Afghanistan: Changes to Updated U.S. Civil-Military Strategic Framework Reflect Evolving U.S. Role (open access)

Afghanistan: Changes to Updated U.S. Civil-Military Strategic Framework Reflect Evolving U.S. Role

Correspondence issued by the Government Accountability Office with an abstract that begins "Although the October 2012 and the August 2013 versions of the U.S. Civil-Military Strategic Framework for Afghanistan have similarities, the two versions differ in several aspects. These differences reflect, among other things, the U.S. government's heightened emphasis on the transition, through the end of 2014, of security responsibility for Afghanistan to Afghan security institutions and the Afghan National Security Forces as well as the transition in U.S. policy toward a more traditional diplomatic and development model. Both versions of the framework address four categories of U.S. efforts in support of U.S. national goals in Afghanistan, with security, the first category, as the foundation for the other three categories, or "pillars"--governance, rule of law, and socioeconomic development. Both versions also address the same crosscutting issues. Differences between the two versions include the following:"
Date: April 1, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
CMS: Activities, Staffing, and Funding for the Center for Strategic Planning (open access)

CMS: Activities, Staffing, and Funding for the Center for Strategic Planning

Correspondence issued by the Government Accountability Office with an abstract that begins "CSP's activities, staff, and funding support strategic planning by individual CMS offices and centers as well as the agency itself. CMS officials told us that CSP assists individual offices and centers in developing strategic plans for their units, leads the agency's senior-level strategic planning meetings, and is helping to develop a centralized approach to monitor the implementation of CMS's agency-wide strategic plan. As of January 2013, CSP had 11 staff and it had $1.9 million in funds obligated for fiscal year 2012. Staff size and funding for CSP's most recent fiscal year represent a decrease compared to prior years, in part because CSP's activities have been narrowed in scope since the office was established in 2010, according to CMS officials. GAO provided a draft of this report to HHS for comment. After its review, HHS indicated that it did not have any comments."
Date: April 1, 2013
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
DOD Procurement of Mi-17 Helicopters (open access)

DOD Procurement of Mi-17 Helicopters

Correspondence issued by the Government Accountability Office with an abstract that begins "In summary, DOD's Office of the Secretary of Defense directed the Navy to cancel its competitive solicitation for 21 civilian Mi-17s because Russian authorities told DOD in late 2010 that, in accordance with Russian law, they would sell the helicopters only through Rosoboronexport since they were intended for military end use. Specifically, in response to letters written by the U.S. Ambassador to Russia, the Russian Ministry of Foreign Affairs confirmed to DOD that it considered the Mi-17s to be military because they were for use by the Afghan Air Force, and therefore could be sold only through Rosoboronexport, the sole entity responsible for Russian military exports."
Date: April 1, 2013
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Historical collection of preprints, reprints, working papers, correspondence, and other documents related to the "cold fusion" experiments conducted by Stanley Pons and Martin Fleischmann. (open access)

Historical collection of preprints, reprints, working papers, correspondence, and other documents related to the "cold fusion" experiments conducted by Stanley Pons and Martin Fleischmann.

Placeholder title sheet referencing a physical archival collection. The materials are not included.
Date: April 1, 2013
Creator: unknown
System: The UNT Digital Library
Military Base Realignments and Closures: Review of the Iowa and Milan Army Ammunition Plants (open access)

Military Base Realignments and Closures: Review of the Iowa and Milan Army Ammunition Plants

Correspondence issued by the Government Accountability Office with an abstract that begins "The 2005 Base Realignment and Closure (BRAC) Commission report recommended that the Army close Kansas and Lone Star Army Ammunition Plants and relocate certain munitions production-related functions from the Kansas and Lone Star Plants to Iowa and Milan (Tennessee) Army Ammunition Plants. As a result of the recommendations, the Army closed the Kansas and Lone Star Plants in 2009 and is in the process of relocating munitions production functions to the Iowa and Milan Plants. The 2005 BRAC recommendations must be completed by September 15, 2011. In addition, in February 2008, the U.S. Army Sustainment Command issued a request for proposals for operating and maintaining both the Iowa and Milan Plants. As part of the proposals, all offerors were to submit optimization plans for the optimum operation, maintenance, and utilization of the plants. In October 2008 the Army awarded a contract to American Ordnance for the operation and maintenance of the Iowa and Milan Plants at no direct cost to the government. Under the contract, American Ordnance will perform (among other things) security and maintenance for the facilities and will perform the actions identified in its Baseline Optimization …
Date: April 1, 2011
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Texas Attorney General Opinion: GA-0853 (open access)

Texas Attorney General Opinion: GA-0853

Document issued by the Office of the Attorney General of Texas in Austin, Texas, providing an interpretation of Texas law. It provides the opinion of the Texas Attorney General, Greg Abbott, regarding a legal question submitted for clarification: Whether volunteer assistant fire marshals may be designated as “reserve deputies” (RQ-0927-GA)
Date: April 1, 2011
Creator: Texas. Attorney-General's Office.
System: The Portal to Texas History
Texas Attorney General Opinion: GA-0854 (open access)

Texas Attorney General Opinion: GA-0854

Document issued by the Office of the Attorney General of Texas in Austin, Texas, providing an interpretation of Texas law. It provides the opinion of the Texas Attorney General, Greg Abbott, regarding a legal question submitted for clarification: Authority of the Harris County Department of Education to operate an on-site health clinic for its employees (RQ-0928-GA)
Date: April 1, 2011
Creator: Texas. Attorney-General's Office.
System: The Portal to Texas History
Transcript of Commission on Wartime Contracting in Iraq & Afghanistan Hearing: April 1, 2011 (open access)

Transcript of Commission on Wartime Contracting in Iraq & Afghanistan Hearing: April 1, 2011

Transcript of a public hearing held by the Commission on Wartime Contracting in Iraq & Afghanistan held April 1, 2011 in Washington, D.C. This hearing includes testimony from USAID administrator Dr. Rajiv Shah on the reform progress for the U.S. Agency for International Aid's contracting policy.
Date: April 1, 2011
Creator: CQ Transcriptions
System: The UNT Digital Library
High Energy Density Utracapacitors: Low-Cost, High Energy and Power Density, Nanotube-Enhanced Ultracapacitors (open access)

High Energy Density Utracapacitors: Low-Cost, High Energy and Power Density, Nanotube-Enhanced Ultracapacitors

Broad Funding Opportunity Announcement Project: FastCAP is improving the performance of an ultracapacitor—a battery-like electronic device that can complement, and possibly even replace, an HEV or EV battery pack. Ultracapacitors have many advantages over conventional batteries, including long lifespans (over 1 million cycles, as compared to 10,000 for conventional batteries) and better durability. Ultracapacitors also charge more quickly than conventional batteries, and they release energy more quickly. However, ultracapacitors have fallen short of batteries in one key metric: energy density—high energy density means more energy storage. FastCAP is redesigning the ultracapacitor’s internal structure to increase its energy density. Ultracapacitors traditionally use electrodes made of irregularly shaped, porous carbon. FastCAP’s ultracapacitors are made of tiny, aligned carbon nanotubes. The nanotubes provide a regular path for ions moving in and out of the ultracapacitor’s electrode, increasing the overall efficiency and energy density of the device.
Date: April 1, 2010
Creator: unknown
System: The UNT Digital Library
Military Personnel: Military and Civilian Pay Comparisons Present Challenges and Are One of Many Tools in Assessing Compensation (open access)

Military Personnel: Military and Civilian Pay Comparisons Present Challenges and Are One of Many Tools in Assessing Compensation

Correspondence issued by the Government Accountability Office with an abstract that begins "The Department of Defense's (DOD) military compensation package, which is a myriad of pays and benefits, is an important tool to attract and retain the number and quality of active duty servicemembers it needs to fulfill its mission. Compensation can be appropriate and adequate to attract and retain servicemembers when it is competitive with civilian compensation. However, comparisons between military and civilian compensation present both limitations and challenges. As we noted in 1986, exact compensation comparisons are not possible because no data exist which would allow an exact comparison of military and civilian personnel with the same levels of work experience. Also, nonmonetary considerations complicate military and civilian pay comparisons because their value cannot be quantified. Specifically, military service is unique in that the working conditions for active duty service carry the risk of death and injury during wartime and the potential for frequent, long deployments unlike most civilian jobs. The National Defense Authorization Act for Fiscal Year 2010 required that we conduct a study comparing pay and benefits provided by law to members of the Armed Forces with that of comparably situated private-sector employees to assess how …
Date: April 1, 2010
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Central Nevada Test Area, Nevada Fact Sheet (open access)

Central Nevada Test Area, Nevada Fact Sheet

The Central Nevada Test Area (CNTA) is in the Hot Creek Valley of south-central Nevada, approximately 70 miles northeast of Tonopah. The CNTA consists of three parcels totaling 2,560 acres. The parcels are spaced approximately 3 miles apart along a roughly north-south line. The total acreage is currently withdrawn from all forms of appropriation associated with mining laws and leasing. The U.S. Atomic Energy Commission, a predecessor agency of the U.S. Department of Energy (DOE), acquired the CNTA in the early 1960s to develop alternative sites to the Nevada National Security Site (formerly known as the Nevada Test Site) for underground nuclear testing. Three emplacement boreholes (UC-1, UC-3, and UC-4) were drilled on the three parcels at the CNTA for underground nuclear testing. The initial underground nuclear test at CNTA, Faultless, was conducted in borehole UC-1 at a depth of 3,199 feet below ground surface on January 19, 1968. The yield of the Faultless test was estimated to be 0.2 to 1 megaton. Its purpose was to evaluate the environmental and structural effects that might be expected if subsequent, higher-yield underground nuclear tests were conducted in this vicinity. The test resulted in a down-dropped fault block visible at land surface. …
Date: April 1, 2009
Creator: unknown
System: The UNT Digital Library
Contingency Contracting: DOD, State, and USAID Are Taking Actions to Track Contracts and Contractor Personnel in Iraq and Afghanistan (open access)

Contingency Contracting: DOD, State, and USAID Are Taking Actions to Track Contracts and Contractor Personnel in Iraq and Afghanistan

Testimony issued by the Government Accountability Office with an abstract that begins "The Departments of Defense (DOD) and State (State) and the U.S. Agency for International Development (USAID) have relied extensively on contractors to support troops and civilian personnel and carry out reconstruction efforts in Iraq and Afghanistan. While recognizing the benefits of using contactors, GAO and others have noted the risks and challenges associated with relying on contractors. To help increase contractor oversight, the National Defense Authorization Act for Fiscal Year 2008 directed DOD, State, and USAID to sign a memorandum of understanding (MOU) on contracting in Iraq and Afghanistan that identified a database to track information on contractor personnel and contracts performed in the two countries. In their July 2008 MOU, the agencies designated the Synchronized Pre-Deployment and Operational Tracker database (SPOT) as their system for tracking the required information. GAO's testimony addresses how contractor personnel and contract information can aid agencies in managing contracts and the status of SPOT's implementation. It is drawn from GAO's ongoing and prior contingency contracting work. This work involved meeting with agency officials, including those in Iraq, and reviewing agency documents. GAO obtained agency views on previously unreported information, which the agencies …
Date: April 1, 2009
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Defense Acquisitions: Measuring the Value of DOD's Weapon Programs Requires Starting with Realistic Baselines (open access)

Defense Acquisitions: Measuring the Value of DOD's Weapon Programs Requires Starting with Realistic Baselines

Testimony issued by the Government Accountability Office with an abstract that begins "n 2008, the cumulative cost growth in the Department of Defense's portfolio of 96 major defense acquisition programs was $296 billion and the average delay in delivering promised capabilities to the warfighter was 22 months. These poor outcomes mean that other critical defense and national priorities may go unfunded and that warfighters may go without the equipment they need to counter the changing threats that they face. GAO has examined extensively the issues in DOD's weapon system programs from the perspective of best practices in product development, and believes that significant improvements are possible. Because the ability to measure knowledge, processes, and outcomes is critical to achieving these improvements, GAO has used metrics to review the management and health of these programs from within the framework of best practices. This testimony discusses: 1) "knowledge metrics," used to determine how well programs manage technology, design, and manufacturing risks; 2) outcome metrics--concerning cost, schedule, and capability--that serve as "health indicators" of how well programs are being executed in terms of predicted outcomes; and 3) the prerequisites that GAO believes must be met in order for a program's plans and goals …
Date: April 1, 2009
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Effect of coarse woody debris manipulation on soricid and herpetofaunal communities in upland pine stands of the southeastern coastal plain. (open access)

Effect of coarse woody debris manipulation on soricid and herpetofaunal communities in upland pine stands of the southeastern coastal plain.

Abstract -The majority of studies investigating the importance of coarse woody debris (CWD) to forest- floor vertebrates have taken place in the Pacific Northwest and southern Appalachian Mountains, while comparative studies in the southeastern Coastal Plain are lacking. My study was a continuation of a long-term project investigating the importance of CWD as a habitat component for shrew and herpetofaunal communities within managed pine stands in the southeastern Coastal Plain. Results suggest that addition of CWD can increase abundance of southeastern and southern short-tailed shrews. However, downed wood does not appear to be a critical habitat component for amphibians and reptiles. Rising petroleum costs and advances in wood utilization technology have resulted in an emerging biofuels market with potential to decrease CWD volumes left in forests following timber harvests. Therefore, forest managers must understand the value of CWD as an ecosystem component to maintain economically productive forests while conserving biological diversity.
Date: April 1, 2009
Creator: Davis, Justin, Charles
System: The UNT Digital Library
High Speed Passenger Rail: Future Development Will Depend on Addressing Financial and Other Challenges and Establishing a Clear Federal Role (open access)

High Speed Passenger Rail: Future Development Will Depend on Addressing Financial and Other Challenges and Establishing a Clear Federal Role

Testimony issued by the Government Accountability Office with an abstract that begins "This testimony discusses the potential viability of high speed rail in the United States. Federal and other decision makers have had a renewed interest in how high speed rail might fit into the national transportation system and address increasing mobility constraints on highways and at airports due to congestion. This testimony is based on our report issued March 19, 2009, entitled High Speed Passenger Rail: Future Development Will Depend on Addressing Financial and Other Challenges and Establishing a Clear Federal Role. In preparing the report, we reviewed federal legislation; interviewed federal, state, local, and private sector officials, as well as U.S. project sponsors; and reviewed high speed rail development in France, Japan, and Spain. More detailed information on our scope and methodology appears in the March 19, 2009, report. We conducted our work in accordance with generally accepted government auditing standards. This statement focuses on (1) the factors affecting the economic viability of high speed rail projects, including difficulties in determining the economic viability of proposed projects; (2) the challenges in developing and financing high speed rail systems; and (3) the federal role in the potential development of …
Date: April 1, 2009
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Human Capital: Improved Implementation of Safeguards and an Action Plan to Address Employee Concerns Could Increase Employee Acceptance of the National Security Personnel System (open access)

Human Capital: Improved Implementation of Safeguards and an Action Plan to Address Employee Concerns Could Increase Employee Acceptance of the National Security Personnel System

Testimony issued by the Government Accountability Office with an abstract that begins "The Department of Defense (DOD) is in the process of implementing its new human capital system for managing civilian personnel--the National Security Personnel System (NSPS). Key components of NSPS include compensation, classification, and performance management. Implementation of NSPS could have far-reaching implications, not just for DOD, but for civil service reform across the federal government. As of February 2009, about 205,000 civilian employees were under NSPS. Based on GAO's prior work reviewing performance management in the public sector, GAO developed an initial list of safeguards that NSPS should include to ensure it is fair, effective, and credible. In 2008, Congress directed GAO to evaluate, among other things, the extent DOD implemented accountability mechanisms, including those in 5 U.S.C. section 9902(b)(7) and other internal safeguards in NSPS. This statement is based on GAO's September 2008 report, which determined (1) the extent to which DOD has implemented internal safeguards to ensure NSPS was fair, effective, and credible; and (2) how DOD civilians perceive NSPS and what actions DOD has taken to address these perceptions. For that report, GAO analyzed relevant documents and employee survey results; interviewed appropriate officials; and conducted …
Date: April 1, 2009
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Implementation of Strategies to Leverage Public and Private Resources for National Security Workforce Development (open access)

Implementation of Strategies to Leverage Public and Private Resources for National Security Workforce Development

This report documents implementation strategies to leverage public and private resources for the development of an adequate national security workforce as part of the National Security Preparedness Project (NSPP), being performed under a U.S. Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. There are numerous efforts across the United States to develop a properly skilled and trained national security workforce. Some of these efforts are the result of the leveraging of public and private dollars. As budget dollars decrease and the demand for a properly skilled and trained national security workforce increases, it will become even more important to leverage every education and training dollar. This report details some of the efforts that have been implemented to leverage public and private resources, as well as implementation strategies to further leverage public and private resources.
Date: April 1, 2009
Creator: unknown
System: The UNT Digital Library
Shoal, Nevada Site Fact Sheet (open access)

Shoal, Nevada Site Fact Sheet

The Shoal Site is situated on 2,560 acres of withdrawn federal lands located within the north-central portion of the Sand Springs Range in Churchill County, Nevada. The town of Fallon is the largest populated area in the region and is about 30 miles northwest of the site. The region around the Shoal Site is sparsely populated; military installations, recreation, ranching, and mining provide the dominant commercial interests. The Project Shoal underground nuclear test was part of the Vela Uniform program sponsored jointly by the U.S Department of Defense and U.S. Atomic Energy Commission (AEC), a predecessor agency of the U.S. Department of Energy (DOE). Vela Uniform was a research and development program directed toward locating, detecting, and identifying underground detonations. The objective of Project Shoal was to detonate a nuclear device underground in an active seismic area to improve the United States' ability to detect, identify, and locate underground nuclear detonations.
Date: April 1, 2009
Creator: unknown
System: The UNT Digital Library
Wildland Fire Management: Actions by Federal Agencies and Congress Could Mitigate Rising Fire Costs and Their Effects on Other Agency Programs (open access)

Wildland Fire Management: Actions by Federal Agencies and Congress Could Mitigate Rising Fire Costs and Their Effects on Other Agency Programs

Testimony issued by the Government Accountability Office with an abstract that begins "Our nation's wildland fire problems have worsened in the past decade. The Forest Service within the Department of Agriculture and four agencies within the Department of the Interior (Interior) are responsible for managing fires on federal lands. Federal appropriations to these agencies for wildland fire management have more than doubled since the late 1990s, averaging $2.9 billion annually in recent years. Rising wildland fire costs have challenged the agencies to meet their land management responsibilities. This testimony, based on previous GAO reports, discusses (1) the budgetary and programmatic effects of the increasing cost of fire management activities and (2) steps the agencies could take to help contain wildland fire expenditures and steps they could take, and Congress could consider, to reduce the need to transfer funds from other programs."
Date: April 1, 2009
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Defense Acquisitions: Assessment of Progress Made on Block 2006 Missile Defense Capabilities and Oversight (open access)

Defense Acquisitions: Assessment of Progress Made on Block 2006 Missile Defense Capabilities and Oversight

Testimony issued by the Government Accountability Office with an abstract that begins "Funded at $8 billion to nearly $10 billion per year, the Missile Defense Agency's (MDA) effort to develop and field a Ballistic Missile Defense System (BMDS) is the largest research and development program in the Department of Defense (DOD). The program has been managed in 2-year increments, known as blocks. Block 2006, the second BMDS block, was completed in December 2007. By law, GAO annually assesses MDA's progress. This testimony is based on GAO's March 2008 report that addressed MDA's progress in (1) meeting Block 2006 goals for fielding assets, completing work within estimated cost, conducting tests, and demonstrating the performance of the overall system in the field, and (2) making managerial improvements to transparency, accountability, and oversight. GAO reviewed the assets fielded; contractor cost, schedule, and performance; and tests completed during 2007. GAO also reviewed pertinent sections of the U.S. Code, acquisition policy, and the charter of a new missile defense board."
Date: April 1, 2008
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Defense Infrastructure: DOD Funding for Infrastructure and Road Improvements Surrounding Growth Installations (open access)

Defense Infrastructure: DOD Funding for Infrastructure and Road Improvements Surrounding Growth Installations

Correspondence issued by the Government Accountability Office with an abstract that begins "The Department of Defense (DOD) is simultaneously implementing a number of force realignments that contribute to personnel growth at military installations throughout the United States. DOD plans to execute over 800 actions from the 2005 Base Realignment and Closure (BRAC) round, which entail relocating over 123,000 personnel. Concurrent with its BRAC 2005 actions, DOD is also implementing or planning to implement other extensive worldwide transformation initiatives, which include relocating about 50,000 soldiers primarily from Europe and Korea to the United States; transforming the Army's force structure from an organization based on divisions to more rapidly deployable, brigade-based units (known as Army modularity); and increasing its active duty end strength by 92,000, all of which will affect DOD's facilities infrastructure. These force realignments will result in dramatic growth at some DOD installations across the United States. Based on data provided by the services, the DOD Office of Economic Adjustment (OEA) had identified, as of January 2008, 20 locations where expected growth as a result of force realignments in fiscal years 2006 through 2012 will adversely affect surrounding communities. The National Defense Authorization Act for Fiscal Year 2008 mandated that …
Date: April 1, 2008
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Federal Compensation Programs: Perspectives on Four Programs for Individuals Injured by Exposure to Harmful Substances (open access)

Federal Compensation Programs: Perspectives on Four Programs for Individuals Injured by Exposure to Harmful Substances

Testimony issued by the Government Accountability Office with an abstract that begins "The U.S. federal government has played an ever-increasing role in providing benefits to individuals injured as a result of exposure to harmful substances. Over the years, it has established several key compensation programs, including the Black Lung Program, the Vaccine Injury Compensation Program (VICP), the Radiation Exposure Compensation Program (RECP), and the Energy Employees Occupational Illness Compensation Program (EEOICP), which GAO has reviewed in prior work. Most recently, the Congress introduced legislation to expand the benefits provided by the September 11th Victim Compensation Fund of 2001. As these changes are considered, observations about other federal compensation programs may be useful. In that context, GAO's testimony today will focus on four federal compensation programs, including (1) the structure of the programs; (2) the cost of the programs through fiscal year 2004, including initial cost estimates and the actual costs of benefits paid, and administrative costs; and (3) the number of claims filed and factors that affect the length of time it takes to finalize claims and compensate eligible claimants. To address these issues, GAO relied on its 2005 report on four federal compensation programs. As part of that work, …
Date: April 1, 2008
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Health Savings Accounts: Participation Increased and Was More Common among Individuals with Higher Incomes (open access)

Health Savings Accounts: Participation Increased and Was More Common among Individuals with Higher Incomes

Correspondence issued by the Government Accountability Office with an abstract that begins "With health care spending increasing in the United States, you enacted legislation effective in 2004 establishing tax advantaged health savings accounts (HSA) to be coupled with high-deductible health insurance plans. HSA-eligible high-deductible health plans typically have lower premiums than traditional health plans and HSAs allow account holders to accumulate tax-free savings to pay for medical expenses. The novel structure of HSA-eligible plans coupled with HSAs has raised questions about who selects them and how they use the accounts. Proponents contend that the low premiums of HSA-eligible plans and the tax-free savings potential of HSAs appeal to many consumers, while the high deductibles encourage them to be more astute health care consumers. However, some critics are concerned that HSA-eligible plans may attract enrollees who seek lower premiums but lack the resources to contribute to an HSA, and wealthy enrollees who may seek to use the HSA primarily to accumulate tax-advantaged savings rather than pay for medical expenses. In a 2006 report, GAO described individuals' early experiences with HSA-eligible plans and HSAs and certain characteristics of HSA account holders. You asked us to update certain information from that report with …
Date: April 1, 2008
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Internal Control: Improvements Needed in SEC's Accounting and Financial Reporting Process (open access)

Internal Control: Improvements Needed in SEC's Accounting and Financial Reporting Process

Correspondence issued by the Government Accountability Office with an abstract that begins "On November 16, 2007, we issued our report on the U.S. Securities and Exchange Commission's (SEC) fiscal years 2007 and 2006 financial statements and on SEC's internal control as of September 30, 2007. We also reported on the results of our tests of SEC's compliance with selected provisions of laws and regulations during fiscal year 2007. The purpose of this report is to present areas of SEC's internal controls identified during our fiscal year 2007 audit that could be improved. This report contains 14 recommendations to SEC to improve these internal controls and procedures. These recommendations are in addition to those we already provided to SEC as a result of our prior audits of SEC's financial statements."
Date: April 1, 2008
Creator: United States. Government Accountability Office.
System: The UNT Digital Library