Radioactive contamination in liquid wastes discharged to ground at separations facilities through June 1956 (open access)

Radioactive contamination in liquid wastes discharged to ground at separations facilities through June 1956

This document summarizes the amounts of radioactive contamination discharged to the ground from separation facilities through June 1956. Detailed data for individual disposal sites is presented on a month to month basis for the period July 1955 through June 1956. The major disposal sites in separation facilities, total volume of waste discharged at each location, and the gross amounts of plutonium and fission products discharged to the ground since startup are listed. This same data are presented on a month to month basis and also include information on the source of the waste stream and the settling facility used. Isotopic data are included for all disposal sites from which the waste was analyzed for specific contaminants. Estimates of contamination and volumes discharged to the swamps are also included.
Date: August 13, 1956
Creator: Heid, K. R.
Object Type: Report
System: The UNT Digital Library
Texas Attorney General Opinion: S-212 (open access)

Texas Attorney General Opinion: S-212

Document issued by the Office of the Attorney General of Texas in Austin, Texas, providing an interpretation of Texas law. It provides the opinion of the Texas Attorney General, John Ben Shepperd, regarding a legal question submitted for clarification: Inclusion in gross receipts of proceeds from the sale of corporate capital assets for franchise tax purposes under Article 7084, V.C.S.
Date: August 13, 1956
Creator: Texas. Attorney-General's Office.
Object Type: Text
System: The Portal to Texas History
Productivity improvement program and related projects (open access)

Productivity improvement program and related projects

Design and construction schedules and forecast monetary allowances for projects in the 100 Areas, 200 Areas, 300 Areas, and 700 Area of Savannah River Plant have recently been reviewed. There has been no change in the overall funds now forecast for the program, although there has been changes in the distribution of the total between various areas.
Date: August 13, 1956
Creator: Evans, R. M.
Object Type: Report
System: The UNT Digital Library
HRT DRAWINGS--CROSS REFERENCE LISTING (open access)

HRT DRAWINGS--CROSS REFERENCE LISTING

None
Date: August 13, 1956
Creator: Zapf, F.C.
Object Type: Report
System: The UNT Digital Library
FUNDAMENTALS OF DIFFUSIONAL BONDING--I. First Annual Progress Report, June 30, 1955 to June 30, 1956 (open access)

FUNDAMENTALS OF DIFFUSIONAL BONDING--I. First Annual Progress Report, June 30, 1955 to June 30, 1956

None
Date: August 13, 1956
Creator: Castleman, L. & Seigle, L.
Object Type: Report
System: The UNT Digital Library
Status report for chemical development, sections A and B for week ending August 3, 1956 (open access)

Status report for chemical development, sections A and B for week ending August 3, 1956

None
Date: August 13, 1956
Creator: Blanco, R. E. & Ferguson, D. E.
Object Type: Report
System: The UNT Digital Library
Metallurgical Examination of K-Loop Fuel Elements Resulting from Rupture Incident (open access)

Metallurgical Examination of K-Loop Fuel Elements Resulting from Rupture Incident

The first and third slugs downstream from the H-Loop ruptured and a piece of can wall from the ruptured slug were received from Pile Materials Sub-Section for metallurgical examination. The examination has been completed and the extent and type off aluminum corrosion which occurred on these samples has been determined.
Date: August 13, 1956
Creator: Mallett, G. R.
Object Type: Report
System: The UNT Digital Library
Neptunium-239 in disassembly basin water (open access)

Neptunium-239 in disassembly basin water

Since the presence of neptunium-239 in disassembly basin water had been suggested, analysis of the water was undertaken. The occurrence of Np-239 was thought to be due to its diffusion through the slugs. Samples of water from the D and E Canals in K and R-Areas were analyzed to determine the presence of Np-239. Samples from and K and R Areas both showed Np-239 to be present in quantities greater than 50% of the initial total activity.
Date: August 13, 1956
Creator: Carlton, W. H. & Boni, A. L.
Object Type: Report
System: The UNT Digital Library