Serial/Series Title
States
2 Matching Results
Results open in a new window/tab.
Results:
1 - 2 of
2
Preliminary Design Requirements Argonne Boiling Reactor (ARBOR) Facility
From Introduction: "Descriptions of the functional requirements of the facility, together with preliminary concepts of methods for meeting them, are presented in this prospectus."
Date:
July 15, 1957
Creator:
Fromm, L. W.; Bernsen, S. A.; Bullinger, C. F. & Matousek, J. F.
System:
The UNT Digital Library
Addendum to Hazard Summary Report Experimental Breeder Reactor-II (EBR-II)
Report containing hazard and safety information regarding the Experimental Breeder Reactor-II in Idaho.
Date:
June 1962
Creator:
Koch, L. J.; Loewenstein, W. B. & Monson, H. O.
System:
The UNT Digital Library