6,391 Matching Results

Results open in a new window/tab.

2 MW upgrade of the Fermilab Main Injector (open access)

2 MW upgrade of the Fermilab Main Injector

In January 2002, the Fermilab Director initiated a design study for a high average power, modest energy proton facility. An intensity upgrade to Fermilab's 120-GeV Main Injector (MI) represents an attractive concept for such a facility, which would leverage existing beam lines and experimental areas and would greatly enhance physics opportunities at Fermilab and in the U.S. With a Proton Driver replacing the present Booster, the beam intensity of the MI is expected to be increased by a factor of five. Accompanied by a shorter cycle, the beam power would reach 2 MW. This would make the MI a more powerful machine than the SNS or the J-PARC. Moreover, the high beam energy (120 GeV) and tunable energy range (8-120 GeV) would make it a unique high power proton facility. The upgrade study has been completed and published. This paper gives a summary report.
Date: June 4, 2003
Creator: Chou, Weiren
Object Type: Article
System: The UNT Digital Library
3-D computer simulations of EM fields in the APS vacuum chamber: Part 1, Frequency-domain analysis (open access)

3-D computer simulations of EM fields in the APS vacuum chamber: Part 1, Frequency-domain analysis

The vacuum chamber proposed for the storage ring of the 7-GeV Advanced Photon Source (APS) basically consists of two parts: the beam chamber and the antechamber, connected to each other by a narrow gap. A sector of 1-meter-long chamber with dosed end plates, to which are attached the 1-inch-diameter beampipes centered at the beam chamber, has been built for experimental purposes. The 3-D code MAFIA has been used to simulate the frequency-domain behaviors of EM fields in this setup. The results are summarized in this note and are compared with that previously obtained from 2-D simulations and that from network analyzer measurements. They are in general agreement. A parallel analysis in the time-domain is reported in a separate note. The method of our simulations can be briefly described as follows. The 1-inch diameter beampipes are terminated by conducting walls at a length of 2 cm. The whole geometry can thus be considered as a cavity. The lowest RF modes of this geometry are computed using MAFIA. The eigenfrequencies of these modes are a direct output of the eigenvalue solver E3, whereas the type of each mode is determined by employing the postprocessor P3. The mesh sizes are chosen such that …
Date: September 4, 1990
Creator: Chou, W. & Bridges, J.
Object Type: Report
System: The UNT Digital Library
An 8-GeV Synchrotron-Based Proton Driver (open access)

An 8-GeV Synchrotron-Based Proton Driver

In January 2002, the Fermilab Director initiated a design study for a high average power, modest energy proton facility. Such a facility is a possible candidate for a construction project in the U.S. starting in the middle of this decade. The key technical element is a new machine, dubbed the ''Proton Driver,'' as a replacement of the present Booster. The study of an 8-GeV synchrotron-based proton driver has been completed and published. This paper will give a summary report, including machine layout and performance, optics, beam dynamics issues, technical systems design, civil construction, cost estimate and schedule.
Date: June 4, 2003
Creator: Chou, Weiren
Object Type: Article
System: The UNT Digital Library
9/11 Commission Recommendations: Implementation Status (open access)

9/11 Commission Recommendations: Implementation Status

From Introduction: "This report provides a review of the 9/11 Commission recommendations and the status of their implementation at the end of the 109th Congress. The discussions herein are organized on the basis of policy themes that are core of the 9/11 Commission's recommendations, rather than a review of every numbered item set out in the Commission's final report."
Date: December 4, 2006
Creator: Grimmett, Richard F.
Object Type: Report
System: The UNT Digital Library
A 14.6 Arcsecond Quasar Lens Split by a Massive Dark Matter Halo (open access)

A 14.6 Arcsecond Quasar Lens Split by a Massive Dark Matter Halo

Gravitational lensing is a powerful tool to study the distribution of dark matter in the universe. The cold dark matter model of structure formation predicts the existence of quasars gravitationally lensed by concentrations of dark matter so massive that the quasar images would be split by over 7 inches. However, numerous searches for large-separation lensed quasars have been unsuccessful; all of the roughly 70 lensed quasars known to date, such as Q0957+561, have smaller splittings, and can be explained in terms of galaxy scale concentrations of baryonic matter that have undergone dissipative collapse. Here they report the discovery of the first large-separation lensed quasar, SDSS J1004+4112, with a maximum separation of 14.62 inches; at this separation, the lensing object must be dominated by dark matter. While gravitationally lensed galaxies of even large separation are known, large-separation quasars are more useful cosmological probes because of the simplicity of the resulting lens systems. The discovery in their current quasar sample is fully consistent with the theoretical expectations based on the cold dark matter model.
Date: December 4, 2003
Creator: Inada, N.; Oguri, M.; Pindor, B.; Hennawi, J.; Chiu, K.; Zheng, W. et al.
Object Type: Article
System: The UNT Digital Library
20 kW Transmitter for CW Operation at 50 or 17 MHz (open access)

20 kW Transmitter for CW Operation at 50 or 17 MHz

This report was prepared as an account of work sponsored by an agency of the United States Government.
Date: April 4, 1978
Creator: Keane, J. T.
Object Type: Report
System: The UNT Digital Library
45-Day safety screen results for Tank 241-U-201, push mode, cores 70, 73 and 74 (open access)

45-Day safety screen results for Tank 241-U-201, push mode, cores 70, 73 and 74

Three core samples, each having two segments, from Tank 241-U-201 (U-201) were received by the 222-S Laboratories. Safety screening analysis, such as differential scanning calorimetry (DSC), thermogravimetric analysis (TGA), and total alpha activity were conducted on Core 70, Segment 1 and 2 and on Core 73, Segment 1 and 2. Core 74, Segment 1 and 2 were taken to test rotary bit in push mode sampling. No analysis was requested on Core 74, Segment 1 and 2. Analytical results for the TGA analyses for Core 70, Segment 1, Upper half solid sample was less than the safety screening notification limit of 17 percent water. Notification was made on April 27, 1995. No exotherm was associated with this sample. Analytical results are presented in Tables 1 to 4, with the applicable notification limits shaded.
Date: May 4, 1995
Creator: Sathyanarayana, P.
Object Type: Report
System: The UNT Digital Library
45-day safety screening results for Tank 241-U-107, Push Mode Cores 129, 134 and 135 (open access)

45-day safety screening results for Tank 241-U-107, Push Mode Cores 129, 134 and 135

This document summarizes the results of the push mode core samples for tank 241-U-107.
Date: June 4, 1996
Creator: Jo, J., Westinghouse Hanford
Object Type: Report
System: The UNT Digital Library
100 Areas monthly report, January 1952 (open access)

100 Areas monthly report, January 1952

This document provides the monthly reports for January 1952 through December 1952. These reports detail activities in the 100 areas during this time period. (FI)
Date: February 4, 1952
Creator: Paulovich, K. F.
Object Type: Report
System: The UNT Digital Library
100 Areas technical activities report: Physics, March 1947 (open access)

100 Areas technical activities report: Physics, March 1947

U.M. Staebier reports from the pile areas. Foil tests were conducted at the B pile. A power coefficient test was performed at the D pile; special request materials and reactivity balance are also reported. The new No. 2 horizontal rod of the F pile has been slightly resized. Graphite temperature readings, thermal conductivity calculations, special request materials, and reactivity balance are also reported. General physics are considered. Production tests 105-85-P and 106-1-P are reported. Egg testing at the 305 test pile is discussed. (GHH)
Date: April 4, 1947
Creator: Gast, P. F.
Object Type: Report
System: The UNT Digital Library
100-D unit purge (open access)

100-D unit purge

None
Date: June 4, 1945
Creator: unknown
Object Type: Report
System: The UNT Digital Library
105-K Basin Material Design Basis Feed Description for Spent Nuclear Fuel (SNF) Project Facilities VOL 1 Fuel (open access)

105-K Basin Material Design Basis Feed Description for Spent Nuclear Fuel (SNF) Project Facilities VOL 1 Fuel

Metallic uranium Spent Nuclear Fuel (SNF) is currently stored within two water filled pools, 105-KE Basin (KE Basin) and 105-KW Basin (KW Basin), at the United States Department of Energy (U.S. DOE) Hanford Site, in southeastern Washington State. The Spent Nuclear Fuel Project (SNF Project) is responsible to DOE for operation of these fuel storage pools and for the 2100 metric tons of SNF materials that they contain. The SNF Project mission includes safe removal and transportation of all SNF from these storage basins to a new storage facility in the 200 East Area. To accomplish this mission, the SNF Project modifies the existing KE Basin and KW Basin facilities and constructs two new facilities: the 100 K Area Cold Vacuum Drying Facility (CVDF), which drains and dries the SNF; and the 200 East Area Canister Storage Building (CSB), which stores the SNF. The purpose of this document is to describe the design basis feed compositions for materials stored or processed by SNF Project facilities and activities. This document is not intended to replace the Hanford Spent Fuel Inventory Baseline (WHC 1994b), but only to supplement it by providing more detail on the chemical and radiological inventories in the fuel …
Date: November 4, 1999
Creator: Packer, M. J.
Object Type: Report
System: The UNT Digital Library
200 Area weekly report (open access)

200 Area weekly report

None
Date: August 4, 1955
Creator: Christl, R. J.
Object Type: Report
System: The UNT Digital Library
209-E Upgrades (open access)

209-E Upgrades

Pacific Northwest Laboratory has initiated a review of the Safeguards and Security systems at the Critical Mass Laboratory with regards to determining appropriate upgrading actions that assure that an effective and efficient Safeguards and Security posture consistent with DOE-RL policies, procedures, and priorities is effected. As a result of this review, PNL has concluded that specific upgrades are required at CML that provide a demonstrated enhancement to the overall security posture of the facility and are based upon prudent expenditures of government funds. It was further concluded that additional recommended upgrades provide minimal improvement to the overall security system at a significant outlay of funds.
Date: February 4, 1985
Creator: Merrill, B. J. & DeMyer, J. J.
Object Type: Report
System: The UNT Digital Library
242-A Evaporator quality assurance plan. Revision 2 (open access)

242-A Evaporator quality assurance plan. Revision 2

The purpose of this quality assurance project plan (Plan) is to provide requirements for activities pertaining to sampling, shipping, and analyses associated with candidate feed tank samples for the 242-A Evaporator project. The purpose of the 242-A Evaporator project is to reduce the volume of aqueous waste in the Double Shell Tank (DST) System and will result in considerable savings to the disposal of mixed waste. The 242-A Evaporator feed stream originates from DSTs identified as candidate feed tanks. The 242-A Evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending the condensate (called process condensate) to the Liquid Effluent Retention Facility (LEPF) storage basin where it is stored prior to treatment in the Effluent Treatment Facility (ETF). The objective of this quality assurance project plan is to provide the planning, implementation, and assessment of sample collection and analysis, data issuance, and validation activities for the candidate feed tanks.
Date: May 4, 1995
Creator: Basra, T. S.
Object Type: Report
System: The UNT Digital Library
242-A evaporator quality assurance project plan: Revision 1 (open access)

242-A evaporator quality assurance project plan: Revision 1

The scope of this quality assurance project plan (Plan) is sampling and analytical services including, but not limited to, sample receipt, handling and storage, analytical measurements, submittal of data deliverables, archiving selected portions of samples, returning unneeded sample material to Westinghouse Hanford Company (WHC), and/or sample disposal associated with candidate feed samples and process condensate compliance samples. Sampling and shipping activities are also included within the scope. The purpose of this project is to provide planning, implementation, and assessment guidance for achieving established data quality objectives measurement parameters. This Plan requires onsite and offsite laboratories to conform to that guidance. Laboratory conformance will help ensure that quality data are being generated and therefore, that the 242-A evaporator is operating in a safe and compliant manner. The 242-A evaporator feed stream originates from double-shell tanks (DSTs) identified as candidate feed tanks. The 242-A evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending it to the Liquid Effluent Retention Facility (LERF) storage basin before further treatment. The slurry product is returned to DSTs. Evaporation results in considerable savings by reducing the volume of mixed waste for disposal.
Date: November 4, 1994
Creator: Tucker, B. J.
Object Type: Report
System: The UNT Digital Library
340 Waste handling facility interim safety basis (open access)

340 Waste handling facility interim safety basis

This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.
Date: October 4, 1996
Creator: Stordeur, R.T.
Object Type: Report
System: The UNT Digital Library
880 nanosecond particle in cell mover for the CDC 7600 (open access)

880 nanosecond particle in cell mover for the CDC 7600

A very fast computational method of moving particles for one dimensional electrostatic plasma simulations using integer arithmetic is described. The cloud in cell method forms the basis of this technique. This paper is in the form of a compass compilable subroutine with comments and examples describing methods of using an entirely integer representation to gain up to an order of magnitude increase in speed over equivalent floating point Fortran coding. Integer arithmetic has several advantages over floating point arithmetic for one dimensional particle movers. The adds are much faster, and the binary numerical description allows the implementation of very simple boundary conditions if the simulation region extends from zero to a power of two. Furthermore, integer arithmetic makes very efficient use of each memory bit since there is no floating point exponent. Consequently, it becomes feasible and fast in long word length machines to pack the velocity and position of a particular particle into the same word, thus saving a factor of two in computer storage and/or 10. These advantages are combined with the fact that integer adds and logicals complete in only two computer cycles allowing nearly complete optimization of register and instruction interleaving. The measured timings on a …
Date: October 4, 1977
Creator: Estabrook, K. & Tull, J. E.
Object Type: Report
System: The UNT Digital Library
911 Call Center Legislation: S. 1250 and H.R. 2898 (open access)

911 Call Center Legislation: S. 1250 and H.R. 2898

This article discusses the 2003 Congress bipartisan E911 (Enhanced 911) legislation introduced in both chambers. Moreover, the article describes the difference in parallel provisions each bill contains that have significant implications for emergency communication policy. The article defines Enhanced 911 as the capability of identifying the phone number and location of a call to a PSAP (Public Safety Answering Points). This report characterizes the cost to PSAPs of upgrading systems and supporting expanded operations as an obstacle to this legislation.
Date: August 4, 2004
Creator: Moore, Linda K.
Object Type: Report
System: The UNT Digital Library
1099 Information Reporting Requirements and Penalties as Modified by the Patient Protection and Affordable Care Act and the Small Business Jobs Act of 2010 (open access)

1099 Information Reporting Requirements and Penalties as Modified by the Patient Protection and Affordable Care Act and the Small Business Jobs Act of 2010

This report discuses the 2010 expansion of reporting requirements listed in IRC (Internal Revenue Code) 6041. The controversy in these expansions lies in the burden the expansion imposes on small businesses. The report also describes the pieces of legislation that have amended IRC 6041, and the implications of that legislation along with the consequences of IRC 6041.
Date: March 4, 2011
Creator: Pettit, Carol A. & Liu, Edward C.
Object Type: Report
System: The UNT Digital Library
1500 MHZ Passive SRF Cavity for Bunch Lengthening in the NSLS-II Storage Ring (open access)

1500 MHZ Passive SRF Cavity for Bunch Lengthening in the NSLS-II Storage Ring

NSLS-II is a new ultra-bright 3 GeV 3rd generation synchrotron radiation light source. The performance goals require operation with a beam current of 500mA and a bunch current of at least 0.5mA. Ion clearing gaps are required to suppress ion effects on the beam. The natural bunch length of 3mm is planned to be lengthened by means of a third harmonic cavity in order to increase the Touschek limited lifetime. After an extensive investigation of different cavity geometries, a passive, superconducting two-cell cavity has been selected for prototyping. The cavity is HOM damped with ferrite absorbers on the beam pipes. The two-cell cavity simplifies the tuner design, compared to having two independent cells. Tradeoffs between the damping of the higher order modes, thermal isolation associated with the large beam tubes, and overall cavity length are described. A copper prototype has been constructed, and measurements of fundamental and higher order modes will be compared to calculated values.
Date: May 4, 2009
Creator: Yanagisawa,T.; Rose, J.; Grimm, T. & Bogle, A.
Object Type: Article
System: The UNT Digital Library
1993 BRAC Commission Report (open access)

1993 BRAC Commission Report

Defense Base Closure and Realignment Commission 1993 Report to the President.
Date: January 4, 2006
Creator: unknown
Object Type: Book
System: The UNT Digital Library
1995 BRAC Commission Report (open access)

1995 BRAC Commission Report

1995 BRAC Commission Final Report to the President.
Date: January 4, 2006
Creator: unknown
Object Type: Book
System: The UNT Digital Library
The 1996 Farm Bill: Comparisons of Selected Provisions with Previous Law (open access)

The 1996 Farm Bill: Comparisons of Selected Provisions with Previous Law

Final congressional approval was given to H.R. 2854, the Federal Agricultural Improvement and Reform (FAIR) Act, otherwise known as the "1996 farm bill," on March 28, 1996. President Clinton signed the bill into law on April 4, 1996 (P.L. 104-127). In tabular format, this CRS report lays out in descriptive, rather than legislative language, the major provisions of the new farm bill in contrast to preceding law.
Date: April 4, 1996
Creator: Library of Congress. Environment and Natural Resources Policy Division. Food and Agriculture Section.
Object Type: Report
System: The UNT Digital Library