Final Safety Analysis Report (FSAR) for Building 332, Increment III (open access)

Final Safety Analysis Report (FSAR) for Building 332, Increment III

This Final Safety Analysis Report (FSAR) supplements the Preliminary Safety Analysis Report (PSAR), dated January 18, 1974, for Building 332, Increment III of the Plutonium Materials Engineering Facility located at the Lawrence Livermore Laboratory (LLL). The FSAR, in conjunction with the PSAR, shows that the completed increment provides facilities for safely conducting the operations as described. These documents satisfy the requirements of ERDA Manual Appendix 6101, Annex C, dated April 8, 1971. The format and content of this FSAR complies with the basic requirements of the letter of request from ERDA San to LLL, dated March 10, 1972. Included as appendices in support of th FSAR are the Building 332 Operational Safety Procedure and the LLL Disaster Control Plan.
Date: August 31, 1977
Creator: Odell, B. N. & Toy, Jr., A. J.
System: The UNT Digital Library