MATRIX 2 RESULTS OF THE FY07 ENHANCED DOE HIGH-LEVEL WASTE MELTER THROUGHPUT STUDIES AT SRNL (open access)

MATRIX 2 RESULTS OF THE FY07 ENHANCED DOE HIGH-LEVEL WASTE MELTER THROUGHPUT STUDIES AT SRNL

High-level waste (HLW) throughput (i.e., the amount of waste processed per unit time) is a function of two critical parameters: waste loading (WL) and melt rate. For the Waste Treatment and Immobilization Plant (WTP) at the Hanford Site and the Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS), increasing HLW throughput would significantly reduce the overall mission life cycle costs for the Department of Energy (DOE). The objective of this study was to generate supplemental validation data that could be used to determine the applicability of the current liquidus temperature (TL) model to expanded DWPF glass composition regions of interest based on higher WLs. Two specific flowsheets were used in this study to provide such insight: (1) Higher WL glasses (45 and 50%) based on future sludge batches that have (and have not) undergone the Al-dissolution process. (2) Coupled operations supported by the Salt Waste Processing Facility (SWPF), which increase the TiO{sub 2} concentration in glass to greater than 2 wt%. Glasses were also selected to address technical issues associated with Al{sub 2}O{sub 3} solubility, nepheline formation, and homogeneity issues for coupled operations. A test matrix of 28 glass compositions was developed to provide insight into these …
Date: October 23, 2008
Creator: Raszewski, F; Tommy Edwards, T & David Peeler, D
System: The UNT Digital Library
MATRIX 1 RESULTS OF THE FY07 ENHANCED DOE HIGH-LEVEL WASTE MELTER THROUGHPUT STUDIES AT SRNL (open access)

MATRIX 1 RESULTS OF THE FY07 ENHANCED DOE HIGH-LEVEL WASTE MELTER THROUGHPUT STUDIES AT SRNL

High-level waste (HLW) throughput (i.e., the amount of waste processed per unit time) is a function of two critical parameters: waste loading (WL) and melt rate. For the Waste Treatment and Immobilization Plant (WTP) at the Hanford Site and the Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS), increasing HLW throughput would significantly reduce the overall mission life cycle costs for the Department of Energy (DOE). It has been proposed that a team of glass formulation and processing experts at the Pacific Northwest National Laboratory (PNNL), Savannah River National Laboratory (SRNL), and Vitreous State Laboratory (VSL) at Catholic University of America develop a systematic approach to increase HLW throughput (by increasing WL with minimal or positive impacts on melt rate). Programmatically, this task is aimed at proof-of-principle testing and the development of tools to improve waste loading and melt rate, which will lead to higher waste throughput. The following four specific tasks have been proposed to meet this programmatic objective: (1) Integration and Oversight, (2) Crystal Accumulation Modeling (led by PNNL)/Higher Waste Loading Glasses (led by SRNL), (3) Melt Rate Evaluation and Modeling, and (4) Melter Scale Demonstrations. The details of these tasks can be found in …
Date: September 23, 2008
Creator: Raszewski, F; Tommy Edwards, T & David Peeler, D
System: The UNT Digital Library
The Budget for Fiscal Year 2007 (open access)

The Budget for Fiscal Year 2007

The Senate passed its version of the fiscal year 2007 budget resolution on March 16, 2006. After extended delays, the House passed its resolution on May 16, 2006. The extensive differences between the Senate and House versions of the FY2007 budget may prevent a House-Senate agreement. This report contains information on the background and analysis for the federal budget in the fiscal year 2007, the financial situation at that time, budgeting tools, budgetary actions, outlays, receipts, deficits, and related materials.
Date: May 23, 2006
Creator: Winters, Philip D.
System: The UNT Digital Library