ORR PROJECT PROGRESS REPORT NO. 19 (open access)

ORR PROJECT PROGRESS REPORT NO. 19

None
Date: August 15, 1956
Creator: Gill, J. P. & Cole, T. E.
System: The UNT Digital Library
Development of a nuclear rocket. 5-year-program outline (open access)

Development of a nuclear rocket. 5-year-program outline

None
Date: August 15, 1956
Creator: unknown
System: The UNT Digital Library
FAILURES OF TITANIUM ALLOY TRIM IN HRP DUMP VALVE LOOP (open access)

FAILURES OF TITANIUM ALLOY TRIM IN HRP DUMP VALVE LOOP

None
Date: August 15, 1956
Creator: Hammond, J.P.; Kegley, T.M. Jr. & Adamson, G.M.
System: The UNT Digital Library
Phase III Design Analysis for the Army Package Power Reactor. Volume 1. Design Analysis. Volume 2. Fabrication and Construction Drawings (open access)

Phase III Design Analysis for the Army Package Power Reactor. Volume 1. Design Analysis. Volume 2. Fabrication and Construction Drawings

Analysis of design is given in chapters on: building and grounds, secondary system, primary system, reactor analysis, shielding analysis, instrumentation, water treatment, health physics, and waste disposal, including figures, sketches, and appendices. Reference is made to drawings and diagrams bound in Volume (II), and in available classified and unclassified reports. (M.H.R.)
Date: August 15, 1956
Creator: unknown
System: The UNT Digital Library
An Evaluation of the Zirconium Hazard (open access)

An Evaluation of the Zirconium Hazard

None
Date: August 15, 1956
Creator: DeHollander, W. R.
System: The UNT Digital Library
Relation of Turbojet Propulsion System Development to the Strategic Bomber Mission (open access)

Relation of Turbojet Propulsion System Development to the Strategic Bomber Mission

Memorandum presenting a generalized analysis of the effects of turbojet propulsion system development and fuel selection on ability of a strategic bomber to perform desired and minimum missions. The variation of bomber performance using a hydrocarbon, boron, or nuclear fuel is discussed.
Date: August 15, 1956
Creator: Rothrock, Addison M.; Cesaro, Richard S. & Walker, Curtis L.
System: The UNT Digital Library
An Analytic Study of Turbojet Engine Thrust Augmentation With Liquid Hydrogen, Pentaborane, Magnesium Slurry, and JP-4 Afterburner Fuels and a 220-Second Impulse Rocket (open access)

An Analytic Study of Turbojet Engine Thrust Augmentation With Liquid Hydrogen, Pentaborane, Magnesium Slurry, and JP-4 Afterburner Fuels and a 220-Second Impulse Rocket

Memorandum presenting a computation and comparison of the thrust augmentation and accompanying total fuel flow for four afterburner fuels and a rocket. Four turbojet engines burning JP-4 primary fuel and several operating conditions were selected for the analyses.
Date: August 15, 1956
Creator: Morris, James F.
System: The UNT Digital Library
A low-speed experimental investigation of the effect of a sandpaper type of roughness on boundary-layer transition (open access)

A low-speed experimental investigation of the effect of a sandpaper type of roughness on boundary-layer transition

From Summary: "An investigation was made in the Langley low-turbulence pressure tunnel to determine the effect of size and location of a sandpaper type of roughness on the Reynolds number for transition. Transition was observed by means of a hot-wire anemometer located at various chordwise stations for each position of the roughness. These observations indicated that when the roughness is sufficiently submerged in the boundary layer to provide a substantially linear variation of boundary-layer velocity with distance from the surface up to the top of the roughness, turbulent "spots" begin to appear immediately behind the roughness when the Reynolds number based on the velocity at the top of the roughness height exceeds a value of approximately 600. At Reynolds numbers even slightly below the critical value (value for transition), the sandpaper type of roughness introduced no measurable disturbances into the laminar layer downstream of the roughness. The extent of the roughness area does not appear to have an important effect on the critical value of the roughness Reynolds number."
Date: August 15, 1956
Creator: von Doenhoff, Albert E. & Horton, Elmer A.
System: The UNT Digital Library
HRT-CP ENGINEERING TEST PROCEDURE P-1 WESTINGHOUSE CIRCULATING PUMP (open access)

HRT-CP ENGINEERING TEST PROCEDURE P-1 WESTINGHOUSE CIRCULATING PUMP

None
Date: August 15, 1956
Creator: Novak, P.E.
System: The UNT Digital Library
FEED MATERIALS PROCESSING STATUS REPORT FOR AUGUST 1956 (open access)

FEED MATERIALS PROCESSING STATUS REPORT FOR AUGUST 1956

None
Date: August 15, 1956
Creator: Blanco, R. E. & Eister, W. K.
System: The UNT Digital Library
Phase 3 Design Analysis for the Army Package Power Reactor: Volume 1 (Design Analysis) (open access)

Phase 3 Design Analysis for the Army Package Power Reactor: Volume 1 (Design Analysis)

From foreword: "This report consists of two volumes which comprise the Phase III Design Analysis for the Army Package Power Reactor." The first volume discusses design analysis of the reactor.
Date: August 15, 1956
Creator: unknown
System: The UNT Digital Library
Relation of turbojet propulsion system development to the strategic bomber mission (open access)

Relation of turbojet propulsion system development to the strategic bomber mission

From Summary: "A generalized analysis presents the effects of turbojet propulsion system development and fuel selection on ability of a strategic bomber to perform desired and minimum missions. The variation of bomber performance using a hydrocarbon, boron, or nuclear fuel is discussed. With chemical fuel, the effects of refueling are discussed. With nuclear fuel, the nuclear cruise-chemical dash bomber and the nuclear subsonic tug towing a chemically powered supersonic bomber are compared."
Date: August 15, 1956
Creator: Rothrock, Addison M.; Cesaro, Richard S. & Walker, Curtis L.
System: The UNT Digital Library
Savannah River Plant 100 Area reactors monthly report, July 1956 (open access)

Savannah River Plant 100 Area reactors monthly report, July 1956

This report presents details of the operations of the Savannah River Plant manufacturing division during the month of July 1956.
Date: August 15, 1956
Creator: unknown
System: The UNT Digital Library