Vadose Zone Transport Field Study FY 2003 Test Plan (open access)

Vadose Zone Transport Field Study FY 2003 Test Plan

Conceptual models have been identified as one of the sources of uncertainty in the interpretation and prediction of contaminant migration through the vadose zone at Hanford. Current conceptual models are limited partly because they often do not account for the random heterogeneity that occurs under the extremes of very nonlinear flow behavior typical of the Hanford vadose zone. Over the last two years significant progress has been made in characterizing physical heterogeneity and in the development of techniques for incorporating this heterogeneity into predictive and inverse models for field-scale subsurface flow. One of the remaining pieces of the puzzle is the impact of heterogeneity on the distribution of reactive contaminants. Reactive transport occurs over a wide range of spatial and temporal scales. However, the manner in which the various subsurface physical and chemical processes interact to influence transport is not very well understood. Hydrogeologic characterization and model analysis, however, have traditionally focused on measurement of physical properties and predicting the effects of variability in these properties on flow and transport. As a result, the role of geochemical heterogeneity on solute transport has remained largely unexplored. This project will use a combination of geophysical and soil physics techniques to investigate the …
Date: April 15, 2003
Creator: Ward, Anderson L. & Gee, Glendon W.
System: The UNT Digital Library
Documentation for FY2003 BTS GPRA Metrics (open access)

Documentation for FY2003 BTS GPRA Metrics

PNNL estimated the FY2003 energy, environmental, and financial benefits (i.e., metrics) of the technologies and practices in the U.S. Department of Energy's (DOE's) Office of Building Technology, State and Community Programs (BTS). BTS uses the estimates of benefits as part of its annual budget request. This report includes an overview of the analytical approaches used to estimate energy savings for the FY2003 appropriated budget for BTS. The report also includes descriptions of key assumptions and the methodology that is used to calculate energy savings estimates for each BTS program.
Date: April 15, 2002
Creator: Hostick, Donna J.; Belzer, David B.; Cort, Katherine A.; Dirks, James A. & Pool, Rita H.
System: The UNT Digital Library