section 2, Project Summary, provides a brief overview of the status of technical efforts on this project. Section 3, Results, summarizes the outcome from technical efforts during …
Date: April 23, 1997
Creator: Blythe, Gary
System: The UNT Digital Library
Methodology for evaluating energy R&D. Final report (open access)

Methodology for evaluating energy R&D. Final report

Recent budgetary shortfalls and hightened concern over balancing the federal budget have placed increasing demand on federal agencies to document the cost effectiveness of the programs they manage. In fact, the 1993 Government Performance and Results Act (GPRA) requires that by 1997 each executive agency prepare a Strategic Plan that includes measurable performance goals. By the year 2000, the first round of Annual Reports will become due which describes actual program performance. Despite the growing emphasis on measuring performance of government programs, the technology policy literature offers little in terms of models that program managers can implement in order to assess the cost effectiveness of the programs they manage. While GPRA will pose a major challenge to all federal government agencies, that challenge is particularly difficult for research-oriented agencies such as the Department of Energy. Its basic research programs provide benefits that are difficult to quantify since their values are uncertain with respect to timing, but are usually reflected in the value assigned to applied programs. The difficulty with quantifying benefits of applied programs relates to the difficulties of obtaining complete information on industries that have used DOE`s supported technologies in their production processes and data on cost-savings relative to …
Date: April 23, 1997
Creator: Carter, C.
System: The UNT Digital Library