Development of a precast bridge deck overhang system (open access)

Development of a precast bridge deck overhang system

This research investigated the overhang and shear capacity of a precast overhang system for potential use during the construction of bridges with precast overhang panels. The research was performed in three phases: the Phase 1 research including work specifically for the Rock Creek Bridge in Parker County, Texas; the Phase 2 research for general precast overhang panels, and; the Phase 3 research investigating the shear capacity. Grout material characteristics were also assessed for possible use in the haunch; constructability issues were also addressed.
Date: February 2011
Creator: Trejo, David; Head, Monique H.; Mander, John; Mander, Thomas J.; Henley, Mathew; Scott, Reece et al.
System: The Portal to Texas History
Realtime monitoring of bridge scour using remote monitoring technology (open access)

Realtime monitoring of bridge scour using remote monitoring technology

Report on research performed on the application of instruments including accelerometers and tiltmeters to monitor bridge scour. The instrumentation on the two bridges does not show great hope of application of accelerometers to monitor bridge scour because of a lack of sufficient excitation from traffic. Tiltmeters can provide the integral behavior of the bridge, and therefore are very useful devices for scour monitoring. Guidelines and protocols for scour monitoring based on the US59 over Guadalupe River Bridge and the SH80 over San Antonio River Bridge are provided in the study.
Date: February 2011
Creator: Briaud, Jean-Louis; Hurlebaus, Stefan; Chang, Kuang-An; Yao, Congpu; Sharma, Hrishikesh; Yu, Ok-Youn et al.
System: The Portal to Texas History
Evaluating the Impact of Overweight Load Routing on Buried Utility Facilities [Report 1] (open access)

Evaluating the Impact of Overweight Load Routing on Buried Utility Facilities [Report 1]

From abstract: This report focuses on the year one project objectives, which were (a) provide a review of technical design and engineering requirements for utility accommodation in Texas, (b) provide a preliminary assessment of potential impact of overweight loads on buried utilities, (c) provide a preliminary assessment of Utility Accommodation Rules (UAR) adequacy to deal with overweight loads on buried utilities, (d) provide preliminary recommendations for a business process for Texas Department of Transportation overweight routing coordination, and (e) provide recommendations for the phase 2 utility damage evaluation.
Date: February 2011
Creator: Kraus, Edgar; Fernando, Emmanuel; Li, Yingfeng; Oh, Jeong Ho; Koncz, Nicholas & Quiroga, Cesar
System: The Portal to Texas History
Development of a MASH TL-3 median barrier gate (open access)

Development of a MASH TL-3 median barrier gate

Report regarding a median barrier gate designed to both offer protection to motorists and easier cross-median access for emergency and maintenance vehicles.
Date: February 2011
Creator: Bligh, Roger P.; Arrington, Dusty R.; Sheikh, Nauman Mansoor; Silvestri, Chiara & Menges, Wanda L.
System: The Portal to Texas History