236-Z canyon utilization study (open access)

236-Z canyon utilization study

The 236-Z canyon contains equipment for repurification of plutonium and recovery of plutonium from scrap material. To meet production requirements of Fast Flux Test Facility/Clinch River Breeder Reactor oxide with the existing plant, several new pieces of equipment will be needed in the future. More storage space and a better accountability system are needed to support this increased production. The available canyon space needs to be utilized to its fullest in order to accommodate the new equipment. The purpose of this document is to identify the new pieces of equipment, show how they fit into the flowsheet, and locate them in the canyon.
Date: March 8, 1977
Creator: Dixon, D.R
Object Type: Report
System: The UNT Digital Library
Geothermal commercial power plant study. Monthly progress report, January 1-January 28, 1977 (open access)

Geothermal commercial power plant study. Monthly progress report, January 1-January 28, 1977

The major effort was concentrated on plant operating modes. The 50 MWe (Net) base case plant conceptual design, developed during the initial effort of this project, was modified to reflect substantially improved turbine-generator efficiencies. A capital cost estimate was prepared for the new base case using the fourth-quarter 1976 price level. Curves showing the geothermal fluid temperature decline with time, for all cases under study, were calculated by Chevron with their reservoir computer model, using input data provided by Bechtel. With this data, curves of required brine flow rate versus time were prepared for the 50,100 and 200 MWe plants that employ the constant power output operating mode. These flow rate curves form the bases for conceptual designs and corresponding capital cost estimates which are the next work items. The capital cost estimates for the Niland multistage-flash/binary plants with and without regeneration were escalated from fourth-quarter 1975 to fourth-quarter 1976.
Date: March 8, 1977
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Alternate HSA design requirements (open access)

Alternate HSA design requirements

The requirements definition and a small amount of conceptual layout work which was performed for ERDA to provide assistance to NASA in conjunction with a program to develop advanced heat source assembly designs for use in the Brayton Isotope Power Systems (BIPS) are summarized.
Date: March 8, 1977
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Texas Register, Volume 2, Number 19, Pages 827-856, March 8, 1977 (open access)

Texas Register, Volume 2, Number 19, Pages 827-856, March 8, 1977

A weekly publication, the Texas Register serves as the journal of state agency rulemaking for Texas. Information published in the Texas Register includes proposed, adopted, withdrawn and emergency rule actions, notices of state agency review of agency rules, governor's appointments, attorney general opinions, and miscellaneous documents such as requests for proposals. After adoption, these rulemaking actions are codified into the Texas Administrative Code.
Date: March 8, 1977
Creator: Texas. Secretary of State.
Object Type: Journal/Magazine/Newsletter
System: The Portal to Texas History
Texas Attorney General Opinion: H-950 (open access)

Texas Attorney General Opinion: H-950

Document issued by the Office of the Attorney General of Texas in Austin, Texas, providing an interpretation of Texas law. It provides the opinion of the Texas Attorney General, John L. Hill, regarding a legal question submitted for clarification; Payment of remittance of a judgement of a bail bond forfeiture.
Date: March 8, 1977
Creator: Texas. Attorney-General's Office.
Object Type: Text
System: The Portal to Texas History