Study of Pu consumption in light water reactors: Evaluation of GE advanced boiling water reactor plants, compilation of Phase 1C task reports (open access)

Study of Pu consumption in light water reactors: Evaluation of GE advanced boiling water reactor plants, compilation of Phase 1C task reports

This report summarizes the evaluations conducted during Phase 1C of the Pu Disposition Study have provided further results which reinforce the conclusions reached during Phase 1A & 1B: These conclusions clearly establish the benefits of the fission option and the use of the ABWR as a reliable, proven, well-defined and cost-effective means available to disposition the weapons Pu. This project could be implemented in the near-term at a cost and on a schedule being validated by reactor plants currently under construction in Japan and by cost and schedule history and validated plans for MOX plants in Europe. Evaluations conducted during this phase have established that (1) the MOX fuel is licensable based on existing criteria for new fuel with limited lead fuel rod testing, (2) that the applicable requirements for transport, handling and repository storage can be met, and (3) that all the applicable safeguards criteria can be met.
Date: January 15, 1994
Creator: unknown
System: The UNT Digital Library
Post waterflood CO{sub 2} miscible flood in light oil, fluvial: Dominated deltaic reservoir. First quarterly technical progress report, Fiscal year 1994, October 1, 1993--December 31, 1993 (open access)

Post waterflood CO{sub 2} miscible flood in light oil, fluvial: Dominated deltaic reservoir. First quarterly technical progress report, Fiscal year 1994, October 1, 1993--December 31, 1993

Production from the Port Neches CO{sub 2} project was initiated on December 6, 1993 after having been shut-in since the start of CO{sub 2} injection on September 22, 1993 to allow reservoir pressure to build. Rates were established at 236 barrels of oil per day (BOPD) from two wells in the 235 acre waterflood project area, which before project initiation had produced only 80 BOPD from the entire area. These wells are flowing large amounts of fluid due to the high reservoir pressure and their oil percentages are increasing as a result of the CO{sub 2} contacting the residual oil. One well, the H. J. Kuhn No. 15-R is flowing 217 BOPD, 1139 BWPD, and 2500 MCFPD of CO{sub 2} at a flowing tubing pressure (FTP) of 890 psi. The other producing well, the H. J. Kuhn No. 33, is currently flowing 19 BOPD, 614 BWPD, and 15 MCFPD at a FTP of 400 psi. Unexpectedly high rates of CO{sub 2} production are being made from Well No. 15-R and from the W. R. Stark ``B`` No. 8. This No. 8 well produced 7 BOPD, 697 BWPD, and 15 MCFPD prior to being shut-in during September to allow for the …
Date: January 15, 1994
Creator: unknown
System: The UNT Digital Library
300-FF-1 Operable Unit physical separation of soils pilot plant study (open access)

300-FF-1 Operable Unit physical separation of soils pilot plant study

Alternative Remedial Technologies, Inc. (ART) was selected in a competitive selection process to conduct a pilot study for the physical separation of soils in the North Process Pond of the 300 Area at the Hanford Site. In January 1994, ART mobilized its 15 tons-per-hour pilot plant to the site. The plant was initially staged in a commercial area to allow for pretest inspections and minor modifications. The plant was specifically designed for use as a physical separations unit and consisted of a feed hopper, wet screens, hydrocyclones, as well as settling and dewatering equipment. The plant was supported in the field with prescreening equipment, mobile generators, air compressors, and water storage tanks. The plant was moved into the surface contamination area on March 24, 1994. The testing was conducted during the period March 23, 1994 through April 13, 1994. Two soil types were treated during the testing: a natural soil contaminated with low levels of uranium, cesium, cobalt, and heavy metals, and a natural soil contaminated with a uranium carbonate material that was visually recognizable by the presence of a green sludge material in the soil matrix. The ``green`` material contained significantly higher levels of the same contaminants. Both source …
Date: January 15, 1994
Creator: Freeman-Pollard, J. R.
System: The UNT Digital Library
Secondary oil recovery from selected Carter sandstone oilfields -- Black Warrior Basin, Alabama. Quarterly technical progress report, September 1--November 30, 1993 (open access)

Secondary oil recovery from selected Carter sandstone oilfields -- Black Warrior Basin, Alabama. Quarterly technical progress report, September 1--November 30, 1993

Anderman/Smith Operating Co. is operating a secondary oil recovery project involving the Carter sandstone in northwest Alabama. The project objectives are: (1) to increase the ultimate economic recovery of oil from the Carter reservoirs, thereby increasing domestic reserves and lessening US dependence on foreign oil; (2) to extensively model, test, and monitor the reservoirs so their management is optimized; and (3) to assimilate and transfer the information and results gathered to other US oil companies to encourage them to attempt similar projects. As a result of waterflood operations at the Central Buff unit, oil production from the Fowler Brasher 7--9 well increased to 40--50 stb/d in late October, and averaged about 45 stb/d in November with no measurable water production. Production at the Fowler Dodson 8--12 was more erratic during the same period. In October, the oil rate for this well increased to nearly 17 stb/d with no reported water production. However, in November the oil production rate declined to about 9 stb/d with an associated average water rate of nearly 17 bpd. Water analysis showed that this produced water was significantly fresher than the connate water produced prior to waterflood operations. This provides evidence for early breakthrough of water …
Date: January 15, 1994
Creator: Anderson, J. C.
System: The UNT Digital Library
Directional dependency of air sampling; Research and development grant {number_sign}4 (open access)

Directional dependency of air sampling; Research and development grant {number_sign}4

A field study was performed by Idaho State University-Environmental Monitoring Laboratory (EML) to examine the directional dependency of low-volume air samplers. A typical continuous low volume air sampler contains a sample head that is mounted on the sampler housing either horizontally through one of four walls or vertically on an exterior wall `looking down or up.` In 1992, a field study was undertaken to estimate sampling error and to detect the directional effect of sampler head orientation. Approximately 1/2 mile downwind from a phosphate plant (continuous source of alpha activity), four samplers were positioned in identical orientation alongside one sampler configured with the sample head `looking down`. At least five consecutive weekly samples were collected. The alpha activity, beta activity, and the Be-7 activity collected on the particulate filter were analyzed to determine sampling error. Four sample heads were than oriented to the four different horizontal directions. Samples were collected for at least five weeks. Analysis of the alpha data can show the effect of sampler orientation to a know near source term. Analysis of the beta and Be-7 activity shows the effect of sampler orientation to a ubiquitous source term.
Date: January 15, 1994
Creator: unknown
System: The UNT Digital Library
Project specific quality assurance plan for Project W-178, 219-S secondary containment (open access)

Project specific quality assurance plan for Project W-178, 219-S secondary containment

The scope of this Quality Assurance Program Plan (QAPP) is to provide a system of Quality Assurance reviews and verifications on the design, procurement and construction of the 219-S Secondary Containment Upgrade. The reviews and verifications will be on activities associated with design, procurement, and construction of the Secondary Containment Upgrade which includes, but is not limited to demolition, removal, new tank installation, tank 103 isolation, tank cell refurbishment, electrical, instrumentation, piping/tubing including supports, pump and valves, and special coatings. The full project scope is defined in the project Functional Design Criteria (FDC), SD-W178-FDC-001, and all activities must be in compliance with this FDC and related design documentation.
Date: January 15, 1994
Creator: Buckles, D. I.
System: The UNT Digital Library
Post waterflood CO2 miscible flood in light oil fluvial - dominated deltaic reservoirs. Technical progress report, October 1, 1994--December 30, 1994. 1st Quarter, fiscal year 1995 (open access)

Post waterflood CO2 miscible flood in light oil fluvial - dominated deltaic reservoirs. Technical progress report, October 1, 1994--December 30, 1994. 1st Quarter, fiscal year 1995

Production is averaging about 450 BOPD for the quarter. The fluctuation was primarily due to a temporary shutdown of CO{sub 2} delivery and maturing of the first WAG cycle. CO{sub 2} and water injection were reversed again in order to optimize changing yields and water cuts in the producing wells. Measured BHP was close to the anticipated value. A limited CO{sub 2} volume of 120 MMCF was injected to stimulate well Kuhn No. 6 to test the Huff-Puff process, since the well did not respond to CO{sub 2} injection from the main reservoir. The well will be placed on February 1, 1995. Total CO{sub 2} injection averaged this quarter about 8.8 MMCFD, including 3.6 MMCFD purchased CO{sub 2} from Cardox. The stratigraphy of the sand deposits is also discussed.
Date: January 15, 1994
Creator: unknown
System: The UNT Digital Library
Additives for high temperature liquid lubricants. Final report (open access)

Additives for high temperature liquid lubricants. Final report

The purpose of this task was to perform research for the Department of Energy (DOE) on the synthesis and characterization of additives for liquid lubricants which could lead to significant improvements in the major tribological task area of friction and wear reduction at high temperature. To this end JPL surveyed candidate precursor compounds which are soluble in liquid lubricants, synthesized the most promising of these materials, characterized them and submitted these additives to National Institute of Standards and Technology (NIST) for evaluation.
Date: January 15, 1994
Creator: Yavrouian, A. H.; Repar, J.; Moran, C. M.; Lawton, E. A. & Anderson, M. S.
System: The UNT Digital Library
Systems and economic analysis of microalgae ponds for conversion of CO{sub 2} to biomass. Quarterly technical progress report, September 1993--December 1993 (open access)

Systems and economic analysis of microalgae ponds for conversion of CO{sub 2} to biomass. Quarterly technical progress report, September 1993--December 1993

This report provides an economic analysis and feasibility study for the utilization by microalgal systems of carbon dioxide generated from coal-fired power plants. The resulting biomass could be a fuel substitute for fossil fuels.
Date: January 15, 1994
Creator: Benemann, J. R. & Oswald, W. J.
System: The UNT Digital Library
Computer virus information update CIAC-2301 (open access)

Computer virus information update CIAC-2301

While CIAC periodically issues bulletins about specific computer viruses, these bulletins do not cover all the computer viruses that affect desktop computers. The purpose of this document is to identify most of the known viruses for the MS-DOS and Macintosh platforms and give an overview of the effects of each virus. The authors also include information on some windows, Atari, and Amiga viruses. This document is revised periodically as new virus information becomes available. This document replaces all earlier versions of the CIAC Computer virus Information Update. The date on the front cover indicates date on which the information in this document was extracted from CIAC`s Virus database.
Date: January 15, 1994
Creator: Orvis, William J.
System: The UNT Digital Library