Engineering Task Plan for the 241-AN-105 Multi-Function Corrosion Monitoring System (open access)

Engineering Task Plan for the 241-AN-105 Multi-Function Corrosion Monitoring System

This Engineering Task Plan (ETP) describes the activities associated with the installation of the corrosion probe assembly into riser WST-RISER-016 (formerly 15B) of tank 241-AN-105. The corrosion monitoring system utilizes the technique of electrochemical noise (EN) for monitoring waste tank corrosion. Typically, EN consists of low frequency (4 Hz) and small amplitude signals that are spontaneously generated by electrochemical reactions occurring at corroding or other surfaces. EN analysis is well suited for monitoring and identifying the onset of localized corrosion, and for measuring uniform corrosion rates. A typical EN based corrosion-monitoring system measures instantaneous fluctuations in corrosion current and potential between three nominally identical electrodes of the material of interest immersed in the environment of interest. Time-dependent fluctuations in corrosion current are described by electrochemical current noise, and time-dependent fluctuations of corrosion potential are described by electrochemical noise. The corrosion monitoring system is designed to detect the onset of localized corrosion phenomena if tank conditions should change to allow these phenomena to occur. In addition to the EN technique, the system also facilitates the use of the Linear Polarization Resistance (LPR) technique to collect uniform corrosion rate information. LPR measures the linearity at the origin of the polarization curve for …
Date: August 25, 1999
Creator: EDGEMON, G.L.
System: The UNT Digital Library
Engineering Analysis of Characterization Ramps and Platforms (open access)

Engineering Analysis of Characterization Ramps and Platforms

The calculations in Appendix A and B determine the adequacy of the ramps and platforms to accomplish two tasks: (1) Core sampling using the modifications imposed by the use of a FDNW foundation at PFP; and (2) Core sampling within the 200E and 200W Tank Farms without the imposed modifications. The calculations in this document determined that the ramps and platforms are adequate for use with core sampling equipment when sampling either tank 241-2-361 or within 200E or 200W Tank Farms. When sampling tank 241-2-361 the modifications made by ECN 651132 must be implemented. These modifications are the addition of diagonal cross bracing on both the lateral and longitudinal sides. Also, a 1 1/4 inch tie rod must connect both bases of each longitudinal side.
Date: August 25, 1999
Creator: Boger, R. M.
System: The UNT Digital Library
Hazard evaluation for 244-AR vault facility (open access)

Hazard evaluation for 244-AR vault facility

This document presents the results of a hazard identification and evaluation performed on the 244-AR Vault Facility to close a USQ (USQ No.TF-98-0785, Potential Inadequacy in Authorization Basis (PIAB): To Evaluate Miscellaneous Facilities Listed In HNF-2503 And Not Addressed In The TWRS Authorization Basis) that was generated as part of an evaluation of inactive TWRS facilities. A hazard evaluation for the Hanford Site 244-AR Vault Facility was performed. The process and results of the hazard evaluation are provided in this document. A previous hazard evaluation was performed for the 244-AR Vault Facility in 1996 in support of the Basis for Interim Operation (BIO) (HNF-SD-WM-BIO-001, 1998, Revision 1) of the Tank Waste Remediation System (TWRS). The results of that evaluation are provided in the BIO. Upon review of those results it was determined that hazardous conditions that could lead to the release of radiological and toxicological material from the 244-AR vaults due to flooding was not addressed in the original hazards evaluation. This supplemental hazard evaluation addresses this oversight of the original hazard evaluation. The results of the hazard evaluation were compared to the current TWRS BIO to identify any hazardous conditions where Authorization Basis (AB) controls may not be sufficient …
Date: August 25, 1999
Creator: Braun, D. J.
System: The UNT Digital Library
Project W-519 TWRS privatization phase 1 infrastructure year 2000 compliance assessment project plan (open access)

Project W-519 TWRS privatization phase 1 infrastructure year 2000 compliance assessment project plan

This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-519, Tank Waste Remediation System Privatization Phase I Infrastructure Support. The purpose of this assessment is to give an overview of the project. This assessment will describe the methods, protocols, and practices to assure that equipment and systems do not have Y2K problems. This document will not be updated and any dates contained in this document are estimates and may change. The scope of project W-519 is to provide utilities and infrastructure to support construction and operation of the private contractor's facility to treat, immobilize, and dispose of tank waste. The private contractor's facility will be located on east side of 200E-area and north of Route 4s (near the defunct grout vaults). The utilities include potable and process water, construction and operational electrical power systems, and liquid effluent disposal transfer lines to the existing effluent treatment facility (ETF) and the liquid effluent retention facility (LERF).
Date: August 25, 1999
Creator: BUSSELL, J.H.
System: The UNT Digital Library
241-AN-B valve pit manifold valves and position indication acceptance test procedure (open access)

241-AN-B valve pit manifold valves and position indication acceptance test procedure

This document describes the method used to test design criteria for gear actuated ball valves installed in 241-AN-B Valve Pit located at 200E Tank Farms. The purpose of this procedure is to demonstrate the following: Equipment is properly installed, labeled, and documented on As-Built drawings; New Manifold Valves in the 241-AN-B Valve Pit are fully operable using the handwheel of the valve operators; New valve position indicators on the valve operators will show correct valve positions; New valve position switches will function properly; and New valve locking devices function properly.
Date: August 25, 1999
Creator: VANDYKE, D.W.
System: The UNT Digital Library
Letter Report (ETN-98-0005) S-farm Overground Transfer (OGT) Line Design Comparison and BIO Evaluation (open access)

Letter Report (ETN-98-0005) S-farm Overground Transfer (OGT) Line Design Comparison and BIO Evaluation

This document provides an evaluation of the detailed design for the 2414 Overground Transfer (OGT) line between S-Farm valve pits 241-S-B and 2414-0. The evaluation compares the design calculations to the design features, the important assumptions, and the required controls for TWRS BIO representative accident scenarios.
Date: August 25, 1999
Creator: HICKS, D.F.
System: The UNT Digital Library
Project Management Plan to Maintain Safe and Compliant Conditions at the Plutonium Finishing Plant (PFP) (open access)

Project Management Plan to Maintain Safe and Compliant Conditions at the Plutonium Finishing Plant (PFP)

This Project Management Plan presents the overall plan, description, mission, and workscope for the Plutonium Finishing Plant (PFP) maintain safe and compliant conditions project at PFP.
Date: October 25, 1999
Creator: COX, G.J.
System: The UNT Digital Library
Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan (open access)

Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems.
Date: August 25, 1999
Creator: BUSSELL, J.H.
System: The UNT Digital Library
Project W-314 Specific Test and Evaluation Plan 241-AN-B Valve Pit (open access)

Project W-314 Specific Test and Evaluation Plan 241-AN-B Valve Pit

This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities performed on the 241-AN-B Valve Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).
Date: August 25, 1999
Creator: HAMMERS, J.S.
System: The UNT Digital Library
Functional design criteria for pumping and instrumentation control (PIC) skids (open access)

Functional design criteria for pumping and instrumentation control (PIC) skids

Radioactive liquid and semisolid waste from operation of Hanford's nuclear fuel processing plants is stored in 177 underground storage tanks located in the 200 Areas of the Hanford site. 28 of these tanks are of double-shell construction. The remaining 149 tanks are of single-shell construction. Only the newer, double-shell tanks (DST) can meet current requirements for containment of dangerous waste. Therefore, the single-shell tanks (SST) are being ''interim stabilized,'' which is the process of removing liquid from the waste through the use of a jet pump installed in a saltwell which penetrates the waste. Lockheed Martin Hanford Company has decided to purchase additional Pumping and Instrumentation Control (PIC) skids to monitor and control the operation of saltwell jet pumps in SSTs. Similar PIC skids are already in use at several locations. The PIC skids will shut off all power to equipment/instruments if preset limits are exceeded for such conditions as flammable gas, leak detection, pressure and flow, as well as provide air and water necessary for saltwell pumping activities. This document outlines the functional design criteria for pumping and instrumentation control (PIC) skids to support the interim stabilization effort for saltwell pumping.
Date: August 25, 1999
Creator: Boettger, J. S.
System: The UNT Digital Library
SN-268 encasement leak detection ANA-WT-LDSTA-335 acceptance test procedure (open access)

SN-268 encasement leak detection ANA-WT-LDSTA-335 acceptance test procedure

This document describes the method used to test design criteria for encasement leak detector system installed in 241-AN-A Encasement Line SN-268, located at 200E Tank Farms. This procedure provides instructions for demonstrating that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.
Date: August 25, 1999
Creator: VANDYKE, D.W.
System: The UNT Digital Library
Test Plan for Measuring Ventilation Rates and Combustible Gas Levels in TWRS Active Catch Tanks (open access)

Test Plan for Measuring Ventilation Rates and Combustible Gas Levels in TWRS Active Catch Tanks

The purpose of this sampling activity is to obtain data to support an initial evaluation of potential hazards due to the presence of combustible gas in catch tanks that are currently operated by the River Protection Project (RPP). Results of the hazard analysis will be used to support closure of the flammable gas unreviewed safety question for these facilities. The data collection will be conducted in accordance with the Tank Safety Screening Data Quality Objective (Dukelow et al. 1995). Combustible gas, ammonia, and organic vapor levels in the headspace of the catch tanks will be field-measured using hand-held instruments. If a combustible gas level measurement in a tank exceeds an established threshold, gas samples will he collected in SUMMA' canisters for more extensive laboratory analysis. In addition, ventilation rates of some catch tanks will be measured to evaluate removal of flammable gas by air flowing through the tanks. This test plan identifies the sample collection, laboratory analysis, quality assurance, and reporting objectives for this data collection effort. The plan also provides the procedures for field measurement of combustible gas concentrations and ventilation rates.
Date: October 25, 1999
Creator: NGUYEN, D.M.
System: The UNT Digital Library
Acceptance test procedure for removal of CS1K circuit switcher block and trip schemes (open access)

Acceptance test procedure for removal of CS1K circuit switcher block and trip schemes

This supporting document provides a detailed process to test the functions of the circuit switcher, protective relays, alarms, SCADA and 125VDC control logic of 115kV and 13.8kV systems at B3S4 substation following the removal of trip and blocking schemes to Transformer No.1 Circuit Switcher B594.
Date: August 25, 1999
Creator: HACHE, J.M.
System: The UNT Digital Library
241-AN-A valve pit manifold valves and position indication acceptance test procedure (open access)

241-AN-A valve pit manifold valves and position indication acceptance test procedure

This document describes the method used to test design criteria for gear actuated ball valves installed in 241-AN-A Valve Pit located at 200E Tank Farms. The purpose of this procedure is to demonstrate the following: Equipment is properly installed, labeled, and documented on As-Built drawings; New Manifold Valves in the 241-AN-A Valve Pit are fully operable using the handwheel of the valve operators; New valve position indicators on the valve operators will show correct valve positions; New valve position switches will function properly; and New valve locking devices function properly.
Date: August 25, 1999
Creator: VANDYKE, D.W.
System: The UNT Digital Library
Tank 241-U-103, grab samples 3U-99-1, 3u-99-2 and 3U-99-3 (open access)

Tank 241-U-103, grab samples 3U-99-1, 3u-99-2 and 3U-99-3

This document is the final report for tank 241-U-103 grab samples. Three grab samples were collected from riser 13 on March 12, 1999 and received by the 222-S laboratory on March 15, 1999. Analyses were performed in accordance with the Compatibility Grab Sampling and Analysis Plan for Fiscal year 1999 (TSAP) and the Data Quality Objectives for Tank Farms Waste Compatibility Program (DQO). The analytical results are presented in the data summary report. None of the subsamples submitted for differential scanning calorimetry (DSC), total organic carbon (TOC) and plutonium 239 (Pu239) analyses exceeded the notification limits as stated in TSAP.
Date: August 25, 1999
Creator: Steen, F. H.
System: The UNT Digital Library
Project W-314 Specific Test and Evaluation Plan 241-AN-A Valve Pit (open access)

Project W-314 Specific Test and Evaluation Plan 241-AN-A Valve Pit

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).
Date: August 25, 1999
Creator: HAMMERS, J.S.
System: The UNT Digital Library
Engineering Study of 500 ML Sample Bottle Transportation Methods (open access)

Engineering Study of 500 ML Sample Bottle Transportation Methods

This engineering study reviews and evaluates all available methods for transportation of 500-mL grab sample bottles, reviews and evaluates transportation requirements and schedules and analyzes and recommends the most cost-effective method for transporting 500-mL grab sample bottles.
Date: August 25, 1999
Creator: Boger, R. M.
System: The UNT Digital Library
Tank Monitor and Control System (TMACS) Rev 11.0 Acceptance Test Review (open access)

Tank Monitor and Control System (TMACS) Rev 11.0 Acceptance Test Review

The purpose of this document is to describe tests performed to validate Revision 11 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.
Date: August 25, 1999
Creator: HOLM, M.J.
System: The UNT Digital Library
241-AN-B pit leak detection ANA-WT-LDSTA-231 acceptance test procedure (open access)

241-AN-B pit leak detection ANA-WT-LDSTA-231 acceptance test procedure

This document describes the method used to test design criteria for Safety Class, Intrinsically Safe leak detector system installed in 241-AN-B Valve Pit located at 200E Tank Farms. The purpose of this Procedure is to demonstrate that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.
Date: August 25, 1999
Creator: VANDYKE, D.W.
System: The UNT Digital Library
Functions and Requirements for Automated Liquid Level Gauge Instruments in SST and DST Farms (open access)

Functions and Requirements for Automated Liquid Level Gauge Instruments in SST and DST Farms

This functions and requirements document defines the baseline requirements and criteria for the design, purchase, fabrication, construction, installation, and operation of automated liquid level gauge instruments in the Tank Farms. This document is intended to become the technical baseline for current and future installation, operation and maintenance of automated liquid level gauges in single-shell and double-shell tank farms.
Date: August 25, 1999
Creator: CARPENTER, K.E.
System: The UNT Digital Library
Saltwell pumping systems R.A.M. analysis (open access)

Saltwell pumping systems R.A.M. analysis

This study characterizes the reliability, availability, and maintainability of saltwell pumping systems based on historical data, and identifies recommendations to improve operating efficiency. The report was initially issued as a letter report on September 9, 1999, reference no. NHC-9956343. The text is reproduced here with minor edits and without the appendices.
Date: October 25, 1999
Creator: DEFORD, D.K.
System: The UNT Digital Library
System Design Description for the SY-101 Hydrogen Mitigation Test Project Data Acquisition and Control System (DACS-1) (open access)

System Design Description for the SY-101 Hydrogen Mitigation Test Project Data Acquisition and Control System (DACS-1)

This document describes the hardware and software of the computer subsystems for the Data Acquisition and Control System (DACS) used in mitigation tests conducted on waste tank 241-SY-101 at the Hanford Nuclear Reservation, The original system was designed and implemented by LANL, supplied to WHC, and turned over to LMHC for operation. In 1999, the hardware and software were upgraded to provide a state-of-the-art, Year-2000 compliant system.
Date: August 25, 1999
Creator: ERMI, A.M.
System: The UNT Digital Library
Engineering study of riser equipment contamination (open access)

Engineering study of riser equipment contamination

This Engineering Study was to evaluate the current equipment and operating procedures to determine if changes could be made to improve ALARA and evaluate the feasibility of implementing the proposed solutions. As part of this study input from the cognizant characterization engineers and operating sampling crews was obtained and evaluated for ALARA improvements.
Date: August 25, 1999
Creator: Boger, R. M.
System: The UNT Digital Library
On the Relationship Between Microstructure and Electrical and Hydraulic Properties of Sand-Clay Mixtures (open access)

On the Relationship Between Microstructure and Electrical and Hydraulic Properties of Sand-Clay Mixtures

A series of laboratory experiments were performed on saturated sand-clay mixtures, including electrical properties, permeability and porosity. Different mixtures and configurations of quartz sand and 0 to 10% Na-montmorillonite clay saturated with solutions of CaCl{sub 2} and deionized water were investigated. The electrical properties were dependent on clay content, fluid conductivity, and microstructure in a complex fashion. Two main regions of conduction exist: a region dominated by surface conduction and a region where the ionic strength of the saturating fluid controlled conduction. For low fluid conductivities, the sample geometry was found to greatly affect the magnitude of the surface conductance. The influence of the microstructural properties on the electrical properties was quantified by estimating formation factors, {Lambda}-parameters, and surface conductances. We suggest that high and low bounds on the expected surface and bulk conductance of natural systems can be derived from the measurements on these artificial configurations.
Date: October 25, 1999
Creator: Wildenschild, D.; Roberts, J. J. & Carlsberg, E. D.
System: The UNT Digital Library