Final Environmental Statement by the U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation for Montague Nuclear Power Station, Units 1 and 2 (open access)

Final Environmental Statement by the U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation for Montague Nuclear Power Station, Units 1 and 2

The proposed project: Pursuant to the Atomic Energy Act, as amended, the U.S. Nuclear Regulatory Commission's regulations in Title 10, Code of Federal Regulations, an application with an accompanying Environmental Report, was filed by Northeast Utilities (hereinafter referred to as the applicant) for construction permits for two generating units designated as the Montague Nuclear Power Station, Units 1 and 2 (Docket Nos. 50-496 and 50-497), each of which is powered by a boiling water reactor (BWR) and is designed for initial operation at approximately 3579 megawatts thermal (MWt) with a net electrical output of 1150 megawatts electric (MWe). A safety design rating of 3759 (MWt) has been used in assessing the impact in this report. Condenser cooling will be accomplished through the use of natural-draft cooling towers. Makeup water for the cooling towers will be obtained from the Connecticut River, and the tower discharge (blowdown) will be returned to the Connecticut River. The proposed facilities will be located on the 1900-acre Montague Plain in the Town of Montague, Franklin County, in northwestern Massachusetts about 1.8 miles east of the Connecticut River and about 3.5 miles east-southeast of the Town of Greenfield, Massachusetts, the largest community within 10 miles with a …
Date: February 1977
Creator: U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation.
System: The UNT Digital Library