Degree Discipline

Month

Comparing the Powers of Several Proposed Tests for Testing the Equality of the Means of Two Populations When Some Data Are Missing (open access)

Comparing the Powers of Several Proposed Tests for Testing the Equality of the Means of Two Populations When Some Data Are Missing

In comparing the means .of two normally distributed populations with unknown variance, two tests very often used are: the two independent sample and the paired sample t tests. There is a possible gain in the power of the significance test by using the paired sample design instead of the two independent samples design.
Date: May 1994
Creator: Dunu, Emeka Samuel
System: The UNT Digital Library
The Effect of Certain Modifications to Mathematical Programming Models for the Two-Group Classification Problem (open access)

The Effect of Certain Modifications to Mathematical Programming Models for the Two-Group Classification Problem

This research examines certain modifications of the mathematical programming models to improve their classificatory performance. These modifications involve the inclusion of second-order terms and secondary goals in mathematical programming models. A Monte Carlo simulation study is conducted to investigate the performance of two standard parametric models and various mathematical programming models, including the MSD (minimize sum of deviations) model, the MIP (mixed integer programming) model and the hybrid linear programming model.
Date: May 1994
Creator: Wanarat, Pradit
System: The UNT Digital Library
The Fixed v. Variable Sampling Interval Shewhart X-Bar Control Chart in the Presence of Positively Autocorrelated Data (open access)

The Fixed v. Variable Sampling Interval Shewhart X-Bar Control Chart in the Presence of Positively Autocorrelated Data

This study uses simulation to examine differences between fixed sampling interval (FSI) and variable sampling interval (VSI) Shewhart X-bar control charts for processes that produce positively autocorrelated data. The influence of sample size (1 and 5), autocorrelation parameter, shift in process mean, and length of time between samples is investigated by comparing average time (ATS) and average number of samples (ANSS) to produce an out of control signal for FSI and VSI Shewhart X-bar charts. These comparisons are conducted in two ways: control chart limits pre-set at ±3σ_x / √n and limits computed from the sampling process. Proper interpretation of the Shewhart X-bar chart requires the assumption that observations are statistically independent; however, process data are often autocorrelated over time. Results of this study indicate that increasing the time between samples decreases the effect of positive autocorrelation between samples. Thus, with sufficient time between samples the assumption of independence is essentially not violated. Samples of size 5 produce a faster signal than samples of size 1 with both the FSI and VSI Shewhart X-bar chart when positive autocorrelation is present. However, samples of size 5 require the same time when the data are independent, indicating that this effect is a …
Date: May 1993
Creator: Harvey, Martha M. (Martha Mattern)
System: The UNT Digital Library