The Fabrication of a Plutonium Helix for a Doppler Experiment (open access)

The Fabrication of a Plutonium Helix for a Doppler Experiment

A helix constructed of plutonium was made to test the Doppler temperature effect in ZPR-III. The helix, 1 inch in diameter and 6-1/4 inches long, contained 240 grams of delta-phase plutonium alloy encapsulated in titanium tubing. Four plutonium rods were extruded, joined together, and pushed into a titanium tube. This tube was swaged tightly over the plutonium rod, and the assembly was wound into a coil. Electrical leads to the coil were made by swaging copper tubing over the ends of the coil. The helix was tested by cycling about 500 times between 50°C and 190°C. The coil was heated with a current of 130 amperes and cooled with a blast of chilled helium. (1) Several helices of uranium(2) were cycled during the same tests. Despite the severity of the thermal cycles, the helices were undamaged.
Date: December 1958
Creator: Dunworth, R. J.; Rhude, H. V. & Kelman, L. R.
System: The UNT Digital Library
A laboratory Ivestigation of the Fluorination of Crude Uranium Tertrafluoride (open access)

A laboratory Ivestigation of the Fluorination of Crude Uranium Tertrafluoride

Ore concentrates have been converted directly to crude uranium tetrafluoride by hydrogen reduction and hydrofluorination in fluidized-bed reactors. Small-scale laboratory experiments demonstrated that this process can be extended to the production of crude uranium hexafluoride through fluorination of the uranium tetrafluoride in a fluidized bed. The satisfactory temperature range for the reaction lies between 300°C and 600°C. At 450°C the fluorine utilization is between 50 and 80 per cent. With excess fluorine, over 99 per cent of the uranium is volatilized from the solid material. The fluidization characteristics of certain materials are improved by the addition of an inert solid diluent to the bed.
Date: December 1957
Creator: Sandus, O. & Steunenberg, R. K.
System: The UNT Digital Library
Chemical Engineering Division Summary Report July, August, and September, 1957 (open access)

Chemical Engineering Division Summary Report July, August, and September, 1957

Development work continued on a fused salt process for the recovery of uranium from zirconium-matrix fuel alloys. The fuel is dissolved in a sodium fluoride-zirconium fluoride melt at 600°C by hydrogen fluoride sparging. The melt is then sparged with fluorine gas which volatilizes the dissolved uranium as the hexafluoride. The final decontamination and purification of the uranium hexafluoride are accomplished by fractional distillation. The testing of graphite as a container material for the hydrofluorination step was continued. Additional thermal cycling experiments were performed, using a helium sparge in equimolar sodium fluoride-zirconium fluoride melt at 600°C. The extent of penetration of the fused salt into the graphite was determined. No mechanical degradation was present. Dimensional change data were also obtained for graphite vessels in which the fused salt was sparged with hydrogen fluoride.
Date: December 1957
Creator: Lawroski, Stephen; Rodger, W. A.; Vogel, R. C. & Munnecke, V. H.
System: The UNT Digital Library
Quarterly Report October, November and December, 1956 (open access)

Quarterly Report October, November and December, 1956

Methods of producing extremely clean surfaces on rolled Zircaloy-2 strip have been investigated. It has been found that the finer abrasives, 400 mesh or finer, are more effective than coarse types because of their ability to penetrate pits and crevices more readily. Two such cleanings, with an intermediate 35 v/o HNO3-5 v/o HF pickle, resulted in a microscopically clean surface. Ultrasonic inspection of the EBWR fuel plates has been completed during this quarter. Approximately 95% of the plates were found acceptable. All subassemblies manufactured from the EBWR plates met dimensional specifications and passed 9-day corrosion tests at 290°C (550°F). All thoria-urania pellets for the loading of Borax-IV have been pressed, loaded into tube plates, and fabricated into subassemblies. The total number of subassemblies made was 82, of which 72 were fuel plates and 10 were blanket plates, more than sufficient for the loading. The reactor has gone critical using this loading.
Date: December 31, 1956
Creator: Foote, Frank G.; Schumar, James F. & Chiswik, Haim H.
System: The UNT Digital Library
Chemical Engineering Division Summary Report July, August, and September, 1956 (open access)

Chemical Engineering Division Summary Report July, August, and September, 1956

Additional runs have been made in the six-inch, continuous-flow mixing chamber to study the rate of mass transfer between isobutanol and water. These runs were inconclusive because the effluents were mutually saturated. A new four-inch cell has been designed and is being fabricated; this will permit a reduction in the time available for mass transfer. Consideration has been given to other liquid pairs which may transfer more slowly than isobutanol-water. The system nitrobenzene-ethylene glycol appears attractive.
Date: December 1956
Creator: Rodger, W. A.; Vogel, R. C. & Munnecke, V. H.
System: The UNT Digital Library