A Versatile Spectrometer Magnet Power Supply (open access)

A Versatile Spectrometer Magnet Power Supply

Early results from actual laboratory operation of a more versatile magnet supply.
Date: April 15, 1963
Creator: Groppe, W. A.
System: The UNT Digital Library
Metallurgy Research Operation: Quarterly Progress Report, January - March 1965 (open access)

Metallurgy Research Operation: Quarterly Progress Report, January - March 1965

Quarterly progress report on a project to test the radiation effects on metallurgy.
Date: April 15, 1965
Creator: Cadwell, J. J.; Bierlein, T. K.; Bement, A. L.; Dillon, R. L. & Wheeler, R. G.
System: The UNT Digital Library
Automatic Mass Spectrometer for Isotopic Analysis of Lithium (open access)

Automatic Mass Spectrometer for Isotopic Analysis of Lithium

Report discussing an improvement program on lithium mass spectrometers.
Date: March 15, 1962
Creator: McBryde, W. T. & Gammon, E. F.
System: The UNT Digital Library
Radiolysis of Organic Fluids, Annual Progress Report: October 1, 1961-September 30, 1962 (open access)

Radiolysis of Organic Fluids, Annual Progress Report: October 1, 1961-September 30, 1962

From introduction: This report reviews the Susie program (particularly reactor dosimetry and data analysis) as well as other items that represent a smaller share of the total effort.
Date: January 15, 1963
Creator: Bolt, R. O.; Burrous, M. L.; Carroll, J. G.; Hall, K. L.; Sweeney, M. A. & Tobriner, M. W.
System: The UNT Digital Library
In-Pile Loop Corrosion Experiments with Uranyl Sulfate Solutions at 235 and 250 C (open access)

In-Pile Loop Corrosion Experiments with Uranyl Sulfate Solutions at 235 and 250 C

Report presenting in-pile loop experiments DD, EE, FF, GG, L-412, L-413, and L-418, which were seven of a series designed to test the radiation corrosion of zirconium, titanium, and stainless steel alloys in solutions under various conditions of radiation intensity, temperature, solution composition, and velocity of flow. Steel specimens exposed in the loop cores showed increases in corrosive attack over that expected out-of-radiation.
Date: August 15, 1963
Creator: Jenks, G. H. & Baker, J. E.
System: The UNT Digital Library
Plutonium Recycle Test Reactor Final Safeguard Analysis: Supplement 2, Consequences of a Primary Coolant Leak (open access)

Plutonium Recycle Test Reactor Final Safeguard Analysis: Supplement 2, Consequences of a Primary Coolant Leak

Review of previous work is presented in addition to the results of recent studies concerning loss of primary coolant when the system is cold and pressurized and the problem of supplying adequate cooling following the injection of light water.
Date: November 15, 1960
Creator: Wittenbrock, N. G. & Muraoka, J.
System: The UNT Digital Library
Ultrasonic Resin Level Detector (open access)

Ultrasonic Resin Level Detector

This report describes the development of an ultrasonic instrument for resin level measurements in an ion exchange column.
Date: January 15, 1960
Creator: Hunter, D. O. & Pleasance, C. L.
System: The UNT Digital Library
Specifications for Swaged UO2 19-Rod Cluster, PRTR Fuel Element Mark 1 (open access)

Specifications for Swaged UO2 19-Rod Cluster, PRTR Fuel Element Mark 1

Specifications including detail dimension, materials, fabrication steps, acceptance criteria, and final assembly steps for the swaged uranium dioxide, 19-rod cluster Plutonium Recycle Test Reactor fuel element.
Date: March 15, 1960
Creator: Millhollen, M. K.
System: The UNT Digital Library
Research and Development Activities in the Radiological Sciences, Physical Sciences Portion, January - December 1961 (open access)

Research and Development Activities in the Radiological Sciences, Physical Sciences Portion, January - December 1961

Report regarding ongoing research and development undertaken at Hanfdord Laboratories' physics and instruments laboratory and chemical laboratory.
Date: January 15, 1962
Creator: Junkins, R. L. & Brown, J. E.
System: The UNT Digital Library
Quarterly Progress Report Research and Development Activities Fixation of Radioactive Residues: October - December, 1964 (open access)

Quarterly Progress Report Research and Development Activities Fixation of Radioactive Residues: October - December, 1964

Report presenting research and development activities in the field of radioactive wastes. This particular report is concerned with the fixation of radioactive residues when the failure of a pot liner destroyed the furnace.
Date: April 15, 1965
Creator: Platt, A. M.
System: The UNT Digital Library
Critical Mass Studies of Plutonium Solutions (open access)

Critical Mass Studies of Plutonium Solutions

Chain reacting conditions for plutonium nitrate in water solution have been examined experimentally for a variety of sizes of spheres and cylinders.
Date: February 15, 1960
Creator: Kruesi, F. E.; Erkman, J. O. & Lanning, D. D.
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: July 1 - September 30, 1963 (open access)

Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: July 1 - September 30, 1963

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Date: November 15, 1963
Creator: Aerojet-General Corporation
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: July 1 - December 31, 1959 (open access)

Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: July 1 - December 31, 1959

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Date: February 15, 1960
Creator: Aerojet-General Corporation
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963 (open access)

Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Date: February 15, 1963
Creator: Aerojet-General Corporation
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1964 (open access)

Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1964

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Date: February 15, 1965
Creator: Aerojet-General Corporation
System: The UNT Digital Library