Child Abuse: History, Legislation and Issues (open access)

Child Abuse: History, Legislation and Issues

This report is on Child Abuse: History, Legislation, and Issues.
Date: February 4, 1981
Creator: Jones, Jean Yavis & Fowler, Jan
System: The UNT Digital Library
H-coal pilot plant. Phase II. Construction. Phase III. Operation. Annual report No. 3 (open access)

H-coal pilot plant. Phase II. Construction. Phase III. Operation. Annual report No. 3

At the request of DOE Oak Ridge, ASFI agreed to assume responsibility for completion of Plant construction in December, 1979, at which time Badger Plants' on-site work was ended. This construction effort consisted of electric heat tracing and insulation of piping and instrumentation. At the close of the reporting period the work was completed, or was projected to be completed, within the ASFI budgeted amounts and by dates that will not impact Plant operations. Engineering design solutions were completed for problems encountered with such equipment as the High Pressure Letdown Valves; Slurry Block Valves; Slurry Pumps; the Bowl Mill System; the Dowtherm System; and the Ebullating Pump. A Corrosion Monitoring Program was established. With the exception of Area 500, the Antisolvent Deashing Unit, all operating units were commissioned and operated during the reporting period. Coal was first introduced into the Plant on May 29, 1980, with coal operations continuing periodically through September 30, 1980. The longest continuous coal run was 119 hours. A total of 677 tons of Kentucky No. 11 Coal were processed during the reporting period. The problems encountered were mechanical, not process, in nature. Various Environmental and Health programs were implemented to assure worker safety and protection …
Date: February 4, 1981
Creator: unknown
System: The UNT Digital Library