N >= 4 Supergravity Amplitudes from Gauge Theory at Two Loops (open access)

N >= 4 Supergravity Amplitudes from Gauge Theory at Two Loops

We present the full two-loop four-graviton amplitudes in N = 4, 5, 6 supergravity. These results were obtained using the double-copy structure of gravity, which follows from the recently conjectured color-kinematics duality in gauge theory. The two-loop four-gluon scattering amplitudes in N = 0, 1, 2 supersymmetric gauge theory are a second essential ingredient. The gravity amplitudes have the expected infrared behavior: the two-loop divergences are given in terms of the squares of the corresponding one-loop amplitudes. The finite remainders are presented in a compact form. The finite remainder for N = 8 supergravity is also presented, in a form that utilizes a pure function with a very simple symbol.
Date: February 15, 2012
Creator: Boucher-Veronneau, C. & Dixon, L. J.
Object Type: Article
System: The UNT Digital Library
A 10,000 groove/mm multilayer coated grating for EUV spectroscopy (open access)

A 10,000 groove/mm multilayer coated grating for EUV spectroscopy

Ultra-high spectral resolution in the EUV and soft x-ray energy ranges requires the use of very high line density gratings with optimal design resulting in use of a Blazed Multilayer Grating (BMG) structure. Here we demonstrate the production of near-atomically perfect Si blazed substrates with an ultra-high groove density (10,000 l/mm) together with the measured and theoretical performance of an Al/Zr multilayer coating on the grating. A 1st order absolute efficiency of 13percent and 24.6percent was achieved at incidence angles of 11o and 36o respectively. Cross-sectional TEM shows the effect of smoothing caused by the surface mobility of deposited atoms and we correlate this effect with a reduction in peak diffraction efficiency. This work shows the high performance that can be achieved with BMGs based on small-period anisotropic etched Si substrates, but also the constraints imposed by the surface mobility of deposited species.
Date: February 7, 2011
Creator: Voronov, Dmytro; Anderson, Erik; Cambie, Rossana; Cabrini, Stefano; Dhuey, Scott; Goray, Leonid et al.
Object Type: Article
System: The UNT Digital Library
The 10-20-30 Plan and Persistent Poverty Counties (open access)

The 10-20-30 Plan and Persistent Poverty Counties

This report discusses the 10-20-30 plan of reallocating funds in rural development programs toward counties with systemic poverty levels defined as 20% of the population being at or below poverty level for 30 years. This report explains why targeting funds to persistent poverty counties might be of interest, how "persistent poverty" is defined and measured, and how different interpretations of the definition and different data source selections could yield different lists of counties identified as persistently poor. This report does not compare the 10-20-30 plan's advantages and disadvantages against other policy options, nor does it examine the range of programs or policy goals for which the 1020-30 plan might be an appropriate policy tool.
Date: February 8, 2018
Creator: Dalaker, Joseph
Object Type: Report
System: The UNT Digital Library
20% Wind by 2030: Overcoming the Challenges in West Virginia (open access)

20% Wind by 2030: Overcoming the Challenges in West Virginia

Final Report for '20% Wind by 2030: Overcoming the Challenges in West Virginia'. The objective of this project was to examine the obstacles and constraints to the development of wind energy in West Virginia as well as the obstacles and constraints to the achievement of the national goal of 20% wind by 2030. For the portion contracted with WVU, there were four tasks in this examination of obstacles and constraints. Task 1 involved the establishment of a Wind Resource Council. Task 2 involved conducting limited research activities. These activities involved an ongoing review of wind energy documents including documents regarding the potential for wind farms being located on reclaimed surface mining sites as well as other brownfield sites. The Principal Investigator also examined the results of the Marshall University SODAR assessment of the potential for placing wind farms on reclaimed surface mining sites. Task 3 involved the conducting of outreach activities. These activities involved working with the members of the Wind Resource Council, the staff of the Regional Wind Energy Institute, and the staff of Penn Future. This task also involved the examination of the importance of transmission for wind energy development. The Principal Investigator kept informed as to transmission …
Date: February 15, 2012
Creator: Mann, Patrick & Risch, Christine
Object Type: Report
System: The UNT Digital Library
35 Years of Innovation: The National Renewable Energy Laboratory Leads the Way to a Clean Energy Future (Brochure) (open access)

35 Years of Innovation: The National Renewable Energy Laboratory Leads the Way to a Clean Energy Future (Brochure)

With a history of over 35 years of successful innovation, this booklet highlights some of the many successes throughout the years.
Date: February 1, 2012
Creator: unknown
Object Type: Report
System: The UNT Digital Library
317/319 Phytoremediation site monitoring report - 2009 growing season : final report. (open access)

317/319 Phytoremediation site monitoring report - 2009 growing season : final report.

In 1999, Argonne National Laboratory (Argonne) designed and installed a series of engineered plantings consisting of a vegetative cover system and approximately 800 hybrid poplars and willows rooting at various predetermined depths. The plants were installed using various methods including Applied Natural Science's TreeWell{reg_sign} system. The goal of the installation was to protect downgradient surface and groundwater by intercepting the contaminated groundwater with the tree roots, removing moisture from the upgradient soil area, reducing water infiltration, preventing soil erosion, degrading and/or transpiring the residual volatile organic compounds (VOCs), and removing tritium from the subsoil and groundwater. This report presents the results of the monitoring activities conducted by Argonne's Energy Systems (ES) Division in the growing season of 2009. Monitoring of the planted trees began soon after the trees were installed in 1999 and has been conducted every summer since then. As the trees grew and consolidated their growth into the contaminated soil and groundwater, their exposure to the contaminants was progressively shown through tissue sampling. During the 2009 sampling campaign, VOC concentrations found in the French Drain area were in general consistent with or slightly lower than the 2008 results. Additionally, closely repeated, stand wide analyses showed contaminant fluctuations that …
Date: February 10, 2010
Creator: Negri, C .N.; Benda, P. L.; Gopalakrishnan, G. & Systems, Energy
Object Type: Report
System: The UNT Digital Library
T-1025 IU SciBath-768 detector tests in MI-12 (open access)

T-1025 IU SciBath-768 detector tests in MI-12

This is a memorandum of understanding between the Fermi National Accelerator Laboratory (Fermilab) and the experimenters of Department of Physics and Center for Exploration of Energy and Matter, Indiana University, who have committed to participate in detector tests to be carried out during the 2012 Fermilab Neutrino program. The memorandum is intended solely for the purpose of recording expectations for budget estimates and work allocations for Fermilab, the funding agencies and the participating institutions. it reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to modify this memorandum to reflect such required adjustments. Actual contractual obligations will be set forth in separate documents. The experimenters propsoe to test their prototype 'SciBat-768' detector in the MI-12 building for 3 months (February-April) in Spring 2012. The major goal of this effort is to measure or limit the flux of beam-induced neutrons in a far-off-axis (> 45{sup o}) location of the Booster Neutrino Beamline (BNB). This flux is of interest for a proposed coherent neutral-current neutrino-argon elastic scattering experiment. A second goal is to collect more test data for the SciBath-768 to …
Date: February 11, 2012
Creator: Tayloe, Rex; Cooper, R.; Garrison, L.; Thornton, T.; Rebenitsch, L.; DeJongh, Fritz et al.
Object Type: Report
System: The UNT Digital Library
1099 Information Reporting Requirements and Penalties as Modified by the Patient Protection and Affordable Care Act and the Small Business Jobs Act of 2010 (open access)

1099 Information Reporting Requirements and Penalties as Modified by the Patient Protection and Affordable Care Act and the Small Business Jobs Act of 2010

This report discuses the 2010 expansion of reporting requirements listed in IRC (Internal Revenue Code) 6041. The controversy in these expansions lies in the burden the expansion imposes on small businesses. The report also describes the pieces of legislation that have amended IRC 6041, and the implications of that legislation along with the consequences of IRC 6041.
Date: February 25, 2011
Creator: Pettit, Carol A. & Liu, Edward C.
Object Type: Report
System: The UNT Digital Library
The 2009 Asia Pacific Economic Cooperation (APEC) Meetings and U.S. Trade Policy in Asia (open access)

The 2009 Asia Pacific Economic Cooperation (APEC) Meetings and U.S. Trade Policy in Asia

This report discusses the Asia Pacific Economic Cooperation forum (APEC) approach to trade liberalization, results of the 2009 meetings in Singapore, APEC and U.S. trade policy in Asia as well as other issues regarding APEC.
Date: February 4, 2010
Creator: Martin, Michael F.
Object Type: Report
System: The UNT Digital Library
2010 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste Pond (open access)

2010 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste Pond

This report describes conditions, as required by the state of Idaho Industrial Wastewater Reuse Permit (#LA 000161 01, Modification B), for the wastewater land application site at the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste Pond from November 1, 2009 through October 31, 2010. The report contains the following information: • Facility and system description • Permit required effluent monitoring data and loading rates • Groundwater monitoring data • Status of compliance activities • Discussion of the facility’s environmental impacts During the 2010 permit year, approximately 164 million gallons of wastewater were discharged to the Cold Waste Pond. As shown by the groundwater sampling data, sulfate and total dissolved solids concentrations are highest near the Cold Waste Pond and decrease rapidly as the distance from the Cold Waste Pond increases. Although concentrations of sulfate and total dissolved solids are elevated near the Cold Waste Pond, both parameters were below the Ground Water Quality Rule Secondary Constituent Standards in the down gradient monitoring wells.
Date: February 1, 2011
Creator: lewis, mike
Object Type: Report
System: The UNT Digital Library
2010 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site's Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond (open access)

2010 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site's Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond

This report describes conditions, as required by the state of Idaho Industrial Wastewater Reuse Permit (#LA 000160 01), for the wastewater reuse site at the Idaho National Laboratory Site’s Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond from May 1, 2010 through October 31, 2010. The report contains the following information: • Facility and system description • Permit required effluent monitoring data and loading rates • Groundwater monitoring data • Status of special compliance conditions • Discussion of the facility’s environmental impacts During the 2010 partial reporting year, an estimated 3.646 million gallons of wastewater were discharged to the Industrial Waste Ditch and Pond which is well below the permit limit of 13 million gallons per year. The concentrations of all permit-required analytes in the samples from the down gradient monitoring wells were below the Ground Water Quality Rule Primary and Secondary Constituent Standards.
Date: February 1, 2011
Creator: Frederick, David B.
Object Type: Report
System: The UNT Digital Library
2010 Annual Progress Report: DOE Hydrogen Program (open access)

2010 Annual Progress Report: DOE Hydrogen Program

In the past year, the DOE Hydrogen Program (the Program) made substantial progress toward its goals and objectives. The Program has conducted comprehensive and focused efforts to enable the widespread commercialization of hydrogen and fuel cell technologies in diverse sectors of the economy. With emphasis on applications that will effectively strengthen our nation's energy security and improve our stewardship of the environment, the Program engages in research, development, and demonstration of critical improvements in the technologies. Highlights of the Program's accomplishments can be found in the sub-program chapters of this report.
Date: February 1, 2011
Creator: unknown
Object Type: Report
System: The UNT Digital Library
2010 Annual Wastewater Reuse Report for the Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant (open access)

2010 Annual Wastewater Reuse Report for the Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant

This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2009, through October 31, 2010. The report contains the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of special compliance conditions • Discussion of the facility’s environmental impacts. During the 2010 permit year, approximately 2.2 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Area Sewage Treatment plant.
Date: February 1, 2011
Creator: lewis, Mike
Object Type: Report
System: The UNT Digital Library
2010 Census: Key Enumeration Activities Are Moving Forward, but Information Technology Systems Remain a Concern (open access)

2010 Census: Key Enumeration Activities Are Moving Forward, but Information Technology Systems Remain a Concern

Testimony issued by the Government Accountability Office with an abstract that begins "In March 2008, GAO designated the 2010 Census a high-risk area in part because of information technology (IT) shortcomings and uncertainty over the ultimate cost of the census, now estimated at around $15 billion. The U.S. Census Bureau (Bureau) has since made improvements to various IT systems and taken other steps to mitigate the risks of a successful census. However, last year, GAO noted that a number of challenges and uncertainties remained, and much work remained to be completed under very tight time frames. As requested, this testimony provides an update on the Bureau's readiness for an effective headcount, covering (1) the status of key IT systems; (2) steps the Bureau has taken to revise its cost estimates; and (3) the extent to which critical enumeration activities, particularly those aimed at hard-to-count populations, are on track. The testimony is based on previously issued and ongoing GAO work."
Date: February 23, 2010
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
2010 Census: Operational Changes Made for 2010 Position the U.S. Census Bureau to More Accurately Classify and Identify Group Quarters (open access)

2010 Census: Operational Changes Made for 2010 Position the U.S. Census Bureau to More Accurately Classify and Identify Group Quarters

Testimony issued by the Government Accountability Office with an abstract that begins "The U.S. Census Bureau (Bureau) is tasked with conducting an accurate count of people living in dwellings known as group quarters as part of the 2010 Census. Group quarters consist of college dormitories, prisons, nursing homes, and other facilities typically owned or managed by an entity providing housing, services, or both for the residents. During the 2000 Census, for a variety of reasons, group quarters were sometimes counted more than once, missed, or included in the wrong location. As requested, this testimony will focus on (1) the extent to which the Bureau has strengthened its procedures for counting group quarters compared to the 2000 Census, and (2) particular challenges and opportunities for an accurate group quarters count in Brooklyn. The testimony is based on previously issued and ongoing GAO work in New York and elsewhere."
Date: February 22, 2010
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
The 2010 Decennial Census: Background and Issues (open access)

The 2010 Decennial Census: Background and Issues

This report summarizes the information and background of the 2010 census. The report outlines what the census is and why it is necessary. Moreover, it describes the new methods used and the issues encountered by using those methods.
Date: February 3, 2011
Creator: Williams, Jennifer D.
Object Type: Report
System: The UNT Digital Library
2010 Ecological Survey of the Pacific Northwest National Laboratory Site (open access)

2010 Ecological Survey of the Pacific Northwest National Laboratory Site

The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL Site comply with applicable laws, policies, and DOE orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL Site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental …
Date: February 16, 2011
Creator: Chamness, Michele A.; Perry, Christopher; Downs, Janelle L. & Powell, Sylvia D.
Object Type: Report
System: The UNT Digital Library
2010 Groundwater Monitoring and Inspection Report Gnome-Coach Site, New Mexico (open access)

2010 Groundwater Monitoring and Inspection Report Gnome-Coach Site, New Mexico

This report presents the 2010 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Gnome-Coach (Gnome) Site in New Mexico (Figure 1). Groundwater monitoring consisted of collecting hydraulic head data and groundwater samples from the wells on site. Historically, the U.S. Environmental Protection Agency (EPA) had conducted these annual activities under the Long-Term Hydrologic Monitoring Program (LTHMP). LM took over the sampling and data collection activities in 2008 but continues to use the EPA Radiation and Indoor Environments National Laboratory in Las Vegas, Nevada, to analyze the water samples. This report summarizes groundwater monitoring and site investigation activities that were conducted at the site during calendar year 2010.
Date: February 1, 2011
Creator: unknown
Object Type: Report
System: The UNT Digital Library
2010 Groundwater Monitoring Report Central Nevada Test Area, Corrective Action Unit 443 (open access)

2010 Groundwater Monitoring Report Central Nevada Test Area, Corrective Action Unit 443

This report presents the 2010 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) for the Central Nevada Test Area (CNTA) Subsurface Corrective Action Unit (CAU) 443. Responsibility for the environmental site restoration of CNTA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 443 are conducted in accordance with the Federal Facility Agreement and Consent Order entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof-of-concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 443 that were conducted at the site from December 2009 through December 2010. It also represents the second year of the enhanced monitoring network and the 5-year proof-of-concept monitoring period that is intended to validate the compliance boundary
Date: February 1, 2011
Creator: unknown
Object Type: Report
System: The UNT Digital Library
2010 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447 (open access)

2010 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

This report presents the 2010 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended March 2010) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes monitoring in support of site closure. This report summarizes the results from the groundwater monitoring program during fiscal year 2010.
Date: February 1, 2011
Creator: unknown
Object Type: Report
System: The UNT Digital Library
2010 Radiological Monitoring Results Associated with the Advance Test Reactor Complex Cold Waste Pond (open access)

2010 Radiological Monitoring Results Associated with the Advance Test Reactor Complex Cold Waste Pond

This report summarizes radiological monitoring performed of the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste wastewater prior to discharge into the Cold Waste Pond and of specific groundwater monitoring wells associated with the Industrial Wastewater Reuse Permit (#LA-000161-01, Modification B). All radiological monitoring is performed to fulfill Department of Energy requirements under the Atomic Energy Act.
Date: February 1, 2011
Creator: lewis, mike
Object Type: Report
System: The UNT Digital Library
2010 Soil Characterization Report for the Area 11 Explosive Ordnance Disposal Unit, Nevada Test Site (open access)

2010 Soil Characterization Report for the Area 11 Explosive Ordnance Disposal Unit, Nevada Test Site

This soil characterization report summarizes sampling activities and analytical results, provides copies of laboratory data reports, and meets the requirements of Section IV.G.2 of the Permit (NEV HW0021, November 2005) and Sections P.3.d.7.b and P.3.n of the Permit Application (DOE/NV--1053-VOL 4, May 2005).
Date: February 25, 2010
Creator: National Security Technologies, LLC
Object Type: Report
System: The UNT Digital Library
2011 Alkaline Membrane Fuel Cell Workshop Final Report (open access)

2011 Alkaline Membrane Fuel Cell Workshop Final Report

A workshop addressing the current state-of-the-art in alkaline membrane fuel cells (AMFCs) was held May 8-9, 2011, at the Crystal Gateway Marriott in Arlington, Virginia. This workshop was the second of its kind, with the first being held December 11-13, 2006, in Phoenix, Arizona. The 2011 workshop and associated workshop report were created to assess the current state of AMFC technology (taking into account recent advances), investigate the performance potential of AMFC systems across all possible power ranges and applications, and identify the key research needs for commercial competitiveness in a variety of areas.
Date: February 1, 2012
Creator: Pivovar, B.
Object Type: Article
System: The UNT Digital Library
2011 Annual Ecological Survey: Pacific Northwest National Laboratory Site (open access)

2011 Annual Ecological Survey: Pacific Northwest National Laboratory Site

The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL site comply with applicable laws, policies, and DOE Orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental …
Date: February 27, 2012
Creator: Becker, James M. & Chamness, Michele A.
Object Type: Report
System: The UNT Digital Library