100 Areas technical activities report: Engineering, August 1947 (open access)

100 Areas technical activities report: Engineering, August 1947

There were seven charges of metal inspected during the month for corrosion and blistering studies. There were no unusual cases of blistering noted and the corrosion rates were normal for this time of year. Borescopic examination of the graphite packing around the ``B`` Hole in the F Pile revealed that the graphite is no more severely cracked than in the D Pile when it was inspected about a year ago. Examination of the graphite at the downstream and of Tube 1385-D did not indicate that any damage had been done by the leak in that tube. Forty one tubes have been charged in the F Pile on Production Test 105-90-P, ``Exposure of TX Metal Slugs.`` The routine job of taking vertical bowing measurements was turned over to the Instrument Department after working with them once in each Area. Installation of Van Stone test units was completed and a brief run was started. Van Stone flanges at both ends of 64 process tubes in both the B and F Piles were measured with a micrometer to determine the minimum amount of metal remaining.
Date: September 22, 1947
Creator: Woods, W. K.
System: The UNT Digital Library