1 Matching Results
Results open in a new window/tab.
Results:
1 - 1 of
1
Weekly progress report -- Technical Section for period ending June 12, 1943
Progress was reported from the 300, 100, and 200 Areas. It covered the X pile, aluminium corrosion, graphite purity, fuel element fabrication, bismuth phosphate extraction and decontamination processes, waste disposal from bismuth phosphate processing, control rod systems for Site W, shielding problems at the Site W separation plant, fuel element failure detection, power distribution in the Clinton pile, reactor instrumentation for Site W.
Date:
June 15, 1943
Creator:
unknown
System:
The UNT Digital Library