Review of the stack discharge active particle contamination problem (open access)

Review of the stack discharge active particle contamination problem

Quantities of the order of ten million to 100 million radioactive particles per month were emitted from the stacks over a period of several months. High activity in the range 0.1 to 3..mu..c was probably confined to large carrier particles of corrosion debris from iron ductwork in the separations plant ventilation air system. This report discusses chemical, physical and radiochemical properties of the particles, and possible biological and health effects of exposure to them. (ACR)
Date: March 22, 1948
Creator: Parker, H M
System: The UNT Digital Library
Recovery of Materials (open access)

Recovery of Materials

None
Date: September 22, 1948
Creator: Leverett, Miles
System: The UNT Digital Library
234-5 Project specification letter 234-41, 235-41 (Supplement D), Chemical Development Laboratory (open access)

234-5 Project specification letter 234-41, 235-41 (Supplement D), Chemical Development Laboratory

This letter itemizes the miscellaneous equipment and supplies not previously specified which should be ordered to equip the 234-5 Chemical Development Laboratory. Equipment currently carried in store stock is not included in this list. The vendor is given only to identify the item or as a suggested source of supply.
Date: October 22, 1948
Creator: Work, J.B.
System: The UNT Digital Library
The Varieties, Quantities, and Purities of Stable Isotopes Which Have Been Concentrated Electromagnetically (open access)

The Varieties, Quantities, and Purities of Stable Isotopes Which Have Been Concentrated Electromagnetically

None
Date: March 22, 1948
Creator: Keim, C.P.
System: The UNT Digital Library
Neutron Diffraction Studies (open access)

Neutron Diffraction Studies

None
Date: October 22, 1948
Creator: Shull, C. G.; Wollan, E. O. & Marney, M. C.
System: The UNT Digital Library
Project C-187-D design requirements for redox production plants (open access)

Project C-187-D design requirements for redox production plants

The following outline of the requirements for the Redox Production Plant design is transmitted to the Kellex Corporation by the General Electric Company to be used in carrying out the assignment directed by Work Authority C-187-C. This outline briefly describes the critical features of design and emphasizes the General Electric desires for certain types of process and engineering design. The purpose of this transmittal is to outline the minimum requirements as to process flow sheet and design criteria to initiate the carrying out of this assignment by Kellex Corporation. This document was originally produced on May 22, 1948 and was declassified on July 28, 1994.
Date: May 22, 1948
Creator: Beaton, R. H.
System: The UNT Digital Library
Time requirements for current discharge operations (open access)

Time requirements for current discharge operations

In order to evaluate the feasibility of segmental discharge equipment, it was necessary to determine the time required for segmental discharge during the current operating procedures. This memorandum details this time study.
Date: April 22, 1948
Creator: Cabell, C. P.
System: The UNT Digital Library