Reactor Analysis APPR-1 Core II (open access)

Reactor Analysis APPR-1 Core II

Preface; Subsequent to the analysis in the body of this report metallurgical developments indicated that it would not be feasible to build the APPR-1 Core II with the increased boron loading specified herein. At the time of the issuance of this report the Core II boron loading is to be the same as that for Core I. At the time of procurement of the core in the fall, if metallurgical developments warrant, the increased boron loading will be employed. The loading discussed in the body of the report and the first three appendices is that designed to meet the specifications outlined in the introduction. Appendix IV discusses changes in the loading to account for the various methods of employing boron.
Date: July 15, 1958
Creator: Williamson, T. G.; Leibson, M. J. & Bryne, B. J.
System: The UNT Digital Library
Radiochemical Analysis of Crud from the Army Package Power Reactor (open access)

Radiochemical Analysis of Crud from the Army Package Power Reactor

Abstract: A study has been made of the radiochemical composition and the specific activity of insoluble corrosion products (crud) removed from the primary system of the APPR-1. This report presents the results of analysis of twelve crud samples collected during the interval from September 3, 1957 to December 1, 1957. The samples were radiochemically analyzed for long-lived gamma emitting nuclides only. Data are presented on the measured values of the specific activity of crud, the ratios of the nuclide specific activities, and the concentration of crud (crud level) in the circulating primary water. Also included in data, based on the analysis of a single sample, comparing the specific activity of the deposited and circulating corrosion products.
Date: February 15, 1958
Creator: Zegger, J. L.; Small, W. J. & Brown, W. S.
System: The UNT Digital Library