{{{title}}} metadc1254105 (open access)

{{{title}}} metadc1254105

The design criteria are written to supply information for the preparation of a project proposal covering budget item B-2265 for Fiscal Year 1956. The function of in-line instrumentation installed shall be the rapid on-the-spot analysis of process variables for quick presentation to process operators for immediate action in process control. Alarm or safety circuits may be incorporated on the equipment.
Date: February 22, 1956
Creator: Hildreth, N. T.
System: The UNT Digital Library
Development of a Welding Process for End Closures on NPR and KER Fuel Element (open access)

Development of a Welding Process for End Closures on NPR and KER Fuel Element

With the development of the zircaloy-2 clad uranium fuel element, it was necessary to develop a method of closing the end of the element after the extruded tubes were cut to the desired length. Regardless of the ultimate design of the closure, a satisfactory zircaloy-2 fusion welding technique had to be worked out. The first fully successful welding was performed with electron beam welding in a vacuum chamber. To make satisfactory welds, the electron beam welding involved time and equipment, plus undue maintenance on the equipment.
Date: February 22, 1960
Creator: Corey, T. B.; DeWitt, D. E. & Nelson, I. V.
System: The UNT Digital Library