D0 Silicon Upgrade: Estimates of the Deflections and Stresses of the Toshiba Cold Mass Support System (open access)

D0 Silicon Upgrade: Estimates of the Deflections and Stresses of the Toshiba Cold Mass Support System

Tensile stresses in the Toshiba cold mass support links generated by the loadings the coil is subject to, and the deflections the coil experiences as a result of these loadings, are estimated. The axial links are conservatively designed and it should be reasonably easy to ensure that the three links at each end of the coil carry approximately equal loads. Small deviations from this ideal should not have great consequence as a system-of-three is somewhat forgiving in this regard. The use of preload makes the north operating deflection equal to the smaller south operating deflection, possibly a convenience when the nozzle design is contemplated. Toshiba has indicated they will establish the desired preload using strain gauges near the warm ends of the links.
Date: November 22, 1995
Creator: Smith, R. P.
System: The UNT Digital Library
Pressurized drift tubes scintillating fiber hadron calorimetry. Final report (open access)

Pressurized drift tubes scintillating fiber hadron calorimetry. Final report

Under this contract members of the MSU high energy physics group constructed a full-scale Pressurized Drift Tube Chamber intended for the GEM muon system at the SSC. They achieved a position resolution of <90 {mu} over the full 5 m{sup 2} area of the detector. This resolution satisfied the GEM resolution requirements of <100 {mu} by a comfortable margin. Based on their SSC work they developed a new technique for creating wire supports in drift tubes with an overall placement accuracy of <20 {mu}. This technique requires only simple jigging and can be duplicated and operated at low cost. Also, they participated in the design and testing of a hadron calorimeter prototype for GEM. This work lead the authors to develop a semi-automatic welding machine to fuse together two plastic optical fibers. Copies of this machine are currently in use in the CDF endplug upgrade at Fermilab and additional copies are used widely in calorimeter and fiber-tracker construction.
Date: March 22, 1995
Creator: Bromberg, C.; Huston, J. & Miller, R.
System: The UNT Digital Library
Cost benefit and risk assessment for selected tank waste process testing alternatives (open access)

Cost benefit and risk assessment for selected tank waste process testing alternatives

The US Department of Energy has established the Tank Waste Remediation System (TWRS) program to safely manage wastes currently stored in underground tank at the Hanford Site. A TWRS testing and development strategy was recently developed to define long-range TWRS testing plans. The testing and development strategy considered four alternatives. The primary variable in the alternatives is the level of pilot-scale testing involving actual waste. This study evaluates the cost benefit and risks associated with the four alternatives. Four types of risk were evaluated: programmatic schedule risk, process mishap risk, worker risk, and public health risk. The structure of this report is as follows: Section 1 introduces the report subject; Section 2 describes the test strategy alternative evaluation; Section 3 describes the approach used in this study to assess risk and cost benefit; Section 4 describes the assessment methodologies for costs and risks; Section 5 describes the bases and assumptions used to estimate the costs and risks; Section 6 presents the detailed costs and risks; and Section 7 describes the results of the cost benefit analysis and presents conclusions.
Date: May 22, 1995
Creator: Gasper, K. A.
System: The UNT Digital Library
45-Day safety screen results and final report for Tank 241-SX-113, Auger samples 94-AUG-028 and 95-AUG-029 (open access)

45-Day safety screen results and final report for Tank 241-SX-113, Auger samples 94-AUG-028 and 95-AUG-029

This document serves as the 45-day report deliverable for tank 241-SX-113 auger samples collected on May 9 and 10, 1995. The samples were extruded, and analyzed by the 222-S Laboratory. Laboratory procedures completed include: differential scanning calorimetry; thermogravimetric analysis; and total alpha analysis. This report incudes the primary safety screening results obtained from the analyses. As the final report, the following are also included: chains of custody; the extrusion logbook; sample preparation data; and total alpha analysis raw data.
Date: June 22, 1995
Creator: Sasaki, L.M.
System: The UNT Digital Library
Biomass fuel from woody crops for electric power generation (open access)

Biomass fuel from woody crops for electric power generation

This report discusses the biologic, environmental, economic, and operational issues associated with growing wood crops in managed plantations. Information on plantation productivity, environmental issues and impacts, and costs is drawn from DOE`s Biofuels Feedstock Development as well as commercial operations in the US and elsewhere. The particular experiences of three countries--Brazil, the Philippines, and Hawaii (US)--are discussed in considerable detail.
Date: June 22, 1995
Creator: Perlack, R.D.; Wright, L.L.; Huston, M.A. & Schramm, W.E.
System: The UNT Digital Library
Proposed Site Treatment Plan (PSTP). STP reference document (open access)

Proposed Site Treatment Plan (PSTP). STP reference document

The Department of Energy (DOE) is required by Section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (FFCAct), to prepare a plan describing the development of treatment capacities and technologies for treating mixed waste (hazardous/radioactive waste). DOE decided to prepare its site treatment plan in a three phased approach. The first phase, called the Conceptual Site Treatment Plan (CSTP), was issued in October 1993. At the Savannah River Site (SRS) the CSTP described mixed waste streams generated at SRS and listed treatment scenarios for each waste stream utilizing an onsite, offsite DOE, and offsite or onsite commercial or vendor treatment option. The CSTP is followed by the Draft Site Treatment Plan (DSTP), due to be issued in August 1994. The DSTP, the current activity., will narrow the options discussed in the CSTP to a preferred treatment option, if possible, and will include waste streams proposed to be shipped to SRS from other DOE facilities as well as waste streams SRS may send offsite for treatment. The SRS DSTP process has been designed to address treatment options for each of the site`s mixed waste streams. The SRS Proposed Site Treatment Plan (PSTP) …
Date: February 22, 1995
Creator: unknown
System: The UNT Digital Library
Preliminary design report of a relativistic-Klystron two-beam-accelerator based power source for a 1 TeV center-of-mass next linear collider (open access)

Preliminary design report of a relativistic-Klystron two-beam-accelerator based power source for a 1 TeV center-of-mass next linear collider

A preliminary point design for an 11.4 GHz power source for a 1 TeV center-of-mass Next Linear Collider (NLC) based on the Relativistic-Klystron Two-Beam-Accelerator (RK-TBA) concept is presented. The present report is the result of a joint LBL-LLNL systems study. consisting of three major thrust areas: physics, engineering, and costing. The new RK-TBA point design, together with our findings in each of these areas, are reported.
Date: February 22, 1995
Creator: Yu, S.; Goffeney, N. & Henestroza, E.
System: The UNT Digital Library
K-Basins S/RIDS (open access)

K-Basins S/RIDS

The Standards/Requirements Identification Document(S/RID) is a list of the Environmental, Safety, and Health (ES&H) and Safeguards and Security (SAS) standards/requirements applicable to the K Basins facility
Date: September 22, 1995
Creator: Watson, D. J.
System: The UNT Digital Library
[Task 1.] Biodenitrification of low nitrate solar pond waters using sequencing batch reactors. [Task 2.] Solidification/stabilization of high strength and biodenitrified heavy metal sludges with a Portland cement/flyash system (open access)

[Task 1.] Biodenitrification of low nitrate solar pond waters using sequencing batch reactors. [Task 2.] Solidification/stabilization of high strength and biodenitrified heavy metal sludges with a Portland cement/flyash system

Process wastewater and sludges were accumulated on site in solar evaporation ponds during operations at the Department of Energy's Rocky Flats Plant (DOE/RF). Because of the extensive use of nitric acid in the processing of actinide metals, the process wastewater has high concentrations of nitrate. Solar pond waters at DOE/RF contain 300-60,000 mg NO{sub 3}{sup {minus}}/L. Additionally, the pond waters contain varying concentrations of many other aqueous constituents, including heavy metals, alkali salts, carbonates, and low level radioactivity. Solids, both from chemical precipitation and soil material deposition, are also present. Options for ultimate disposal of the pond waters are currently being evaluated and include stabilization and solidification (S/S) by cementation. Removal of nitrates can enhance a wastes amenability to S/S, or can be a unit operation in another treatment scheme. Nitrate removal is also a concern for other sources of pollution at DOE/RF, including contaminated groundwater collected by interceptor trench systems. Finally, nitrate pollution is a problem at many other DOE facilities where actinide metals were processed. The primary objective of this investigation was to optimize biological denitrification of solar pond waters with nitrate concentrations of 300--2,100 mg NO{sub 3}{sup {minus}}/L to below the drinking water standard of 45 mg …
Date: September 22, 1995
Creator: Figueroa, Linda; Cook, Nevis E.; Siegrist, Robert L.; Mosher, John; Terry, Seth & Canonico, S.
System: The UNT Digital Library
Budget for FY1996: Congressional Budget Resolutions (open access)

Budget for FY1996: Congressional Budget Resolutions

This report provides Congressional Budget Resolutions related to Budget for FY1996.
Date: June 22, 1995
Creator: Winters, Philip
System: The UNT Digital Library
TPX: Contractor preliminary design review. Volume 1, Presentation and design description. Final report (open access)

TPX: Contractor preliminary design review. Volume 1, Presentation and design description. Final report

This first volume of the five volume set begins with a CPDR overview and then details the PF magnet system, manufacturing R&D, Westinghouse R&D, the central solenoid, the PF 5 ring coil, the PF 6/7 ring coil, quality assurance, and the system design description.
Date: September 22, 1995
Creator: Hartman, D.; Naumovich, G.; Walstrom, P.; Clarkson, I.; Schultheiss, J. & Burger, A.
System: The UNT Digital Library
Energy Deposition Downstream of the Internal Dump (open access)

Energy Deposition Downstream of the Internal Dump

None
Date: December 22, 1995
Creator: J., Stevens A.
System: The UNT Digital Library
Improved Calibration Facility (open access)

Improved Calibration Facility

Aid in redesign of the calibration facility in order to: 1. Reduce the rate of exposure for calibration personnel below 1 mr/hr; 2. Reduce the rate of exposure outside of the 3745 Building; 3. Reduce the risk of breaking radium sources; 4. Improve the efficiency of calibration procedures by: a. Allowing calibration to be done faster; b. Providing several calibration ranges which can operate simultaneously in the present space allowed; c. Allowing instrument survey work to proceed while calibration work is done. A well-type calibration installation is proposed and a brief description of the required shielding is included.
Date: August 22, 1995
Creator: Roesch, W. C.
System: The UNT Digital Library
Crossings in alternating-parity bands of neutron-rich Ba nuclei (open access)

Crossings in alternating-parity bands of neutron-rich Ba nuclei

{sup 144}Ba and {sup 146}Ba nuclei produced in the spontaneous fission of {sup 248}Cm have been studied using the EUROGRAM II array. Spins and parities of excited levels have been deduced from triple-{gamma} angular correlation and direction-polarization correlation measurements, which is the first use of these techniques in studies of fission product nuclei. Ground-state, alternating-parity bands have been extended significantly and crossing in these bands has been found in both isotopes. For the first time alternating-parity band termination by particle alignment has been observed.
Date: July 22, 1995
Creator: Urban, W.; Jones, M.A. & Durell, J.L.
System: The UNT Digital Library
Interface agreement for the management of 308 Building Spent Nuclear Fuel. Revision 1 (open access)

Interface agreement for the management of 308 Building Spent Nuclear Fuel. Revision 1

The Hanford Site Spent Nuclear Fuel (SNF) Project was formed to manage the SNF at Hanford. Specifically, the mission of the SNF Project on the Hanford Site is to ``provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it for final disposition.`` The current mission of the Fuel Fabrication Facilities Transition Project (FFFTP) is to transition the 308 Building for turn over to the Environmental Restoration Contractor for decontamination and decommissioning.
Date: December 22, 1995
Creator: Danko, A.D.
System: The UNT Digital Library
Project W320 52-inch diameter equipment container load test: Test report (open access)

Project W320 52-inch diameter equipment container load test: Test report

This test report summarizes testing activities and documents the results of the load tests performed on-site and off-site to structural qualify the 52-inch equipment containers designed and fabricated under Project W-320.
Date: February 22, 1995
Creator: Bellomy, J.R.
System: The UNT Digital Library
Tank Monitor and Control System sensor Acceptance Test Procedure (open access)

Tank Monitor and Control System sensor Acceptance Test Procedure

This Acceptance Test Procedure is to verify the correct reading of points connected to the Tank Monitor and Control System (TMACS).
Date: September 22, 1995
Creator: Scaief, C. C., III
System: The UNT Digital Library
Tokamak Physics EXperiment (TPX): Toroidal field magnet design, development and manufacture. SDRL 15, System design description. Volume 1 (open access)

Tokamak Physics EXperiment (TPX): Toroidal field magnet design, development and manufacture. SDRL 15, System design description. Volume 1

This System Design Description, prepared in accordance with the TPX Project Management Plan provides a summary or TF Magnet System design features at the conclusion of Phase I, Preliminary Design and Manufacturing Research. The document includes the analytical and experimental bases for the design, and plans for implementation in final design, manufacturing, test, and magnet integration into the tokamak. Requirements for operation and maintenance are outlined, and references to sources of additional information are provided.
Date: September 22, 1995
Creator: unknown
System: The UNT Digital Library
Vapor and gas sampling of single-shell tank 241-SX-103 using the vapor sampling system (open access)

Vapor and gas sampling of single-shell tank 241-SX-103 using the vapor sampling system

This document presents sampling data resulting from the March 23, 1995, sampling of SST 241-SX-103 using the vapor sampling system.
Date: September 22, 1995
Creator: Caprio, G. S.
System: The UNT Digital Library
Quality Assurance Program Plan for Project W-379: Spent Nuclear Fuels Canister Storage Building Projec (open access)

Quality Assurance Program Plan for Project W-379: Spent Nuclear Fuels Canister Storage Building Projec

This document describes the Quality Assurance Program Plan (QAPP) for the Spent Nuclear Fuels (SNF) Canister Storage Building (CSB) Project. The purpose of this QAPP is to control project activities ensuring achievement of the project mission in a safe, consistent and reliable manner.
Date: September 22, 1995
Creator: Duncan, D.W.
System: The UNT Digital Library
Radiological consequences of a postulated drop of a maximally Lloaded FFTF fuel cask (open access)

Radiological consequences of a postulated drop of a maximally Lloaded FFTF fuel cask

Onsite and site boundary radiological consequences were estimated for a postulated accidental drop of an Interim Storage Cask (ISC) loaded 7 assemblies at the maximum available burnup. The postulated cask drop was assumed to occur from the maximum physically attainable height during crane movement of the cask. The resulting onsite and site boundary doses of 45 mSv and 0.04 mSv are far below the corresponding 1 Sv and 250 mSv risk guidelines for highly unlikely accidents
Date: September 22, 1995
Creator: Scott, P.A.
System: The UNT Digital Library
Prediction of pure water stress corrosion cracking (PWSCC) in nickel base alloys using crack growth rate models (open access)

Prediction of pure water stress corrosion cracking (PWSCC) in nickel base alloys using crack growth rate models

The Ford/Andresen slip dissolution SCC model, originally developed for stainless steel components in BWR environments, has been applied to Alloy 600 and Alloy X-750 tested in deaerated pure water chemistry. A method is described whereby the crack growth rates measured in compact tension specimens can be used to estimate crack growth in a component. Good agreement was found between model prediction and measured SCC in X-750 threaded fasteners over a wide range of temperatures, stresses, and material condition. Most data support the basic assumption of this model that cracks initiate early in life. The evidence supporting a particular SCC mechanism is mixed. Electrochemical repassivation data and estimates of oxide fracture strain indicate that the slip dissolution model can account for the observed crack growth rates, provided primary rather than secondary creep rates are used. However, approximately 100 cross-sectional TEM foils of SCC cracks including crack tips reveal no evidence of enhanced plasticity or unique dislocation patterns at the crack tip or along the crack to support a classic slip dissolution mechanism. No voids, hydrides, or microcracks are found in the vicinity of the crack tips creating doubt about classic hydrogen related mechanisms. The bulk oxide films exhibit a surface oxide …
Date: February 22, 1995
Creator: Thompson, C. D.; Krasodomski, H. T.; Lewis, N. & Makar, G. L.
System: The UNT Digital Library
Test specification for decant pump and winch assembly. Revision 2 (open access)

Test specification for decant pump and winch assembly. Revision 2

This specification provides the requirements for testing of the vertical turbine decant pump including the floating suction with load sensing winch control, instrumentation and the associated PLC/PC control system. All assembly necessary for testing including piping, temporary wiring, etc., shall be performed by the Seller. All referenced figures are at the back of this document. The testing consists of performance testing, winch testing and calibration, instrumentation verification testing and run-in testing of the pump. Testing shall be done in the presence and under the direction of the Buyer in accordance with this procedure.
Date: February 22, 1995
Creator: Staehr, T.W.
System: The UNT Digital Library
Tank 241-TY-106 Tank Characterization Plan (open access)

Tank 241-TY-106 Tank Characterization Plan

This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, and WHC 222-S Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples for tank 241-TY-106.
Date: February 22, 1995
Creator: Schreiber, R. D.
System: The UNT Digital Library