Design, Fabrication and Bench Testing of a Texaco Infrared Ratio Pyrometer System for the Measurement of Gasifier Reaction Chamber Temperature, Quarterly Report: January-March 2003 (open access)

Design, Fabrication and Bench Testing of a Texaco Infrared Ratio Pyrometer System for the Measurement of Gasifier Reaction Chamber Temperature, Quarterly Report: January-March 2003

The cooperative agreement between Texaco and Polk Power has been revised by Polk Power and ChevronTexaco several times already. Lawyers from both Polk Power and ChevronTexaco are in the process to include the issues related to the ownership transfer of the Texaco gasification unit in the agreement and finalize the draft. The modification fieldwork and testing will start once the cooperative agreement is signed with Polk Power.
Date: April 2003
Creator: Leininger, Thomas F. & Huang, Hua-Min
System: The UNT Digital Library
Design, Fabrication and Bench Testing of a Texaco Infrared Ratio Pyrometer System for the Measurement of Gasifier Reaction Chamber Temperature, Quarterly Report: July-September 2003 (open access)

Design, Fabrication and Bench Testing of a Texaco Infrared Ratio Pyrometer System for the Measurement of Gasifier Reaction Chamber Temperature, Quarterly Report: July-September 2003

Polk Power and ChevronTexaco have signed the cooperative agreement at the end of reporting period. ChevronTexaco is shipping the pyrometer system to Tampa, Florida. Polk Power will start the modification fieldwork and installation of the system. The testing will start when the next opportunity is available.
Date: October 2003
Creator: Leininger, Thomas F. & Huang, Hua-Min
System: The UNT Digital Library
Design, Fabrication and Bench Testing of a Texaco Infrared Ratio Pyrometer System for the Measurement of Gasifier Reaction Chamber Temperature, Quarterly Report: October-December 2003 (open access)

Design, Fabrication and Bench Testing of a Texaco Infrared Ratio Pyrometer System for the Measurement of Gasifier Reaction Chamber Temperature, Quarterly Report: October-December 2003

ChevronTexaco has shipped the pyrometer system to Tampa, Florida. Polk Power is in the process of installing the mechanical, electrical and instrumentation of the pyrometer system as well as integrating the instrumentation to the test site Distributed Control System. The startup and field testing of the system will begin afterwards.
Date: January 2004
Creator: Leininger, Thomas F. & Huang, Hua-Min
System: The UNT Digital Library
Design, Fabrication and Bench Testing of a Texaco Infrared Ratio Pyrometer System for the Measurement of Gasifier Reaction Chamber Temperature, Quarterly Report: April-June 2003 (open access)

Design, Fabrication and Bench Testing of a Texaco Infrared Ratio Pyrometer System for the Measurement of Gasifier Reaction Chamber Temperature, Quarterly Report: April-June 2003

Polk Power has decided that the Texaco gasification unit will not be sold to a third party. Therefore, including the ownership transfer of the Texaco gasification unit in the agreement is not an issue any more. The cooperative agreement between Texaco and Polk Power has been revised several times in this quarter. Polk power is making comments on the last draft that Texaco sent to them. The modification fieldwork and testing will start once the cooperative agreement is signed with Polk Power.
Date: July 2003
Creator: Leininger, Thomas F. & Huang, Hua-Min