NSLS infra-red beam line (U3) conceptual design report (open access)

NSLS infra-red beam line (U3) conceptual design report

We describe the conceptual design of an infrared (I-R) beam line on the vacuum-ultra-violet storage ring of the National Synchrotron Light Source. The beam line forms part of the Phase II expansion of the NSLS. Consistent with the implementation of the current design is the extraction of hitherto wasted radiation and the establishment of a mezzanine floor or platform to make full use of the available headroom. This means that the I-R beam line, once established, does not interfere with any existing operations on the VUV floor.
Date: February 9, 1984
Creator: Williams, G. P.
System: The UNT Digital Library