Federal Research and Development Funding: FY2007 (open access)

Federal Research and Development Funding: FY2007

None
Date: January 25, 2007
Creator: Davey, Michael E.; Matthews, Christine M.; Moteff, John D.; Morgan, Daniel; Schacht, Wendy H.; Smith, Pamela W. et al.
Object Type: Report
System: The UNT Digital Library
Summary of the Rhic Performance During the fy07 Heavy Ion Run (open access)

Summary of the Rhic Performance During the fy07 Heavy Ion Run

After the last successful RHIC Au-Au run in 2004 (Run-4), RHIC experiments now require significantly enhanced luminosity to study very rare events in heavy ion collisions. RHIC has demonstrated its capability to operate routinely above its design average luminosity per store of 2x10{sup 25}cm{sup -2}s{sup -1}. In Run-4 we already achieved 2.5 times the design luminosity in RHIC. This luminosity was achieved with only 40% of the total possible number of bunches filled, and with $'* = 1 m. However, the goal is to reach 4 times the design luminosity, an average of 8x 1 by reducing the P* value and increasing the number of bunches to the accelerator maximum of Figure 1 : Integrated delivered luminosity for the four IRs with 11 1. In addition, the average time at store was expected to the minimum and maximum predictions up to June 18,2007. be increased by a factor of 1.1 to about 60% of calendar time. We present an overview of the changes that increased the instantaneous luminosity, luminosity lifetime and integrated luminosity of RHIC Au-Au operations during Run-7 even though the goal of 60% time at store could not be reached.
Date: June 25, 2007
Creator: Drees, A.; Ahrens, L.; Alessi, J.; Bai, M.; Barton, D. & Al., Et
Object Type: Article
System: The UNT Digital Library